dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Rahandusministeerium
Õigusakti eelnõuAvalik

„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamaksete korra kinnitamine

Rahandusministeerium · 25. mai 2026
Viit
1.1-10.1/2254-1
Registreeritud
25. mai 2026
Dokumendi liik
Õigusakti eelnõu
Funktsioon
1.1 ÜLDJUHTIMINE JA ÕIGUSALANE TEENINDAMINE
Sari
1.1-10.1 Ministeeriumis väljatöötatud õigusaktide eelnõud koos seletuskirjadega (Arhiiviväärtuslik)
Toimik
1.1-10.1/2026
Vastutaja
Rita Tubarik (Rahandusministeerium, Kantsleri vastutusvaldkond, Eelarvepoliitika valdkond, Riigieelarve osakond, Välisvahendite talitus)

Failid

  • 📎1.1-10.12254-1 25.05.2026 Õigusakti eelnõu.asice3892 KB

Sisu (failidest)

ADDENDUM TO THE RECOVERY AND RESILIENCE PLAN Contents PART 1: INTRODUCTION TO THE ADDENDUM ........................................................................................ 2 1. General objective ........................................................................................................................ 2 2. Justification for the addendum ................................................................................................... 2 PART 2: DESCRIPTION OF ADDITIONAL AND MODIFIED REFORMS AND INVESTMENTS........................ 2 Name of the modified component ......................................................................................................... 2 PART 3: COMPLEMENTARITY AND IMPLEMENTATION OF THE PLAN .................................................... 4 1. Consistency with other initiatives ............................................................................................... 5 2. Complementarity of funding....................................................................................................... 5 3. Effective implementation ........................................................................................................... 5 4. Consultation process of stakeholders ......................................................................................... 5 5. Control and audit ........................................................................................................................ 5 6. Communication ........................................................................................................................... 5 PART 4: OVERALL COHERENCE AND IMPACT OF THE PLAN ................................................................... 5 1. Coherence: .................................................................................................................................. 5 2. Gender equality and equal opportunities for all: ....................................................................... 5 3. Strengthening economic, social and institutional resilience: ..................................................... 5 4. Comparison with the investment baseline: ................................................................................ 5 EN 1 EN PART 1: INTRODUCTION TO THE ADDENDUM 1. General objective Following the latest amendment of the Estonian RRP, the reforms and investments implemented by the Estonia continue to be affected by the rapid pace of technological change, including the widespread adoption of new tools such as artificial intelligence, which has rendered parts of the training content outdated. Furthermore, the needs and expectations of participants have evolved significantly, with a stronger preference for more flexible, tailored, and practical learning formats. As a result, participation interest in the existing training programmes has declined, limiting their intended impact and necessitating minor revisions. 2. Justification for the addendum Article [21]: an amendment or submission of a new plan due to the plan, including relevant milestones and targets, being no longer achievable because of objective circumstances. PART 2: DESCRIPTION OF ADDITIONAL AND MODIFIED REFORMS AND INVESTMENTS Name of the modified component Investment/ reform CID Reform 1.4 reference Investment/ reform name Skills reform for the digital transformation of businesses Type of change compared to modified CID Legal base of the change ☐ Article 14(2) – loan request (select at least one) ☐ Article 18(2) – update of the maximum financial contribution ☒ Article 21 – amendment due to objective circumstances ☐ [Article 21a – REPowerEU resources] ☐ [Article 21b – new transfers] ☐ None of the above, correction of clerical error Elements modified (only for ☐ Component / Measure description modified measures) ☒Milestones and targets ☐ Estimated cost ☐ Green and digital tagging ☐ DNSH self-assessment EN 2 EN Description and justification of the change Within the RRF reform - Skills reform for the digital transformation of businesses measure, it has become evident that the participation in training activities target is currently not achievable. Compared to the period when the measure was originally designed, significant changes have occurred in both the economic environment and the ICT sector. The economic backdrop of 2023–2024 has been exceptionally challenging, leading companies to prioritise short-term operational continuity over staff development. Many firms, particularly in manufacturing and industry, responded by cutting jobs or freezing hiring; for example, manufacturing employment declined by approximately 6% from its 2022 peak by early 2024. Under these conditions, SMEs and larger employers alike have limited capacity to release employees for lengthy training programmes, even when the training itself is provided free of charge. Lowering the participation target therefore reflects a temporary but material absorption constraint and aligns expectations with what companies can realistically support under current economic stress. At the same time, developments in the ICT sector have diverged from earlier forecasts. According to OSKA ICT sector monitoring, the previously projected growth in demand for ICT specialists has not materialised to the expected extent, and demand has instead stabilised. This has reduced both individual and employer-driven interest in further training and large-scale retraining programmes. In practice, participation rates in the training programmes have remained below the procured training volume, pointing to saturation in the training market. Similar training opportunities targeting the same audience are currently offered in Estonia through multiple funding sources and measures (ESF/ERDF, Recovery and Resilience Facility, and Just Transition Fund measures), which further limits effective uptake. The rapid emergence and diffusion of AI has also influenced employer behaviour. While this has been flexibly considered during project implementation, many companies have begun adopting AI solutions based on their own company-specific needs. As a result, employers increasingly prefer their employees to participate in internal company-specific AI training and development activities tailored to their specific business context over external, standardised training programmes. Finally, completion rates in ICT training have been highly variable, with dropout rates ranging from 3% to 37%. The reasons for discontinuation vary: the ICT field is demanding, and participants have often underestimated the level of commitment required for long-term retraining programmes. These trainings were intentionally designed to include intensive and in-depth learning pathways, reflecting the programme’s focus on meaningful and sustainable skill transitions into specialist roles rather than maximising completion figures alone. Maintaining a clear quality threshold with regard to training scope, duration and completion therefore remains essential, and a reduced participation target supports this objective. Due to the reasons outlined above, we propose as a solution to reduce the target goal from 2000 to 1818. Modified elements Current version Amended version Component and / or - - measure description EN 3 EN Milestones and T13 T13 targets Name: The participation in Name: The participation in training activities training activities Quantitative indicator for Quantitative indicator for T13: T13: Training certificates Number of confirmed Goal: participations 2000 Goal: Description of T13: 1818 Number of certificates of Description of T13: graduation or certificates of Number of confirmed participations participation issued for in training activities supported training activities supported under this measure. under this measure capacity. Estimated cost - - Green and digital - - tagging DNSH self- - - assessment ) CID reference for the affected Component 1 (investment 1.5); Component 2 (investment 2.2; Measures 2.3); Component 3 (reform 3.6); Component 6 (reform 6.1) Legal base of the change (select at Article 14(2) – loan request least one) ☐ Article 18(2) – update of the maximum financial contribution ☒ Article 21 – amendment due to objective circumstances ☐ Article 21a – REPowerEU non-repayable financial support (ETS revenue) ☐ Article 21b (2) – BAR transfers ☒ None of the above, correction of clerical error Elements modified (only for ☐ Component / Measure description modified measures) ☒Milestones and targets ☐ Estimated cost ☐ Green and digital tagging (potentially relevant, because there is a substantive change to the underlying measure) ☐ DNSH self-assessment PART 3: COMPLEMENTARITY AND IMPLEMENTATION OF THE PLAN EN 4 EN 1. Consistency with other initiatives 2. Complementarity of funding 3. Effective implementation 4. Consultation process of stakeholders 5. Control and audit 6. Communication The previous indications remain unchanged. PART 4: OVERALL COHERENCE AND IMPACT OF THE PLAN 1. Coherence: 2. Gender equality and equal opportunities for all: 3. Strengthening economic, social and institutional resilience: 4. Comparison with the investment baseline: The previous indications remain unchanged. EN 5 EN Lisa 2 Taaste- ja vastupidavuskava alusel laekuva toetuse riigisisene väljamaksete kord Siseriiklik R/ M/ # Meetme nimi # Eesmärk/ siht Q a hind (al. I T 28.05.26)* MKM 1.1 Investeering I M 1 Projektikonkursi Q2 2022 11 600 000 arengusihtide ettevalmistamine saavutamisse koos hindamiskriteeriu mide ja toetuse andmise tingimustega MKM 1.1 Investeering T 2 Toetuste Q4 2023 23 200 000 arengusihtide määramine saavutamisse MKM 1.1 Investeering T 3 Toetuste Q4 2025 23 200 000 arengusihtide määramine saavutamisse KLIM 1.2 E-ehituse I M 4 Ehituse andmete Q4 2024 2 250 000 arendamine klassifitseerimiss üsteemi juurutamine KLIM 1.2 E-ehituse M 5 Avalike teenuste Q4 2025 0 arendamine kättesaadavus e- ehituse platvormil KLIM 1.2 E-ehituse T 6 Digitaalse Q4 2025 6 750 000 arendamine ehitustarkvara projektid MKM 1.3 E-veoselehe I T 7 Elektroonilise Q2 2023 1 500 000 teenuse kaubaveoteabe arendamine (eFTI) platvormide arendamine MKM 1.3 E-veoselehe T 8 E-veoselehe Q4 2024 0 teenuse (eCMR) liidese arendamine arendustööd MKM 1.3 E-veoselehe T 9 Lõpparuannete Q2 2026 4 500 000 teenuse vastuvõtmist arendamine kinnitanud asutuste arv MKM 1.3 E-veoselehe M 10 E-veoselehtede Q2 2026 0 teenuse väljatöötamise ja arendamine kasutuselevõtu järelhindamine HTM 1.4 Oskuste reform R M 11 Digioskuste Q2 2022 2 000 000 ettevõtete arendamise digipöördeks toetamise tingimusi sisaldavate teiseste õigusaktide jõustumine HTM 1.4 Oskuste reform T 12 Koolitustele Q4 2023 2 000 000 ettevõtete registreerumine digipöördeks HTM 1.4 Oskuste reform T 13 Osavõtt Q2 2026 2 000 000 ettevõtete koolitustest digipöördeks HTM 1.4 Oskuste reform T 14 Registreeritud Q4 2024 4 000 000 ettevõtete IKT- digipöördeks spetsialistide koolitusprogram mide ja kvalifikatsioonist andardite arv HTM 1.4 Oskuste reform T 15 IKT- Q4 2024 0 ettevõtete spetsialistide digipöördeks kvalifikatsioonist a ndardite läbivaatamine VÄM 1.5 Ettevõtete R M 16 Strateegiate Q2 2022 3 500 000 .1 konkurentsivõime väljatöötamise toetamine ettevalmistamine välisturgudel- katusreform VÄM 1.5 Ettevõtete M 17 Uuringute Q2 2024 3 500 000 .1 konkurentsivõime tellimine toetamine välisturgudel- katusreform VÄM 1.5 Ettevõtete T 18 Riigi- ja Q2 2026 11 085 000 .1 konkurentsivõime regioonipõhiste toetamine ekspordistrateegi välisturgudel- ate arv katusreform VÄM 1.5 Ettevõtete R M 19 Ettevalmistav Q2 2022 5 500 000 .2 konkurentsivõime analüüs toetamine ettevõtluskeskust välisturgudel- e sisustuse ja katusreform asukoha kindlaksmäärami seks VÄM 1.5 Ettevõtete T 20 Avatud Q2 2026 5 500 000 .2 konkurentsivõime ettevõtluskeskust toetamine e arv välisturgudel- katusreform VÄM 1.5 Ettevõtete R M 21 Löögirühmade Q2 2022 4 085 000 .3 konkurentsivõime loomine ja toetamine sihtkohtade välisturgudel- valimine katusreform ülemaailmsete digilähetuste jaoks VÄM 1.5 Ettevõtete T 22 Globaalsete Q2 2026 0 .3 konkurentsivõime löögirühmade toetamine lähetuste arv ja välisturgudel- nende katusreform suurürituste arv, kus Eesti on virtuaallavade kaudu esindatud *meetme lõpptulemuse eest tehtava toetuse väljamakse suuruseks on reformi/investeeringu eelarve piires 31.08.2026 seisuga tekkinud seni laekumata nõuete maht. KLIM 2.1 Ettevõtete R M 23 Rakkerühma ja Q4 2021 0 rohepööre töörühmade loomine KLIM 2.1 Ettevõtete R M 24 Ringmajanduse Q4 2022 0 rohepööre tegevuskava vastuvõtmine rohepöörde rakkerühmas HTM 2.2 Roheoskused I M 25 Teiseste Q2 2022 3 000 000 ettevõtete õigusaktide rohepöörde jõustumine toetamiseks HTM 2.2 Roheoskused T 26 Oskuste Q4 2024 0 ettevõtete täiendamise ja rohepöörde ümberõppemood toetamiseks ulite arv HTM 2.2 Roheoskused T 27 Koolitustunnistus Q2 2026 12 000 000 ettevõtete ed rohepöörde toetamiseks KLIM 2.3 Rohetehnoloogiate I M 28 Arendusprogram Q4 2021 2 095 000 arendusprogrammi mi kavandamise d ja koostamise töörühma moodustamine KLIM 2.3 Rohetehnoloogiate M 29 Rohetehnoloogia Q2 2024 2 095 000 arendusprogrammi te d arendusprogram mi käivitamine KLIM 2.3 Rohetehnoloogiate T 30 Rohetehnoloogia Q2 2026 0 arendusprogrammi te d arendusprogram mi kaudu toetatavate klastrite arv KLIM 2.3 Rohetehnoloogiate T 31 Rohetehnoloogia Q2 2026 4 190 000 arendusprogrammi arendusprogram d mi raames toetatud klastrite ja idufirmade arv MKM 2.4 Tootmisettevõtete I M 32 Toetuse andmise Q2 2022 1 800 000 ärimudeli tingimusi muutused sätestava ministri käskkirja jõustumine MKM 2.4 Tootmisettevõtete T 33 Lõpparuannete Q2 2026 7 200 000 ärimudeli vastuvõtmist muutused kinnitanud asutuste arv KLIM 2.5 Tööstusettevõtete I 34 34 Konkursikutse Q2 2022 4 800 000 ressursitõhusate avaldamine rohetehnoloogiate edendamine REM 2.5 Bioressurside I M 34 Konkursikutse Q2 2022 5 760 000 väärindamine avaldamine KLIM 2.5 Tööstusettevõtete T 35 Projektikonkursi Q4 2023 9 600 000 ressursitõhusate tulemusel rohetehnoloogiate sõlmitud edendamine lepingute arv REM 2.5 Bioressurside T 35 Projektikonkursi Q4 2023 11 520 000 väärindamine tulemusel sõlmitud lepingute arv KLIM 2.5 Tööstusettevõtete T 36 Lõpparuannete Q2 2026 9 600 000 ressursitõhusate vastuvõtmist rohetehnoloogiate kinnitanud edendamine asutuste arv REM 2.5 Bioressurside T 36 Projektide arv Q2 2026 6 520 000 väärindamine MKM 2.6 Rohefond I M 37 MKM ning Q4 2021 100 000 000 SmartCapi vahelise lepingu allakirjutamine MKM 2.6 Rohefond M 38 Investeerimispoli Q4 2021 x itika dokumendi vastuvõtmine SmartCapi poolt MKM 2.6 Rohefond T 39a Investeeringu Q3 2025 x elluviimine Majandus- ja Kommunikatsioo niministeeriumi poolt MKM 2.6 Rohefond T 40a Õiguslikud Q2 2026 x finantseerimislep ingud, mis on sõlmitud omakapitali- /riskikapitalifond idega KLIM 2.7 Vesiniku I M 41 Toetuse andmise Q4 2022 12 500 000 terviktehnoloogiat tingimusi e kasutuselevõtu sätestava edendamine ministri käskkirja jõustumine KLIM 2.7 Vesiniku M 42 Tehnoloogiad ja Q3 2025 0 terviktehnoloogiat seadmed e kasutuselevõtu terviklike edendamine rohevesiniku väärtusahelate loomiseks KLIM 2.7 Vesiniku T 43 Toetuste Q2 2026 0 terviktehnoloogiat lepingud e kasutuselevõtu allkirjastatud edendamine projektide jaoks vähemalt 11 miljoni euro MKM 2.8 Varustuskindluse I M 43a toetuse andmise Q4 2023 4 000 000 investeeringute tingimuste toetusmeede avaldamine MKM 2.8 Varustuskindluse T 43b avatud vooru Q4 2024 0 investeeringute tulemusel toetust toetusmeede saanud projektide arv MKM 2.8 Varustuskindluse T 43c Lõpparuannete Q2 2026 16 000 000 investeeringute vastuvõtmist toetusmeede kinnitavate asutuste arv JDM 3.1 Andmehalduse ja R M 44 Andmehaldusme Q4 2021 3 570 000 avaandmete eskonna oivakeskuse moodustamine loomine ja statistikaametis, väljaarendamine MKMis ning Riigi Infosüsteemi Ametis JDM 3.1 Andmehalduse ja T 45 Andmekvaliteedi Q2 2025 0 avaandmete parandamise oivakeskuse projektide loomine ja lõpuleviimine väljaarendamine JDM 3.1 Andmehalduse ja T 46 Andmekogude Q4 2025 8 320 000 avaandmete avaldamine oivakeskuse loomine ja väljaarendamine JDM 3.2 Eraisikutele R T 47 Eraisikute Q4 2022 2 456 000 sündmusteenuste elusündmusteenu ja etteaimavate ste ja/või teenuste etteaimavate väljaarendamine teenuste käivitamine JDM 3.2 Eraisikutele T 48 Veebipõhised Q4 2025 9 824 000 sündmusteenuste teenused isiklike ja etteaimavate eluürituste jaoks teenuste väljaarendamine MKM 3.3 Ettevõtja R T 49 Ärisündmustel Q4 2022 2 080 000 sündmusteenuste põhinevate ja digivärava teenuste ja väljaarendamine digivärava rakendamisele kaasa aitavate IT-arenduste kasutuselevõtt MKM 3.3 Ettevõtja T 50 IT arendused Q4 2025 18 720 000 sündmusteenuste veebis ja digivärava väljaarendamine JDM 3.4 #Bürokrati I T 51 Juurdepääs Q2 2022 3 493 333 programm (riikliku digitaalsetele virtuaalassistendi avalikele platvorm ja teenustele ökosüsteem) virtuaalassistendi platvormi kaudu JDM 3.4 #Bürokrati T 52 Bürokratt – Q4 2025 5 736 667 programm (riikliku virtuaalne virtuaalassistendi assistent avaliku platvorm ja sektori ökosüsteem) veebisaitidel JDM 3.4 #Bürokrati T 53 Juurdepääs Q4 2025 0 programm (riikliku digitaalsetele virtuaalassistendi avalikele teenustele platvorm ja virtuaalassistendi ökosüsteem) platvormi kaudu JDM 3.5 Digiriigi I M 54 Keskselt osutatud Q3 2022 10 707 500 baasteenuste / jagatud ümberkorraldamin ITbaasteenuste e ning turvaline väljaarendamine pilvetaristule üleminek JDM 3.5 Digiriigi T 55 Riikliku Q4 2023 7 138 333 baasteenuste privaatpilvetarist ümberkorraldamin u kasutuselevõtt e ning turvaline avaliku sektori pilvetaristule asutuste poolt üleminek JDM 3.5 Digiriigi M 56 Pilvetaristu Q4 2023 10 707 500 baasteenuste laiendamine ümberkorraldamin andmesaatkonnal e ning turvaline e pilvetaristule üleminek JDM 3.5 Digiriigi T 57 Elutähtsate Q4 2024 0 baasteenuste süsteemide ümberkorraldamin üleviimine e ning turvaline pilvelahendusega pilvetaristule andmesaatkonda üleminek JDM 3.5 Digiriigi T 58 Riigiasutuste Q4 2024 10 776 666 baasteenuste infosüsteemide ümberkorraldamin keskne e ning turvaline turvatestimine pilvetaristule üleminek RM 3.6 Rahapesu ja R M 59 Õigusaktide Q4 2024 400 000 terrorismi muudatuste rahastamise jõustumine strateegilise analüüsi uuele tasemele viimine Eestis RM 3.7 Rahapesu ja I M 60 Strateegilise Q2 2026 3 500 000 terrorismi reaalaja analüüsi IKT- strateegilise süsteem analüüsi süsteem JDM 3.8 Väga suure I T 61 Väga suure Q4 2024 0 läbilaskevõimega läbilaskevõimega lairibavõrkude lairibavõrgu ehitamine kasutuselevõtt uutes kohtades JDM 3.8 Väga suure T 62 Väga suure Q4 2025 24 290 000 läbilaskevõimega võimsusega lairibavõrkude lairibaühenduse ehitamine projektide kinnitatud arv KLIM 4.1 Energiatõhustamis R M 63 Koostöölepingu Q4 2022 0 e ja tervikliku sõlmimine, et rekonstrueerimise sätestada SA soodustamine Kredex / Enterprise Eesti ja maakondlike arenduskeskuste vahelise koostöö tingimused. KLIM 4.1 Energiatõhustamis R M 64 Kasutusele on Q4 2024 0 e ja tervikliku võetud rekonstrueerimise digitaalsed soodustamine vahendid, millega hõlbustada juurdepääsu rekonstrueerimist käsitlevale teabele, sealhulgas visualiseerida rekonstrueerimis e tulemusi ja hinnata rekonstrueerimis kulusid. KLIM 4.2 Korterelamute I M 65 Korterelamute Q2 2022 8 934 000 rekonstrueerimise rekonstrueerimist toetamine oetuse projektikonkurssi de väljakuulutamine KLIM 4.2 Korterelamute T 66 Suurema Q2 2026 35 736 000 rekonstrueerimise energiatõhususeg toetamine a korterelamud KLIM 4.2 Korterelamute T 67 Kasvuhoonegaasi Q2 2026 0 rekonstrueerimise de heite toetamine hinnanguline vähenemine aastas KLIM 4.3 Väikeelamute I M 68 Renoveerimistoet Q2 2022 6 260 000 rekonstrueerimise use toetamine projektikonkurssi de väljakuulutamine KLIM 4.3 Väikeelamute T 69 Suurema Q4 2024 0 rekonstrueerimise energiatõhususeg toetamine a väikeelamud KLIM 4.3 Väikeelamute T 69a Suurema Q1 2026 25 040 000 rekonstrueerimise energiatõhususeg toetamine a väikeelamud KLIM 4.4 Energiamajanduse R M 70 Valitsuse otsus Q2 2021 0 s rohepöörde investeeringute hoogustamine kohta, mis on vajalikud tuuleparkide riigikaitseliste kõrgusepiirangut e tühistamiseks. KLIM 4.4 Energiamajanduse R M 71 Valitsuse otsuse Q4 2021 0 s rohepöörde vastuvõtmine, et hoogustamine kiita heaks energiamajandus e arengukava koostamine ning määrata kindlaks vastutajad ja tähtajad. KLIM 4.4 Energiamajanduse R M 72 Õigusaktide Q4 2024 0 s rohepöörde muudatuste hoogustamine jõustumine KLIM 4.4 Energiamajanduse R M 73 Energiamajandus Q4 2025 0 s rohepöörde e arengukava hoogustamine vastuvõtmine valitsuses KLIM 4.5 Elektrivõrgu I M 74 Võrguinvesteerin Q1 2022 7 240 000 tugevdamise gute programm kaasrahastamise lepingu allkirjastamine põhivõrguettevõt jaga KLIM 4.5 Elektrivõrgu T 75 Täiendav Q2 2026 28 960 000 tugevdamise taastuvenergia programm liitumisvõimsus KLIM 4.6 Tööstusalades I M 76 Projektikonkursi Q4 2022 1 820 000 taastuvelektri väljakuulutamine tootmisseadmete tööstusaladel kasutuselevõtu energiatootmise hoogustamise hoogustamiseks programm KLIM 4.6 Tööstusalades T 77 Taastuvenergia Q2 2026 2 720 524 taastuvelektri tootmise jaoks on tootmisseadmete elektrivõrgus kasutuselevõtu loodud täiendav hoogustamise liitumisvõimsus. programm KLIM 4.7 Energia salvestuse I M 78 Energiasalvestus Q4 2022 1 920 000 pilootprogramm e pilootprogrammi projektikonkursi väljakuulutamine KLIM 4.7 Energia salvestuse T 79 Täiendav soojus- Q2 2026 7 680 000 pilootprogramm ja elektrienergia salvestusvõimsus KLIM 4.7 Energia salvestuse T 80 Investeeringutoet Q2 2026 0 pilootprogramm usest tulenev täiendav elektrisalvestusv õimsus KAM 4.8 Avamere I M 80a Radari ja Q4 2024 13 360 000 tuuleparkide passivradari arendamine süsteemi pakkujad välja valitud ja lepingud sõlmitud KAM 4.8 Avamere M 80b radar ja Q1 2026 0 tuuleparkide passivradar ning arendamine andurid on kasutusse võetud KAM 4.8 Avamere M 80c kõrguspiirang Q1 2026 53 440 000 tuuleparkide avamere arendamine tuulegeneraatorit ele Riia lahes ja Eesti saarte Hiiumaa, Saaremaa ja Vormsi piirkonnas on eemaldatud KLIM 5.1 Võtame kasutusele R M 81 Transpordi ja Q1 2022 0 ohutu, liikuvuse keskkonnahoidliku arengukava , (2021–2035) konkurentsivõimel vastuvõtmine ise, vajaduspõhise valitsuses ja jätkusuutliku transpordi- ja energiataristu KLIM 5.1 Võtame kasutusele R M 82 Transpordi ja Q4 2022 0 ohutu, liikuvuse keskkonnahoidliku arengukava , (2021–2035) konkurentsivõimel keskkonnasõbrali ise, vajaduspõhise ku ja säästliku ja jätkusuutliku transpordi transpordi- ja arendamise energiataristu rakendusplaani vastuvõtmine KLIM 5.1 Võtame kasutusele R M 83 Transpordi ja Q2 2026 0 ohutu, liikuvuse keskkonnahoidliku arengukava , (2021–2035) konkurentsivõimel rakendamine ise, vajaduspõhise ja jätkusuutliku transpordi- ja energiataristu KLIM 5.2 Multifunktsinaalne I M 84a leping töölaeva Q1 2024 3 600 000 .a töölaev ehitamiseks allkirjastatud KLIM 5.2 Multifunktsinaalne T 85a töölaev üle antud Q2 2026 18 959 476 .a töölaev KLIM 5.3 Rail Baltic I T 86a Rail Balticu Q3 2023 6 210 000 .a viaduktid ja viaduktide Ülemiste terminali esitamiseks osalised ehitustööd vajalikud lepingud on sõlmitud KLIM 5.3 Rail Baltic T 87a viaduktid on Q1 2026 32 819 987 .a viaduktid ja valminud Ülemiste terminali osalised ehitustööd KLIM 5.3 Rapla-Lelle I M 88 b Tööde Q1 2026 29 570 103 b raudteelõigu üleandmis- ümberehitus vastuvõtu aktid – renoveeritud on vähemalt 23km KLIM 5.4 Tallinna I M 89 Trammiteede Q4 2021 7 300 000 Vanasadama ehitusprojekti trammiliini lõpuleviimine rajamine KLIM 5.4 Tallinna M 90 Ehituslepingu Q2 2022 7 300 000 Vanasadama sõlmimine trammiliini rajamine KLIM 5.4 Tallinna T 91 Uus trammiliin Q4 2025 21 900 000 Vanasadama trammiliini rajamine REM 5.5 KOVide I M 92 Konkurss toetuse Q4 2022 1 000 000 investeeringud saamiseks jalgratta- ja/või jalgteedesse REM 5.5 KOVide T 93 Valminud Q4 2025 4 000 000 investeeringud jalgratta- ja jalgratta- ja/või jalgteede jalgteedesse projektid SOM 6.1 Eesti R M 94 Haiglavõrgu Q4 2024 0 tervishoiukorraldu arengukava se terviklik käsitleva muutmine valitsuse määruse jõustumine SOM 6.1 Eesti R M 95 Tervishoiutöötaja Q4 2022 0 tervishoiukorraldu te nappuse se terviklik leevendamise muutmine strateegilise raamistiku heakskiitmine SOM 6.1 Eesti R M 96 Tervishoiuteenus Q1 2023 0 tervishoiukorraldu te korraldamise se terviklik seadust käsitleva muutmine tervise- ja tööministri käskkirja jõustumine, et parandada arstide ja proviisorite kulude hüvitamise süsteemi. SOM 6.1 Eesti R M 96a Tervishoiuteenus Q2 2024 0 tervishoiukorraldu te korraldamise se terviklik seadust käsitleva muutmine tervise- ja tööministri käskkirja jõustumine, et parandada õdede kulude hüvitamise süsteemi. SOM 6.1 Eesti R T 97 Vastuvõtt Q4 2023 0 tervishoiukorraldu õenduse erialale se terviklik muutmine SOM 6.1 Eesti R M 98 Jõustub ministri Q2 2026 0 tervishoiukorraldu määrus, millega se terviklik muudetakse muutmine sotsiaalministeeri umi ja Tartu Ülikooli vahelist lepingut arstide nappuse kohta teatavatel erialadel. SOM 6.2 TERVIKUMI I M 99a TERVIKUMI Q2 2023 25 200 000 .a rajamine ehitamiseks hankeleping sõlmitud SOM 6.2 TERVIKUMI M 100 TERVIKUM Q4 2025 46 800 000 .a rajamine a valminud SOM 6.3 Tervishoiu R M 106 Eesti haigekassa Q3 2020 0 esmatasandi tervishoiuteenust tugevdamine e loetelu eriarstiabile juurdepääsu osa muutva valitsuse akti jõustumine. SOM 6.3 Tervishoiu R M 107 Jõustuvad Q1 2021 0 esmatasandi valitsuse akti tugevdamine muudatused, millega muudetakse Eesti haigekassa tervishoiuteenust e loetelu perearstide kulusid ja - teenuseid käsitlevat osa. SOM 6.3 Tervishoiu R M 108 Tervishoiuteenus Q1 2023 0 esmatasandi te korraldamise tugevdamine seaduse muudatuste jõustumine SOM 6.4 E-tervise R M 109 E-tervise Q2 2023 0 valitsemisraamisti valitsemisraamist ku uuendamine iku ja selle rakenduskava heakskiitmine MKM 6.6 Noorte tööpuudust I M 113 Meedet „Minu Q1 2022 2 000 000 vähendavate esimene töökoht“ tööturumeetmete tugevdava pakkumine terviseja tööministri käskkirja jõustumine. MKM 6.6 Noorte tööpuudust M 114 Noortegarantii Q2 2022 2 000 000 vähendavate tegevuskava tööturumeetmete pakkumine MKM 6.6 Noorte tööpuudust T 115 Tööjõuturuga Q4 2025 6 000 000 vähendavate seotud tööturumeetmete meetmetes pakkumine registreeritud noorte arv MKM 6.7 Töötuskindlustush R M 116 Tööturuteenuste Q2 2023 0 üvitiste ja -toetuste pikendamine seaduse ning töötuskindlustuse seaduse muudatuste jõustumine SOM 6.8 Pikaajaline R M 117 Sotsiaalhoolekan Q2 2022 0 hooldus de seaduse muudatuste jõustumine SOM 6.8 Pikaajaline R M 118 Integreeritud Q4 2022 0 hooldus sotsiaal- ja tervishoiuteenust e osutamise tegevuskava SOM 6.8 Pikaajaline R M 119 Sotsiaalkaitsemin Q4 2024 0 hooldus istri käskkirja jõustumine SOM 6.8 Pikaajaline R M 120 Suure Q1 2025 0 hooldus hooldusvajaduse ga laste toetussüsteemi parandamist käsitlevate seadusemuudatus te jõustumine MKM 6.9 Soolise palgalõhe R M 121 Heaolu Q1 2024 0 vähendamine arengukava (2023–2030) vastuvõtmine valitsuses MKM 6.9 Soolise palgalõhe R M 122 Digitaalne Q4 2022 0 vähendamine soolise palgalõhe töövahend MKM 6.9 Soolise palgalõhe R M 123 Digitaalne Q1 2024 0 vähendamine soolise palgalõhe töövahend RM 7.1 Taastekava R M 124 Jõustub valitsuse Q4 2021 0 juhtimis- ja määrus, millega kontrollisüsteemi on kehtestatud kehtestamine õigusraamistik Eesti taaste- ja vastupidavuskav a rakendamiseks ja järelevalveks. REM 8.1 Taastuvenergia R M 125 avatud vooru Q3 2023 2 000 000 arendamise avamine kiirendamine kohalikele omavalitsustele KLIM 8.1 Taastuvenergia R M 126 lubade Q2 2024 13 419 323 arendamise väljastamise, kiirendamine planeerimise ja keskkonnamõjud e hindamisega seotud protsesse puudutavate seadusemuudatus te jõustamine KLIM 8.1 Taastuvenergia M 127 tuuleenergia Q3 2024 13 419 323 arendamise arendamiseks kiirendamine sobivate eelisarendusalade kehtestamine valitsuse otsusega KLIM 8.2 Taastuvenergia I M 129 Elektrijaotusvõrg Q1 2024 7 600 000 tootmise võrku u tööde integreerimise rahastamisleping võimekus u allkirjastamine KLIM 8.2 Taastuvenergia T 130 Täiendav 160 Q1 2026 30 400 000 tootmise võrku MW võrgumahtu integreerimise saadaval võimekus KLIM 8.3 Biogaasi ja I M 132 Uuringu Q4 2024 0 biometaani läbiviimine, mis tootmise ja tuvastab kasutamise vajalikud suurendamine regulatiivsed, organisatsioonilis ed ja rahalised sekkumised KLIM 8.3 Biogaasi ja M 133 Biogaasi ja Q2 2025 200 000 biometaani biometaani tootmise ja tootmise ja kasutamise kasutuselevõtu suurendamine tegevuskava koostamine REM 8.3 Biogaasi ja I T 134 Täiendava Q2 2026 16 000 000 biometaani biometaani tootmise ja tootmisvõimsuse kasutamise loomine suurendamine Riigikantselei [email protected] */ Meie 25.05.2026 nr 1.1-10.1/2254-1 „Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamaksete korra kinnitamine Austatud härra riigisekretär Esitame Vabariigi Valitsuse istungile eelnõu „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamaksete korra kinnitamine“. Taastekava koostati esmakordselt 2021.a. sügisel, kui lepiti Euroopa Komisjoniga kokku reformid ja investeeringud koos siduvate eesmärkide ja ajakavaga RRF toetuse kasutamiseks. 2023.a. alguses tehti seoses rahastu mahu vähendamise ja REPowerEU toetuse lisandumisega kavale muudatuste lisa, mis kiideti Euroopa Liidu Nõukogu poolt heaks mais 2023.a. 2025.a. sügisel ning 2026.a. algul muudeti Taastekava seoses muutunud olude – sõja, inflatsiooni ja majanduslanguse – mõjuga ning Euroopa Komisjoni 2025. a juunis antud lihtsustamisjuhiste rakendamiseks. Kuna Taastekava elluviimise ja tulemuste Euroopa Komisjonile raporteerimise lõpptähtaeg on august 2026.a., siis on tarvilik Taastekava veelkord täiendavalt korrigeerida, et kõik kavas sisalduvad siduvad kokkulepped ja tulemused oleks võimalik tähtaegselt saavutada ning tagada sellega Eestile kogu RRF toetuse väljamaksmine Euroopa Komisjoni poolt 2026.a. lõpuks. RRF on tulemuspõhine rahastamisinstrument, mille kohaselt teeb Euroopa Komisjon väljamakseid liikmesriikidele üksnes Taastekavas kokkulepitud investeeringute/reformide tulemuste (vahe-eesmärgid ja sihid) saavutamise alusel. Euroopa Komisjonilt laekub toetus rahastamiskokkuleppes määratud kindlasummaliste maksetena, mis ei ole otseses vastavuses riigisiseselt investeeringute/reformide rakendamisel tekkinud tegelike kuludega. Kuna Eestile on laekumas Euroopa Komisjonilt 2026.a. lõpus veel viimased kaks makset ning RRF-i rakendamise lõpptähtaeg on peagi saabumas, peame perioodi lõppedes tagama riigisiseselt tulude ja kulude vastavuse riigisiseses väljamaksete korras. Lugupidamisega (allkirjastatud digitaalselt) Jürgen Ligi rahandusminister Suur-Ameerika 1 / 10122 Tallinn / 611 3558 / [email protected] / www.rahandusministeerium.ee registrikood 70000272 Lisad: 1. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamakse korra kinnitamine“ eelnõu 2. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamakse korra kinnitamine“ eelnõu seletuskiri 3. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamakse korra kinnitamine“ eelnõu lisa „Addendum to the Recovery and Resilience Plan“ 4. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamakse korra kinnitamine“ eelnõu lisa „Nõukogu rakendusotsuse (CID) lisa“ Rita Tubarik 5464 0212 [email protected] 2 EELNÕU 2026 VABARIIGI VALITSUS ISTUNGI PROTOKOLL Tallinn, Stenbocki maja 2026 nr Päevakorrapunkt nr „Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamaksete korra kinnitamine 1. Kinnitada „Taaste- ja vastupidavuskava lisa“. 2. Kinnitada Taaste- ja vastupidavuskava alusel laekuva toetuse riigisisene väljamaksete kord. 3. Rahandusministeeriumil avaldada punktis 1 nimetatud dokument taaste- ja vastupidavusrahastu veebilehel pärast seda, kui Euroopa Liidu Nõukogu on muudatused heaks kiitnud. 4. Rahandusministeeriumil esitada Taastekava lisa Euroopa Komisjonile heakskiitmiseks. Kristen Michal Peaminister Keit Kasemets Riigisekretär Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamaksete korra kinnitamine“ eelnõu seletuskiri 1. Sissejuhatus Taaste- ja vastupidavusrahastu (edaspidi RRF) rakendamiseks on „Taaste- ja vastupidavuskavas“ (edaspidi taastekava) kokku lepitud reformid ja investeeringud ning tulemused (eesmärgid ja sihid) koos tähtaegadega. Eelnõuga kiidetakse Euroopa Parlamendi ja nõukogu määruse (EL) nr 2021/241, millega luuakse taaste- ja vastupidavusrahastu (ELT L 57, 18.02.2021, lk 17-75), artikli 21 lõike 1 ja Vabariigi Valitsuse 29. novembri 2021 määruse nr 108 „Taaste- ja vastupidavuskava elluviimise korraldus ja toetuse andmise üldtingimused“ § 4 lõike 1 alusel heaks „Taaste- ja vastupidavuskava lisa“ muudatus. Taastekava koostati esmakordselt 2021.a. sügisel, kui lepiti Euroopa Komisjoniga kokku reformid ja investeeringud koos siduvate eesmärkide ja ajakavaga RRF toetuse kasutamiseks. 2023.a. alguses tehti seoses rahastu mahu vähendamise ja REPowerEU toetuse lisandumisega kavale muudatuste lisa, mis kiideti Euroopa Liidu Nõukogu poolt heaks mais 2023.a. 2025.a. sügisel ning 2026.a. algul muudeti Taastekava seoses muutunud olude – sõja, inflatsiooni ja majanduslanguse – mõjuga ning Euroopa Komisjoni 2025. a juunis antud lihtsustamisjuhiste rakendamiseks. Kuna Taastekava elluviimise ja tulemuste Euroopa Komisjonile raporteerimise lõpptähtaeg on august 2026.a., siis on tarvilik Taastekava veelkord täiendavalt korrigeerida, et kõik kavas sisalduvad siduvad kokkulepped ja tulemused oleks võimalik tähtaegselt saavutada ning tagada sellega Eestile kogu RRF toetuse väljamaksmine Euroopa Komisjoni poolt 2026.a. lõpuks. Kavandatav muudatus on mitteametlikult läbi räägitud ka Euroopa Komisjoniga. RRF on tulemuspõhine rahastamisinstrument, mille kohaselt teeb Euroopa Komisjon väljamakseid liikmesriikidele üksnes Taastekavas kokkulepitud investeeringute/reformide tulemuste (vahe-eesmärgid ja sihid) saavutamise alusel. Euroopa Komisjonilt laekub toetus rahastamiskokkuleppes määratud kindlasummaliste maksetena, mis ei ole otseses vastavuses riigisiseselt investeeringute/reformide rakendamisel tekkinud tegelike kuludega. Kuna Eestile on laekumas Euroopa Komisjonilt veel viimased kaks makset ning RRF-i rakendamise lõpptähtaeg on peagi saabumas, peame perioodi lõppedes tagama riigisiseselt tulude ja kulude vastavuse riigisiseses väljamaksete korras. Seletuskirja koostas Rahandusministeeriumi riigieelarve osakonna nõunik Rita Tubarik ([email protected], telefon 54640212); eelnõu juriidilise ekspertiisi tegi Rahandusministeeriumi personali- ja õigusosakonna õigusloome valdkonna juht Virge Aasa ([email protected], telefon 58851493). 2. Eelnõu eesmärk Eelnõuga kinnitatakse Euroopa Parlamendi ja nõukogu määruse (EL) nr 2021/241, millega luuakse taaste- ja vastupidavusrahastu (ELT L 57, 18.02.2021, lk 17-75), artikli 21 lõike 1 ja Vabariigi Valitsuse 29. novembri 2021 määruse nr 108 „Taaste- ja vastupidavuskava elluviimise korraldus ja toetuse andmise üldtingimused“ § 4 lõike 1 alusel „Taaste- ja vastupidavuskava lisa“ muudatus. Eelnõuga kinnitatakse Taastekava alusel laekuva toetuse riigisisese väljamaksete korra muudatus. 3. Eelnõu sisu 3.1. Eelnõu otsusepunktiga 1 kinnitab Vabariigi Valitsus taaste- ja vastupidavuskava lisa. Taastekava muudatused Seoses RRF-i rakendamise lõpptähtaja peatse saabumisega 2026.a. augustis võimaldab Euroopa Komisjon liikmesriikidel Taastekavasid veel viimast korda muuta kuni 31.05.2026, et tagada kava edukas ja tähtaegne rakendamine ning kindlustada 2026.a. lõpuks rahastu väljamaksed täismahus. Eelmise Eesti Taastekava muudatusega 2026.a algul tehti vajalikud korrektuurid ära, kuid pärast vastavat kava muudatust ilmnes Haridus- ja Teadusministeeriumi investeeringutes asjaolusid, mis vajaksid kava muudatuse kaudu fikseerimist, et kindlustada Eestile kõik RRF-i väljamaksed 2026.a. lõpuks. Haridus- ja Teadusministeeriumi vastutusalas oleva reformi Oskuste reform ettevõtete digipöördeks rakendamise raames on ilmnenud, et koolitustegevustes osalemise sihttaset ei ole praegustes tingimustes võimalik saavutada. Võrreldes ajaga, mil meede algselt kavandati, on nii majanduskeskkonnas kui ka IKT-sektoris toimunud märkimisväärsed muutused. Majandusraskused, IKT-sektori nõudluse stabiliseerumine, koolitusturu küllastumine ning ettevõtete kasvav eelistus ettevõttesiseste AI-koolituste suhtes on vähendanud nii tööandjate kui ka osalejate huvi pikkade ümberõppeprogrammide vastu. Seetõttu tehakse ettepanek vähendada osalejate sihttaset 2000-lt 1818-le, säilitades samal ajal koolituste kvaliteedi ja sisulise mõju. Ühtlasi on vajalik muuta Haridus- ja Teadusministeeriumi koolitustegevusega seotud tulemuste kirjeldust, selleks, et tulemuste saavutamise tõendamine oleks Eesti süsteemide vaates korrektne. Lisaks välja toodud muudatusele muudetakse Euroopa Komisjoni juhisele tuginedes osade Nõukogu rakendusotsuses (CID) välja toodud tulemuste kirjeldusi, eesmärgiga lihtsustada Taastekava rakendamist ja tulemuste tõendamist lihtsustada ning teha rahastu sulgemine 2026.a. sujuvamaks. Võttes arvesse Euroopa Komisjoni lihtsustamise juhiseid, muudetakse järgmiste Taastekava investeeringute/reformide sh tulemuste kirjeldusi ja/või esitatavat tõendusmaterjali: T13; T20; T27; T31; M98 Uuendustega CID-projekt, mis esitatakse pärast Taastekava muudatuste ametlikku heakskiitmist Euroopa Komisjoni poolt Euroopa Liidu Nõukogule kinnitamiseks, on esitatud käesoleva eelnõu lisas. 3.2. Eelnõu otsusepunktiga 2 kinnitab Vabariigi Valitsus Taaste- ja vastupidavuskava alusel laekuva toetuse riigisisene väljamaksete korra. Seoses RRF-i rakendamisperioodi lõppemise ja viimaste arveldustega, on vajalik muuta ka Euroopa Komisjonilt laekuva toetuse riigisisest väljamaksete korda ministeeriumide vahel. Muudatus on vajalik, et tagada Euroopa Komisjonilt laekuva toetuse korrektne ja läbipaistev jaotamine vastutavate ministeeriumide vahel ning vältida olukorda, kus jaotus ei vasta tehtud kuludele ega võimalda perioodi lõpus tulude ja kulude tasakaalustamist. Arvestades, et kõik RRF-i raames kokkulepitud tulemused peavad olema saavutatud hiljemalt 2026. aasta augusti lõpuks ning pärast seda tähtaega Euroopa Komisjon tulemusi enam arvesse ei võta, on oluline, et riigisisene väljamaksete kord arvestaks rakendamise lõppfaasi eripärasid, sealhulgas kulude abikõlblikkuse perioodi lõppemist ning väljamaksete ajastust. Vabariigi Valitsuse 29. novembri 2021 määruse nr 108 „Taaste- ja vastupidavuskava elluviimise korraldus ja toetuse andmise üldtingimused“ § 2 lõike 13 järgi tuleb abikõlblikkuse perioodil tekkinud kulud tasuda hiljemalt 30. oktoobriks 2026. a. Pärast nimetatud tähtaega tasutud kulud toetusest hüvitamisele ei kuulu. Kui ministeeriumid on abikõlblikud kulud 30.oktoobriks 2026.a. ära teinud ning Euroopa Komisjonilt laekuvad Eestile viimased toetuse väljamaksed, siis tehakse ministeeriumidele viimased maksed vastavalt reformi/investeeringu eelarve piires 31.08.2026 seisuga tekkinud seni laekumata nõuete mahule. 3.3. Eelnõu otsusepunkti 3 kohaselt esitab Rahandusministeerium taastekava lisa Euroopa Komisjonile heakskiitmiseks. Tulenevalt Euroopa Parlamendi ja nõukogu määrusest (EL) 2021/241, millega luuakse taaste- ja vastupidavusrahastu (ELT L 57, 18.2.2021, lk 17–75) tuleb liikmesriigil Taastekava muutmiseks esitada pärast mitteametlikke läbirääkimisi ametlik ettepanek Euroopa Komisjonile, kellel on Taastekava muudatuse heakskiitmiseks aega kaks kuud, misjärel on Euroopa Liidu Nõukogul aega neli nädalat Taastekava muudatuse alusel rakendusotsuse tegemiseks. Muudatused jõustuvad pärast Euroopa Liidu Nõukogu rakendusotsuse tegemist. Kuna Taastekava ellu viimiseks on jäänud vaid pool aastat, siis lubatakse koos Taastekava muudatuse heakskiitmisega Vabariigi Valitsuse poolt ministeeriumitel jätkata kõikide tegevustega muudetud Taastekava lisa alusel ära ootamata nõukogu rakendusotsust, et saavutada kõik uuendatud kavas fikseeritud tulemused hiljemalt augusti lõpuks 2026. aastal. 3.4. Eelnõu otsusepunkti 4 kohaselt esitab Rahandusministeerium Taastekava lisa Riigi Tugiteenuste Keskusele Taaste- ja vastupidavusrahastu veebilehel avaldamiseks peale selle kinnitamist Euroopa Liidu Nõukogu poolt. Taaste- ja vastupidavusrahastu ning Taastekava materjalid, aga ka rakendamist puudutav jooksev ülevaade on avaldatud Riigi Tugiteenuste Keskuse veebilehel aadressil https://rtk.ee/toetused-taotlemine/taaste-ja-vastupidavusrahastu-rrf, kuhu lisatakse ka käesoleva kava muudatusega seotud materjalid. 4. Eelnõu vastavus Euroopa Liidu ja Eesti õigusele Eelnõu on valmistatud ette kooskõlas Euroopa Parlamendi ja nõukogu määrusega (EL) 2021/241, millega luuakse taaste- ja vastupidavusrahastu (ELT L 57, 18.2.2021, lk 17–75), ning Euroopa Parlamendi ja nõukogu määrusega (EL) 2023/435, millega muudetakse määrust (EL) 2021/241 seoses REPowerEU peatüki lisamisega taaste- ja vastupidavuskavadesse ning millega muudetakse määruseid (EL) nr 1303/2013, (EL) 2021/1060, (EL) 2021/1755 ja direktiivi 2003/87/EÜ, samuti kooskõlas Vabariigi Valitsuse 29. novembri 2021. a määrusega nr 108 „Taaste- ja vastupidavuskava elluviimise korraldus ja toetuse andmise üldtingimused“. 5. Eelnõu mõju Taaste- ja vastupidavusrahastu kogumaht Eestile on 953 184 800 eurot ning sellest 627 mln on tänaseks 65 saavutatud ja raporteeritud tulemuse eest laekunud. 2026.aasta kevadeks jääb saavutada veel 48 tulemust ning nendega seotud väljamaksed teeb Euroopa Komisjon hiljemalt 2026.a. lõpuks. Eelnõuga heaks kiidetavas Taastekava lisas ja EL Nõukogu rakendusotsuse projektis välja toodud muudatuste eesmärk on tagada 2026. aasta lõpuks Eestile RRF-i väljamaksed täismahus. 6. Eelnõu jõustumine Vabariigi Valitsuse kinnitamise järel esitab Rahandusministeerium Taastekava Euroopa Komisjonile heakskiitmiseks. 7. Eelnõu kooskõlastamine Taastekava lisa on sõnastatud koostöös Haridus- ja Teadusministeeriumiga ning Euroopa Komisjoniga mitteametlikult läbi räägitud. Council of the European Union Brussels, 2026 (OR. en) Interinstitutional File: 2026/0056 (NLE) ADD 1 ECOFIN UEM FIN ECB NOTE EIB From: General Secretariat of the Council To: Delegations Subject: ANNEX to the COUNCIL IMPLEMENTING DECISION amending the Implementing Decision of 29 October 2021 on the approval of the assessment of the recovery and resilience plan for Estonia 6468/26 ADD 1 1 ECOFIN 1A EN ANNEX SECTION 1: REFORMS AND INVESTMENTS UNDER THE RECOVERY AND RESILIENCE PLAN 1. Description of Reforms and Investments A. COMPONENT 1: DIGITAL TRANSFORMATION OF ENTERPRISES The objective of this component of the Estonian recovery and resilience plan is to foster the digital transformation of Estonian companies and their competitiveness, in particular on export markets. It shall provide financial support to companies of all sectors, with a focus on SMEs and microenterprises, at different stages of their digital transformation, as well as specific contributions to the adoption and deployment of digital solutions in the construction and road freight transport sectors. Moreover, the component shall address the key issue of digital skills, through awareness- raising of SME managers and support to the upskilling and retraining of specialists in information and communication technologies (ICT). Actions aimed at supporting the identification of export opportunities and the promotion of Estonian companies abroad shall be carried out in synergy with the activities of Enterprise Estonia. The component supports addressing the Country Specific Recommendations on investment in the digital transition (Country Specific Recommendation 3 in 2020) and on skills shortages (Country Specific Recommendation 2 in 2019). It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the‘Dono significant harm’ Technical Guidance (2021/C58/01). A.1. Description of the reforms and investments for non-repayable financial support 1.1. Investment: Digital transformation in enterprises The objective of the measure is to foster the digital transformation of businesses with a particular focus on SMEs and micro-enterprises. The measure consists in providing financial support to companies including SMEs and micro- enterprises located in Estonia for their digital transformation. 1.2. Investment: Development of e-construction The objective of the measure is to contribute to the acceleration of the digital transformation of the construction sector. The measure consists in the publication online describing the construction data classification system and online database of average emission factors of materials; and the support to projects linked to the use of digital construction tools by private and public entities. 6468/26 ADD 1 2 ANNEX ECOFIN 1A EN 1.3. Investment: Development of digital waybills services The objective of the measure is to support the digitalisation of the exchange of information in road freight transport. The measure consists in supporting service providers in the establishment of eFTI platforms, and enterprises to be connected to eFTI platforms. 1.4. Reform: Skills reform for the digital transformation of businesses The objective of the reform is to increase the digital capacity of businesses and to ensure the availability of ICT professionals. The measure consists of the support for ICT skills for businesses. 1.5. Reform: Supporting the competitiveness of enterprises in foreign markets The objective of the measure is to increase the export capacity and competitiveness of Estonian companies, including notably those of the ICT sector. The measure consists of the development of export strategies aimed at specific countries or regions; the opening of business centres located in key export markets and the organisation of missions with global impact groups. 6468/26 ADD 1 3 ANNEX ECOFIN 1A EN A.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 1 1.1 Digital Milestone Call for proposals Publication of the Q2 2022 A call for proposals to support the digital transformation in with award criteria notice of the call transformation of businesses, together with the enterprises and award for proposals award criteria, shall be published by the conditions Ministry of Economic Affairs and Communications. The evaluation criteria and the conditions for granting support shall be defined on the basis of an analysis of the needs of Estonian companies and the expected impact of the measure. Eligibility criteria shall also ensure that the selected projects comply with the ‘Do no significant harm’ Technical Guidance (2021/C58/01) through the use of an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation. 2 1.1 Digital Target Award of grants Number of 0 110 Q4 2023 Number of enterprises to which grants shall be transformation in enterprises awarded by the Ministry of Economic Affairs enterprises being and Communications to support their digital awarded a transformation in accordance with the call for grant proposals. 3 1.1 Digital Target Award of grants Number of 110 230 Q4 2025 Number of grant award decisions done by EIS, transformation in grant award Estonian Business and Innovation Agency, enterprises decisions following the call for proposals under milestone 1. 6468/26 ADD 1 4 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 4 1.2 Development Milestone Introduction of a Publication of Q4 2024 Published guidelines shall describe the of e-construction construction data guidelines and construction data classification system. A classification system online database database of average emission factors of materials shall be available online. Building permits and design specifications, and building registry (logbook) shall be accessible from the e-construction platform. 6 1.2 Development Target Projects for digital Number of 0 102 Q4 2025 At least 102 confirmations by the authorities of e-construction construction tools confirmations accepting the final project implementation from report for projects on digital construction tools authorities of private and public entities, selected through accepting the an open call for proposals finalreports 7 1.3 Development Target eFTI (electronic Number of 0 5 Q2 2023 Number of projects developing an eFTI of digital waybills Freight Transport projects platform which have received a positive grant services Information) launched decision. platforms development 9 1.3 Development Target Confirmations from Number of 0 205 Q1 2026 At least 205 confirmations by the authorities of digital waybills authorities accepting confirmations accepting the final project implementation services the final reports from reports for projects on digital waybills. authorities accepting the finalreports 6468/26 ADD 1 5 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 11 1.4 Skills reform Milestone Entry into force of Entry into force Q2 2022 The secondary legislation necessary for the for the digital secondary legislation of secondary application and allocation of support shall transformation of setting out the terms legislation enter into force. The conditions for support businesses of support for the shall be established through a ministerial development of decree, which shall be coordinated with the digital skills Ministry of Finance and the State Shared Service Centre. The ministerial decree shall consist of the following elements: - objective of the measure, - description of supported activities, - beneficiaries and target groups, - conditions for implementation, eligible costs and used simplifications, - conditions for payments, - conditions for reporting and monitoring. 12 1.4 Skills reform Target Enrolment in Number of 0 500 Q4 2023 Number of people enrolled in training for the digital training activities participants activities supported under this measure, transformation of consisting of awareness-raising for SME businesses managers, and upskilling and retraining for ICT specialists. A minimum of 35% of participants enrolled in these training activities shall be women. 13 1.4 Skills reform Target The participation Number of 0 1818 Q2 2026 Number of confirmed participations in training for the digital in training confirmed activities supported under this measure. transformation of activities participatio businesses ns 6468/26 ADD 1 6 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 14 1.4 Skills reform Target Number of Number of 0 10 Q4 2024 Five curriculums of training shall be registered for the digital curriculums of curriculums in Estonia’s Adult training information system transformation of training registered and registered (JUHAN). businesses qualification and Five new or updated qualification standards standards for ICT qualification for ICT specialists shall be registered in the specialists registered standards national register of qualification standards. registered 16 1.5 Supporting the Milestone Preparation of the Completion of Q2 2022 The preparatory tasks needed to draw up competitiveness of development of preparatory tasks export strategies shall be completed. enterprises in strategies These tasks include: foreign markets - an analysis of which external markets are important to develop strategies, - an analysis of the interests of businesses, - a mapping of the needs of exporting enterprises to increase their competitiveness on export markets, the ranking of the needs. 17 1.5 Supporting the Milestone Procurement of Signature of Q2 2024 Tenders for drawing up strategies and product competitiveness of studies contracts packages with a view to obtaining detailed enterprises in market information on foreign markets shall be foreign markets carried out by the Ministry of Foreign Affairs. The corresponding contracts shall be signed. 18 1.5 Supporting the Target Strategies published Number of 0 27 Q2 2026 At least 13 national and/or regional export competitiveness of and missions carried strategies strategies shall be published and at least 14 enterprises in out published and missions carried out. foreign markets missions carried out 6468/26 ADD 1 7 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 19 1.5 Supporting the Milestone Preparatory analysis Delivery of a Q2 2022 A preparatory analysis allowing the definition competitiveness of to define the content preparatory of the content and the locations of the business enterprises in and the locations of analysis centres shall be prepared by the Ministry of foreign markets business centres Foreign Affairs. The analysis shall reveal where to set up business centres to increase demand for Estonian-made products and services in export markets. 20 1.5 Supporting the Target Number of business Number of 0 7 Q2 2026 Number of business centres opened in foreign competitiveness of centres opened business countries that are important export markets. enterprises in centres foreign markets 21 1.5 Supporting the Milestone Setting-up of impact Decisions on the Q2 2022 Based on an analysis, the Ministry of Foreign competitiveness of groups and selection composition of the Affairs shall select global digital mission enterprises in of destinations for impact groups and destinations and impact groups to increase the foreign markets global digital the destinations of added value of Estonian digital services missions the global digital exports, increase the export capacity of missions Estonian companies, among which ICT companies in particular, and attract additional foreign investments for innovation. 6468/26 ADD 1 8 ANNEX ECOFIN 1A EN B. COMPONENT 2: ACCELERATING THE GREEN TRANSITION IN ENTERPRISES B.1. Description of the reforms and investments for non-repayable financial support The objective of the component of the Estonian recovery and resilience plan is to speed up the green transition in the business sector in Estonia and to seize the business opportunities it represents. The component consists of two reforms and six investments and aims to support the development of green technologies, increase green R&D and innovation capabilities and resource efficiency, introduce new business models and improve skills and expertise in fields related to the green transition. The measures under this component aim for a comprehensive approach to the green transition addressing key market failures and facilitating the technological and behavioural breakthrough to increase the competitiveness of the business sector. The measures also support further development of the capital market and business environment. The component supports addressing the Country Specific Recommendations on supporting the innovation capacity of small and medium-sized enterprises and focussing investment on the green transition, ensuring sufficient access to finance (Country Specific Recommendation 3 in 2020), on skills shortages (Country Specific Recommendation 2 in 2019) and reducing reliance on fossil fuels (Country Specific Recommendation 4 in 2022). It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the‘Dono significant harm’ Technical Guidance (2021/C58/01). 2.1. Reform: Green transition of enterprises The objective of the reform is to improve the green transition in the business sector, which is expected to have economic, environmental and social benefits by making existing businesses more efficient and environmentally friendly (resource efficiency, new green transition certificates and market authorisations for products) and by supporting the emergence of new green technology companies (development and deployment of green technologies, new opportunities for the valorisation of bio-resources). The reform shall consist of the set-up of a broad-based Green Transition Task Force to foster cooperation between the green technology stakeholders and the adoption of legislation necessary for the implementation of the five complementary investments: 1. Green skills to support the green transition of companies; 2. Green technology development programmes; 3 Modernisation of the business models in manufacturing companies; 4. Resource efficient green technologies; and 5. Green Fund. The reform is interlinked with Component 1 as digitalisation and automation are contributing to the development of green technologies and green transition in the business sector. The implementation of the reform shall be completed by 31 December 2022. 2.2. Investment: Green skills to support the green transition of enterprises The objective of the investment is to ensure the availability of skilled adults for the green transition in enterprises. 6468/26 ADD 1 9 ANNEX ECOFIN 1A EN The investment consists of the introduction of green skills upskilling and retraining programmes for adults. 2.3. Investment: Green technologies development programme The objective of the investment is to contribute to the green transition of companies. The investment consists of support to start-ups and development clusters with a focus on integrated green technology solutions through various services. 2.4. Investment: Modernisation of the business models in manufacturing companies The objective of the investment is to support the change of business models in manufacturing to facilitate the compliance of Estonian products with environmental and climate objectives. The measure consists of support to projects modernising the business models of manufacturing companies related to climate and environmental objectives. 2.5. Investment: Resource-efficient green technologies The objective of the investment is to support the resource efficiency of companies, including energy efficiency, with a particular focus on the valorisation of underutilised bio-resources. The measure consists of support to projects for resource-efficient green technologies; and for the valorisation of bio-resources. 2.6. Investment: Green Fund The objective of the investment is to provide capital for the development of new green technologies in strategic areas such as energy, agriculture, food industry, transport and logistics, materials and chemical industries. The Green Fund shall provide funding for companies and sectors whose products, services or processes are characterised by research-intensive green technologies and whose activities contribute to solving environmental problems, developing new products, services or technologies that reduce or capture greenhouse gas emissions or are driven by eco-design requirements. The measure aims to be implemented as a financial instrument. The Green Fund shall consist of a public investment in a Facility, the SmartCap Green Fund, in order to incentivise private investment and improve access to finance in Republic of Estonia. On the basis of the RRF investment, the Facility aims at initially providing at least EUR 90 million of financing. The Facility shall be managed by AS SmartCap as the implementing partner. The Facility shall include the following product lines: • direct equity investments in early to expansion stage (including late growth and maturity stage and infrastructure) innovative and/or research-intensive green technology companies by acquiring equity instruments, in particular new ordinary or preferred shares of a private or public limited company or other equivalent rights that represent a holding issued by the target undertaking; • investments in investment funds that make equity investments that focus on: a) initial or seed phase investments to ensure market activation and the generation of transaction flows based on new technologies through business accelerators and intensive programs for the development of innovative and/or research-intensive companies; b) early-stage investments 6468/26 ADD 1 10 ANNEX ECOFIN 1A EN to finance the market introduction of new technologies; and/or early growth or expansion stage (including late growth and maturity stage and infrastructure) investments to finance the rapid growth and expansion of companies on the market, including international expansion and export of products, services or technology. In order to implement the investment into the Facility, the Estonian Ministry of Economic Affairs and Communication and AS SmartCap shall sign an Implementing Agreement that shall include the following content: 1. Description of the decision-making process of the Facility: The final investment decision of the Facility shall be taken by an investment committee or other relevant equivalent governing body and approved by a majority of votes from members who are independent from the government. 2. Key requirements of the associated investment policy shall be specified: a. The description of the financial product(s) and eligible final beneficiaries. b. The requirement that all investments supported are economically viable. c. The requirement to comply with t h e ‘ D o no significant harm’ Technical Guidance (2021/C58/01). The legal agreement signed between Estonia and SmartCap and the subsequent investment policy of the Green Fund shall: i. require the application of the Commission’s technical guidance on sustainability proofing for the InvestEU Fund; and ii. require companies that derived more than 50% of their revenues during the preceding financial year from the following activities and/or assets to adopt and publish green transition plans: (i) activities and assets related to fossil fuels, including downstream use1; (ii) activities and assets under the EU Emission Trading System (ETS) achieving projected greenhouse gas emissions that are not lower than the relevant benchmarks2; (iii) activities and assets related to waste landfills, incinerators3 and mechanical biological treatment plants4; and (iv) activities and assets where the long-term disposal of waste may cause harm to the environment; and iii. require the verification of legal compliance with the relevant EU and national environmental legislation of the beneficiary by SmartCap for all transactions, including those exempted from sustainability proofing. 1 Except projects under this measure in power and/or heat generation, as well as related transmission and distribution infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the‘Dono significant harm’ Technical Guidance (2021/C58/01). 2 Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the relevant benchmarks an explanation of the reasons why this is not possible should be provided. Benchmarks established for free allocation for activities falling within the scope of the Emissions Trading System, as set out in the Commission Implementing Regulation (EU) 2021/447. 3 This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non- recyclable hazardous waste, and to existing plants, where the actions under this measure are for the purpose of increasing energy efficiency, capturing exhaust gases for storage or use or recovering materials from incineration ashes, provided such actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for which evidence is provided at plant level. 4 This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants, where the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling operations of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the lifetime of the plants; for which evidence is provided at plant level. 6468/26 ADD 1 11 ANNEX ECOFIN 1A EN 3. Monitoring, audit, and control requirements, including: 1. The description of the SmartCap monitoring system to report on the investment mobilized. 2. The description of the SmartCap procedures that will ensure the prevention, detection and correction of fraud, corruption, and conflicts of interests. 3. The obligation to verify the eligibility of every operation in accordance with the requirements laid out in the Implementing Agreement before committing to finance an operation. 4. The obligation of carrying out risk-based ex-post audits in accordance with an audit plan of the AS SmartCap. These audits shall verify i) that the control systems are effective, including the detection of fraud, corruption, and conflict of interests; ii) compliance with the DNSH principle, the State Aid rules, the climate target requirements; The audits shall also verify the legality of the transactions and that the conditions of the applicable Implementing Agreement and Funding Agreements are being respected 4. Requirements for selecting financial intermediaries: AS SmartCap shall select financial intermediaries in an open, transparent, and non-discriminatory manner. Controls for the absence of conflict of interests on financial intermediaries shall take place and be conducted ex-ante for all financial actors involved. 5. Requirement to sign Funding Agreements: AS SmartCap shall sign Funding Agreements with the financial intermediaries in line with key requirements that shall be provided as an annex of the Implementing Agreement. The key requirements of the Funding Agreement shall include all the requirements under which the Facility operates, including: 1. The obligation of the financial intermediary to take its decisions in compliance mutatis mutandis with the decision making and investment policy requirements specified above, including related to respect of the DNSH principle. 2. The description of the monitoring and audit and control framework that the financial intermediary shall put in place, which mutatis mutandis shall be subject to all the monitoring, audit and control requirements specified above. 2.7. Investment: Creating opportunities for the uptake of renewables-based green hydrogen technologies The objective of the investment is to support the 1st phase of the launch and piloting of hydrogen integrated value chains from energy production and supply solutions to final consumption in different application areas. The measure consists of support for projects in renewable-based green hydrogen technologies. 6468/26 ADD 1 12 ANNEX ECOFIN 1A EN 2.8. Investment: Supply Security Investment Support The objective of the investment is to support the transition of companies from fossil energy sources to alternative energy supply sources. The measure consists of support to investment projects for the transition of companies from fossil energy sources to alternative energy supply. 6468/26 ADD 1 13 ANNEX ECOFIN 1A EN B.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support Qualitative Quantitative Indicative timeline Related Measure Sequential Milestone Unit of indicators for completion Description of each milestone and (Reform or Name indicators (for Number /Target measure (for targets) target Investment) milestones) Baseli Goal Quarter Year 23 2.1Green Milestone Creation ofa Green Set up of a task ne Q4 2021 The Ministry of the Environment shall transition of Transition Task Force force and reform the existing Working Group on enterprises to implement and working groups Green Technology (set up in 2020) into monitor the green the RRP’s Green Transition Task Force transition to coordinate the measures on the green transition of companies and improve cooperation and exchange of information among the public sector, stakeholders and interest groups. The necessary working groups shall be set up for specific measures. 24 2.1Green Milestone Adoption of the Circular Q4 2022 The Green Transition Task Force shall transition of Circular Economy Economy Action review the existing Circular Economy enterprises Action Plan by the Plan adopted activities and different action plans into Green Transition Task a single Circular Economy Action Plan Force that will lead the Estonian transition to Circular Economy. 25 2.2 Green skills to Milestone Entry into force of Entry into force Q2 2022 The secondary legislation necessary for support the green secondary legislation of secondary the application and allocation of transition of setting out the terms of legislation support shall enter into force. It shall enterprises support for the contain provisions ensuring that any development of green action supported under this measure is skills focused on areas contributing to the reduction of greenhouse gas emissions or the adaptation to climate change. 27 2.2 Green skills to Target Confirmed participati Number of 0 2 830 Q2 2026 Number of confirmed participations in support the green ons confirmed training activities supported under this transition of participations measure. enterprises 6468/26 ADD 1 14 ANNEX ECOFIN 1A EN Qualitative Quantitative Indicative timeline Related Measure Sequential Milestone Unit of indicators (for for completion Description of each milestone and (Reform or Name indicators (for Number /Target measure targets) target Investment) milestones) Baseline Goal Quarter Year 28 2.3 Green Milestone Establishment of a Recruitment of a Q4 2021 A project manager shall be recruited technologies working group to plan project manager and a broad-based group of development and set up the and set up of a stakeholders shall be set up to programme development working group coordinate investment planning and programme implementation. The role of the project manager shall be set out to gather information from market participants and design the necessary support measures and procurement. The working group shall be composed of parties involved in the development of entrepreneurship and shall undertake to meet at least three times a year to take stock of developments in investment- related activities and provide recommendations for further action. The working group shall draw up provisions related to the selection of actions to be supported under the development programme in such a way that it is ensured that each action directly contributes either to lowering greenhouse gas emissions or supporting adaptation to climate change. 6468/26 ADD 1 15 ANNEX ECOFIN 1A EN Qualitative Quantitative Indicative timeline Related Measure Sequential Milestone Unit of indicators (for for completion Description of each milestone and (Reform or Name indicators (for Number /Target measure targets) target Investment) milestones) Baseline Goal Quarter Year 29 2.3 Green Milestone Set up of the Green Contracts signed Q2 2024 The public procurement processes for at technologies Technologies for all least 5 development clusters shall be development Development development completed and the contracts shall be programme Programme clusters and awarded to the winning parties. support measures designed and Support measures shall be designed and opened their first rounds shall be opened to at least 10 start-ups. The selection processes shall ensure that each supported action directly contributes either to lowering greenhouse gas emissions or supporting adaptation to climate change. 31 2.3 Green Target Number of clusters Number of 0 15 Q2 2026 Confirmations by the authorities technologies and startups supported clusters and accepting the final report for at least 5 development through the Green startups clusters and at least 10 start-ups from programme Technology supported the development programme. Development Programme 6468/26 ADD 1 16 ANNEX ECOFIN 1A EN Qualitative Quantitative Indicative timeline Related Measure Sequential Milestone Unit of indicators (for for completion Description of each milestone and (Reform or Name indicators (for Number /Target measure targets) target Investment) milestones) Baseline Goal Quarter Year 32 2.4 Modernisation Milestone Entry into force of the Entry into force Q2 2022 The conditions for granting support of the business ministerial decree of the ministerial shall be enacted by a decree of the models in setting out the terms decree responsible minister. The requirements manufacturing and conditions of grant set shall include eligibility criteria to companies eligibility ensure that the selected projects comply with the ‘Do no significant harm’Technical Guidance (2021/C58/01) by means of an exclusion list and compliance with relevant EU and national environmental legislation. The selection/eligibility criteria shall specify that the supported activities and/or enterprises contribute to a climate-neutral economy, resilience and climate change adaptation including circular economy objectives such as in- house implementation of circular economy principles, transfer of transport and storage of companies to new foundations. 33 2.4 Modernisation Target Confirmations by Number of 0 70 Q2 2026 At least 70 confirmations by the of the business authorities accepting confirmations authorities accepting the final project models in the final project by authorities implementation reports following the manufacturing reports accepting the call for proposals from milestone 32. companies final project reports 6468/26 ADD 1 17 ANNEX ECOFIN 1A EN Qualitative Quantitative Indicative timeline Related Measure Sequential Milestone Unit of indicators (for for completion Description of each milestone and (Reform or Name indicators (for Number /Target measure targets) target Investment) milestones) Baseline Goal Quarter Year 34 2.5 Resource Milestone Publication of call for Publication of the Q2 2022 Call for proposals to support resource- efficient green proposals for grants notice for calls efficient green technologies and the technologies for proposals for valorisation of bio-resources shall be grants published and open for applications, including eligibility criteria to ensure that the selected projects comply with the‘Dono significant harm’ Technical Guidance (2021/C58/01) by means of an exclusion list and compliance with relevant EU and national environmental legislation. The selection/eligibility criteria shall specify that the supported activities and/or enterprises contribute to a climate-neutral economy, resilience and climate change adaptation 35 2.5 Resource Target Number of projects Number of 0 36 Q4 2023 Award of grants to 36 projects selected efficient green awarded grants projects under the competitive call for technologies following the call for proposals, for green technologies for proposals industrial plants and for valorisation of bioresources, in compliance with the terms of reference. 36 2.5 Resource Target Confirmations from Number of 0 36 Q2 2026 At least 36 confirmations from the efficient green authorities accepting confirmations authorities accepting the final project technologies the final reports from implementation reports following the authorities call for proposals from milestone 34. accepting the finalreports 6468/26 ADD 1 18 ANNEX ECOFIN 1A EN Qualitative Quantitative Indicative timeline Related Measure Sequential Milestone Unit of indicators (for for completion Description of each milestone and (Reform or Name indicators (for Number /Target measure targets) target Investment) milestones) Baseline Goal Quarter Year 37 2.6 Green Fund Milestone Signature of Signature of Q4 2021 A contractual agreement shall be signed contractual agreement contractual between the Ministry of Economic between the Ministry agreement Affairs and Communications and of Economic Affairs SmartCap to manage the Green Fund, and Communications which shall contain: and SmartCap - Investment objectives to invest in enterprises and activities contributing to a climate-neutral economy and to improving resilience to climate change, including awareness- raising measures, - Eligibility criteria for compliance with the‘Dono significant harm’ Technical Guidance (2021/C58/01) of supported beneficiaries through the use of sustainability proofing, an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation. 6468/26 ADD 1 19 ANNEX ECOFIN 1A EN Qualitative Quantitative Indicative timeline Related Measure Sequential Milestone Unit of indicators (for for completion Description of each milestone and (Reform or Name indicators (for Number /Target measure targets) target Investment) milestones) Baseline Goal Quarter Year 38 2.6 Green Fund Milestone Adoption ofthe Investment Q4 2021 SmartCap shall adopt the investment investment policy policy document policy for the Green Fund, in line with document by adopted by the contractual agreement signed SmartCap SmartCap between the Ministry of Economic Affairs and Communications and SmartCap, including the investment objectives and the eligibility criteria to ensure compliance with the ‘Do no significant harm’ Technical Guidance (2021/C58/01) of supported beneficiaries under this measure through the use of sustainability proofing, the requirement of compliance with the relevant EU and national environmental legislation, and the requirement for beneficiaries that derived more than 50% of their revenues during the preceding financial year from activities or assets in the exclusion list to adopt and publish green transition plans. 39a 2.6 Green Fund Milestone Completion of the Transfer Q3 2025 Estonia shall transfer EUR 100 million investment by the to AS SmartCap for the Facility. The Ministry of Economic transfer shall be conditional upon the Affairs and inclusion of the requirements of the Communication measure description in the relevant contractual agreements. 40a 2.6 Green Fund Target Legal financing Percentage 0 100 Q2 2026 AS SmartCap shall have entered into agreements signed (%) legal financing agreements with equity with equity/venture investments /venture capital funds for an capital funds amount necessary to use 100% of the RRF investment into the Facility (taking into account operational expenditures). 6468/26 ADD 1 20 ANNEX ECOFIN 1A EN Qualitative Quantitative Indicative timeline Related Measure Sequential Milestone Unit of indicators (for for completion Description of each milestone and (Reform or Name indicators (for Number /Target measure targets) target Investment) milestones) Baseline Goal Quarter Year 41 2.7 Creating Milestone Entry into force of the Entry into force Q4 2022 Development of project selection opportunities for ministerial decree of the ministerial criteria, and entry into force of the the uptake of setting out the terms and decree ministerial decree on the conditions for renewables-based conditions for granting support for projects related to green hydrogen granting support integrated green hydrogen technologies technologies. The terms of reference for this support shall include eligibility criteria that ensure that the objectives of the selected projects comply with the‘Do no significant harm’ Technical Guidance (2021/C58/01) through the use of an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation. 43 2.7 Creating Target Grant agreements EUR 0 11 550 000 Q3 2025 Grant agreements signed for projects in opportunities for signed for projects in renewables-based green hydrogen the uptake of renewables-based technologies under this measure, renewables-based green hydrogen representing at least EUR 11 million green hydrogen technologies technologies 6468/26 ADD 1 21 ANNEX ECOFIN 1A EN Qualitative Quantitative Indicative timeline Related Measure Sequential Milestone Unit of indicators (for for completion Description of each milestone and (Reform or Name indicators (for Number /Target measure targets) target Investment) milestones) Baseline Goal Quarter Year 43a 2.8 Supply security Milestone Publication of the call Publication of the Q4 2023 A call for proposals to support investment support for proposals for notice for call for investment projects for the transition of grants proposals for companies from fossil energy sources grants to alternative energy supply sources shall be published and open for applications, including eligibility criteria to ensure that the selected projects comply with the ‘Do no significant harm’ Technical Guidance (2021/C58/01) by means of requirements related to supported eligible alternative energy sources and supported activities as set out in the measure description and compliance with relevant EU and national environmental legislation. 43c 2.8 Supply security Target Confirmations from Number of 0 70 Q2 2026 At least 70 confirmations from the investment support authorities accepting confirmations authorities accepting the final project the final reports from implementation reports following the authorities call for proposals from milestone 43a. accepting the finalreports 6468/26 ADD 1 22 ANNEX ECOFIN 1A EN C. COMPONENT 3: DIGITAL STATE Building on the successful deployment of digital technologies for the delivery of public services in Estonia over the last years, this component of the Estonian recovery and resilience plan aims at upgrading the digital government services further, in particular in terms of user-centricity and resilience (including in light of the growing cybersecurity threats). The component features measures allowing to take advantage of the opportunities offered by the latest technologies, especially artificial intelligence, but also significant redesigns of both front-end and back-end services. They shall benefit both citizens and businesses. Specific actions are foreseen in order to reinforce the country’s capacities to combat money laundering. The support to the deployment of very high capacity networks in rural areas is also expected to ensure wider access to online services and, more generally, contribute to the further digital transformation of the country. The component supports addressing the Country Specific Recommendations on investment in the digital transition (Country Specific Recommendation 3 in 2020) and on the anti-money laundering framework (Country Specific Recommendation 1 in 2019 and Country Specific Recommendation 4 in 2020). It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the‘Dono significant harm’ Technical Guidance (2021/C58/01). C.1. Description of the reforms and investments for non-repayable financial support 3.1. Reform: Creation and development of a centre of excellence for data governance and open data The objective of the measure is to foster a better management of the data collected and held by the Estonian public authorities. The measure consists of the creation of a data management team within Statistics Estonia; and publication of datasets. 3.2. Reform: Development of event services for individuals The objective of the measure is to support the efficiency of the delivery of public services and reduce the administrative burden for citizens. The measure consists of providing life event services for citizens online. 3.3. Reform: Development of event services and digital gateway for entrepreneurs The objectives of the measure are to support the efficiency and the quality of the delivery of public services and reduce the administrative burden for entrepreneurs. The measure consists of IT developments related to the business event services and/or gateway for entrepreneurs. 3.4. Investment: #Bürokratt programme (national virtual assistant) The objective of the measure is to support the user-friendliness and accessibility of public services 6468/26 ADD 1 23 ANNEX ECOFIN 1A EN in Estonia. The measure consists of developing a virtual assistant for the access to online public services which builds on pilot projects carried out in 2020 and 2021. 3.5. Investment: Reconfiguration of basic digital services and safe transition to cloud infrastructure The objective of the measure is to increase the resilience, the security and the reliability of the IT systems and services of the Estonian public authorities. The measure consists of: - the creation of a new public body in charge of the central management of the IT basic services and infrastructures of public institutions, - the procurement of private cloud infrastructure resources, - the migration of existing information systems to the private cloud, - the testing of information systems used by public authorities by the Estonian Information System Authority (RIA), - the extension of the private cloud to the data embassy. 3.6. Reform: The strategic analysis of money laundering and terrorist financing in Estonia The objective of the reform is to increase the capacity of the Financial Intelligence Unit to identify money laundering schemes and channels at an early stage. The measure consists of establishing a Centre for Strategic Analysis within the Financial Intelligence Unit. 3.7. Investment: Information system for strategic analysis of money laundering and terrorist financing The objective of the measure is to enable the exploitation of data available from different authorities and the identification of possible money laundering schemes and channels. The measure consists of developing an IT system. 3.8. Investment: Construction of very high capacity broadband networks The objective of the investment is to support the access to very high capacity broadband networks (VHCN), which offer a connection of at least 100 Mbps. The measure consists of providing financial support to projects for the construction of very high capacity broadband networks. 6468/26 ADD 1 24 ANNEX ECOFIN 1A EN C.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone completion Description of each milestone (Reform or Name indicators (for Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 44 3.1 Creation and Milestone Setting up a data Establishment of the Q4 2021 Creation of a Data Management development of a centre management team necessary Team in Statistics Estonia through the of excellence for data intheStatistical organisational recruitment of expert staff tasked governance and open Office, the structure for with coordinating the data data Ministry of coordinating data governance framework and Economic Affairs management supporting other public authorities. In and addition, posts shall be created at the Communications Ministry of Economic Affairs and and the State Communications and at the State Information Information System Agency System Authority to carry out development projects. By the end of 2021, at least five people shall be recruited across the three entities. 46 3.1 Creation and Target Publication of Number of 706 2 600 Q4 2025 The number of datasets published development of a centre datasets published shall be increased from 706 on 13 of excellence for data datasets August 2021 to 2 600. governance and open data 6468/26 ADD 1 25 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone completion Description of each milestone (Reform or Name indicators (for Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 47 3.2 Development of Target Launch of personal Number of 0 2 Q4 2022 Number of citizen life event eventservices for life event services services services and/or proactive services individuals and/or proactive which are launched online. services operational The corresponding IT solutions enabling the provision of the services shall be operational at least in the basic parts of a given service and are subject to a further development during the implementation of the measure. The selection of concerned services shall be based on the development plan for personal life event and proactive services. 48 3.2 Development of Target Online personal life Number of 2 10 Q4 2025 Number of citizen life event eventservices for event services services services online, providing at least individuals online the basic parts of a given service. 6468/26 ADD 1 26 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone completion Description of each milestone (Reform or Name indicators (for Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 49 3.3 Development of Target Deployment of IT Number of 0 1 Q4 2022 Number of IT development projects event services and developments projects that contributing to the implementation digital gateway for contributing to the have of the business event services and entrepreneurs implementation of successfully gateway that have successfully the business event deployed new deployed new developments online. services and developments These development projects shall be gateway online either directly related to the development of the digital gateway for entrepreneurs or to the development of business-event services, which additionally include the development of various related systems for interfacing with the digital gateway. As a result of each development project, at least a minimally functional IT solution shall be completed (i.e., the IT solution shall be operational at least in the basic parts for the end users (entrepreneurs) and shall be able to provide feedback for further development needs during the reform implementation period or afterwards). 50 3.3 Development of Target IT developments Number of IT 1 10 Q4 2025 Number of IT developments related event services and online developments to the business event services and/or digital gateway for online gateway that are available online. entrepreneurs 6468/26 ADD 1 27 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone completion Description of each milestone (Reform or Name indicators (for Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 51 3.4 #Bürokratt Target Access todigital Number of 0 1 Q2 2022 Number of digital public services programme (national public services public digital available through the platform of virtual) through the virtual services the virtual assistant. assistant platform accessible through the virtual assistant 52 3.4 #Bürokratt Target Bürokratt virtual Number of 0 18 Q4 2025 Number of public authority programme (national assistant on public websites websites in which the virtual virtual) authorities’website assistant provides services. s 54 3.5 Reconfiguration of Milestone Development of Opening of shared Q3 2022 Basic IT services provided/shared basic digital services and centrally server hosting and centrally shall open for subscription safe transition to cloud delivered/shared IT computer by new users (ministries and other infrastructure base services workstation services authorities). to public authorities 55 3.5 Reconfiguration of Target Deployment of Number of 0 10 Q4 2023 Number of information systems for basic digital services and national private information which the migration to the private safe transition to cloud cloud systems cloud infrastructure shall be infrastructure infrastructure by migrated to completed. public authorities the national private cloud 56 3.5 Reconfiguration of Milestone Extension of the Completion of the Q4 2023 It shall become possible to host and basic digital services and cloud extension ofthe operate information systems safe transition to cloud infrastructure to national private migrated to the private cloud from infrastructure the data embassy cloud to the the data embassy. New hardware and infrastructure of licenses shall be acquired and set Estonia’s data up for this purpose. embassy 6468/26 ADD 1 28 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone completion Description of each milestone (Reform or Name indicators (for Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 58 3.5 Reconfiguration of Target Security testing by Number of 0 16 Q4 2024 Number of security tests carried out basic digital services and the Information tests by the Information System safe transition to cloud System Authority Authority. infrastructure The test results shall be summarised in security testing reports. 59 3.6 The strategic Milestone Entry into force of Entry into force of Q4 2024 Legal act(s) shall have entered into analysis of money legal act(s) legal act(s) force to allow the Centre for laundering and terrorist Strategic Analysis to access and financing in Estonia process data relevant to the detection and prevention of money laundering and terrorist financing: (1) the statute of the Financial Intelligence Unit shall enter into force establishing the Centre for Strategic Analysis. (2) an amendment of the Money Laundering and Terrorist Financing Prevention Act shall enter into force. 60 3.7 Information system Milestone ICT system for ICT system available Q2 2026 The ICT system for strategic for strategic analysis of strategic analysis for use by the analysis of money laundering shall be money laundering and Financial available for use by the Financial terrorist financing Intelligence Unit Intelligence Unit. 6468/26 ADD 1 29 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone completion Description of each milestone (Reform or Name indicators (for Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 62 3.8 Construction of very Target Number of very Number of 0 100 Q4 2025 Number of projects confirmed by high capacity broadband high capacity projects the Consumer Protection and networks broadband network Technical Regulatory Authority projects confirmed (TTJA) to be respecting the requirements of the ministerial Regulation on the conditions and procedure for the support measure for the construction of a VHCN. The ministerial Regulation shall define the VHCN using the end users' download speed of at least 100 Mbps. 6468/26 ADD 1 30 ANNEX ECOFIN 1A EN D. COMPONENT 4: ENERGY AND ENERGY EFFICIENCY This component of the Estonian recovery and resilience plan addresses the challenge of decarbonising the energy sector. The objectives of the component are to reduce the dependency on oil shale, incentivise uptake of renewable energy and improve the energy efficiency of buildings. The component supports addressing the Country Specific Recommendation to focus investments on energy infrastructure and on resource and energy efficiency, contributing to the progressive decarbonisation of the economy (Country Specific Recommendation 3 in 2019 and in 2020). Upgraded and new measures support addressing the Country Specific Recommendation on reducing reliance on fossil fuels through facilitating the deployment of renewable energy sources and increasing energy efficiency (Country Specific Recommendation 4 in 2022). It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the‘Dono significant harm’ Technical Guidance (2021/C58/01). D.1. Description of the reforms and investments for non-repayable financial support 4.1. Reform: Energy efficiency promotion The objective of the reform is to reduce the administrative barriers to energy efficient renovations. The measure consists of setting up a regional advisory network and training of technical consultants in order to provide the necessary information and incentivise renovations. 4.2. Investment: Support for the renovation of multi-apartment buildings The objective of the measure is to boost renovations of multi-apartment buildings in order to increase energy efficiency. The measure consists of support for energy efficiency renovations of multi-apartment buildings achieving an average level of primary energy savings of at least 30%. 4.3. Investment: Support for the renovation of small residential buildings The objective of the measure is to boost renovations of small residential buildings in order to increase energy efficiency. The measure consists of support for energy efficiency renovations of small residential buildings. 4.4. Reform: Boosting the green transition in the energy economy The objective of the measure is to contribute to decarbonising energy in Estonia. The measure consists of updating the National Development Plan of the Energy Sector and adopting legislation to accelerate the installation of renewable electricity production capacity. 4.5. Investment: Programme to increase the capacity of the electricity transmission network The objective of this measure is to enable the connection of additional renewable energy production to the transmission network. The measure consists of an increase in the capacity of the electricity transmission network. 6468/26 ADD 1 31 ANNEX ECOFIN 1A EN 4.6. Investment: Programme to boost energy production in industrial areas The objective of the measure is to incentivise the production of electricity close to consumption. The measure consists of supporting additional connection capacity for renewable electricity production in or near industrial sites. 4.7. Investment: Pilot Energy Storage Programme The objective of the measure is to carry out a pilot programme on renewable energy storage in Estonia. The investment consists of grants to companies investing in heat and electricity storage capacity. 4.8. Investment: Boosting offshore wind farms development The objective of this measure is to make it possible for offshore wind turbines, regardless of their height, to operate in the Gulf of Riga and Estonian islands Hiiumaa, Saaremaa and Vormsi. The measure consists of the signature of contracts on designing air surveillance radars and passive radar systems, construction works for radar buildings and the removal of height restriction on offshore wind turbines. 6468/26 ADD 1 32 ANNEX ECOFIN 1A EN D.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 63 4.1 Energy Milestone Conclusion of the Conclusion of the Q4 2022 Conclusion of a cooperation agreement by efficiency cooperation agreement cooperation SA KredEx/Enterpise Estonia with county promotion stipulating conditions agreement development centers by which in each for cooperation between between SA county of Estonia SA KredEx/Enterpise SAKredEx/Enterprise KredEx/ Estonia shall provide at least one trained Estonia and county Enterpise Estonia specialist in the county development development centers and county centre who shall provide advice on development renovation. centers 65 4.2 Support for the Milestone Publication of calls for Publication of Q2 2022 SA KredEx/Enterprise Estonia shall renovation of applications for calls for housing publish calls for applications aimed at multi-apartment residential apartment renovation grants improving the energy efficiency of buildings buildings renovation residential apartment buildings. The grants support shall be differentiated between regions on the basis of the value of the real estate, with a higher rate of support in regions with low average property value. Support shall be granted to renovation projects that achieve an improvement of at least one energy efficiency class or, in the case of complete renovations, at least the energy efficiency class C. The renovations shall correspond to at least medium-depth renovations representing an average level of primary energy savings of at least 30% as set out in European Commission Recommendation (EU) 2019/786. The results shall be certified by ex-ante and ex-post Energy Performance Certificates. 6468/26 ADD 1 33 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 66 4.2 Support for the Target Multi-apartment Number of 0 80 Q2 2026 The renovations of at least 80 multi- renovation of buildings with improved multi- apartment buildings shall result in an multi-apartment energy performance apartment average level of primary energy savings buildings buildings of at least 30%. The results shall be certified by ex-ante and ex post (calculated) Energy Performance Certificates of the building. 68 4.3 Support for the Milestone Published calls for Publication of Q2 2022 SA KredEx/Enterprise Estonia shall renovation of small renovation grant calls publish calls for applications aimed at residential improving the energy efficiency of buildings private residential buildings. The support shall be differentiated between regions on the basis of the value of the real estate, with a higher rate of support in regions with low average property value. Support shall be granted to renovation projects that achieve an improvement of energy efficiency or, in the case of complete renovations, at least the energy efficiency class C. The results shall be certified by ex-ante and ex-post SA KredEx Energy Performance calculations. 69a 4.3 Support for the Target Small residential Number of 0 900 Q1 2026 At least 900 small residential buildings renovation of small buildings with improved small shall be renovated and achieve an residential energy performance residential increase in energy efficiency or, in the buildings buildings case of complete renovations, at least the energy efficiency class C. The results shall be certified by ex-ante and ex-post KredEx Energy Performance calculations. 6468/26 ADD 1 34 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 70 4.4 Boosting the Milestone Government decision on Adoption of the Q2 2021 The Government shall adopt a decision green transition in investments needed to decision of the on making the necessary investments to the energy alleviate the defence Government alleviate the defence related height economy related height restrictions on wind parks. restrictions on wind parks 71 4.4 Boosting the Milestone Adoption of the decision Adoption of the Q4 2021 Government decision on initiating the green transition in of the Government on decision of the preparation process of the National the energy the initiation of the Government Development Plan of the Energy Sector economy preparation process of shall be approved, defining the the National responsible entity (ies) and setting the Development Plan of the relevant deadlines. The development plan Energy Sector, the shall address, inter alia, the objectives of designation of those increasing renewable energy production, responsible and energy efficiency and maintaining and deadlines improving security of supply, as well as the cessation of the use of oil shale for electricity production in 2035 and the phasing out of shale oil production by 2040. 72 4.4 Boosting the Milestone Entry into force of legal Legal act entered Q4 2024 Legal acts shall enter into force to green transition in acts into force remove the barriers to installation of the energy renewable energy generation and storage economy facilities for example streamlining permitting procedures. 6468/26 ADD 1 35 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 73 4.4 Boosting the Milestone Adoption of the Document Q4 2025 The National Development Plan of the green transition in National Development adopted by the Energy Sector shall be adopted by the the energy Plan of the Energy Government Government. The plan shall include the economy Sector by the actions related to the phase-out of direct Government burning of oil shale for electricity production by 2035 with an exception for out-of-market oil shale for potential strategic reserve needs in case of deviation from the reliability standard. The plan shall include actions related to the phase-out of the use of shale oil in domestic heat production by 2040. It shall also include targets for electricity generation capacity to be replaced with renewable energy and other clean energy technologies. 74 4.5 Programme to Milestone Signature of network Signature of a Q1 2022 A co-financing agreement for electricity increase the investment co-financing contract with the network investments shall be concluded capacity of the contract with transmission between the Ministry of Economic electricity transmission system system operator Affairs and Communications and Elering transmission operator AS. The contract shall set out the network expected results and deadlines. 75 4.5 Programme to Target Additional grid capacity Additional 0 310 Q2 2026 Increase in the capacity of the Estonian increase the grid electricity transmission network by at capacity of the capacity least 310 MW. electricity (MW) transmission network 6468/26 ADD 1 36 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 76 4.6 Programme to Milestone Publication of a call for Call for Q4 2022 An open call shall be published by the boost energy proposals for projects proposals Environmental Investment Centre to production in boosting energy published support the grid connection costs of industrial areas production in industrial companies producing electricity from sites renewable sources in industrial sites. The call shall be based on project selection criteria and award conditions that ensure that the selected projects comply with the‘Do no significant harm’ Technical Guidance (2021/C58/01) through the use of an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation. 77 4.6 Programme to Target Additional connection Connection 0 28 Q2 2026 Additional connection capacity for boost energy capacity for renewable capacity renewable electricity production in or production in electricity production created near industrial sites constructed for at industrial areas (MW) least 28 MW as specified in the confirmation letter from the network company. 6468/26 ADD 1 37 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 78 4.7 Pilot Energy Milestone Publication of a call for Call for Q4 2022 An open call for proposals shall be Storage proposals for a pilot proposals published by the Environmental Programme energy storage published Investment Centre to support energy programme storage projects. The call shall be based on project selection criteria and award conditions that ensure that the selected projects comply with the‘Do no significant harm’Technical Guidance (2021/C58/01) through the use of an exclusion list and the requirement of compliance with the relevant EU and national environmental legislation. The selection/eligibility criteria shall specify that the supported activities and/or enterprises contribute to climate-neutral economy, climate resilience and climate change adaptation, including circular 80 4.7 Pilot Energy Milestone Additional heat and Additional Q2 2026 economy The objectives. investment support scheme shall Storage electricity storage energy storage result in the installation of at least 23 600 Programme capacity resulting from capacity m³ heat storage capacity and at least 10 investment support MW of electricity storage capacity. 80a 4.8 Boosting Milestone Contractors for the radar Contracts signed Q4 2024 Contracts signed for the detailed design offshore wind and passive radar of air surveillance radar, passive radar farms development systems selected and systems and construction works for radar contracts signed buildings. 80c 4.8 Boosting Milestone Removal of the height Notice Q2 2026 Notice issued by the Ministry of offshore wind restriction on offshore Defence, stating that the height farms development wind turbines in the Gulf restrictions on offshore wind turbines have of Riga and Estonian been lifted in the Gulf of Riga and islands Hiiumaa, Estonian islands of Hiiumaa, Saaremaa Saaremaa, Vormsi and Vormsi. 6468/26 ADD 1 38 ANNEX ECOFIN 1A EN E. COMPONENT 5: SUSTAINABLE TRANSPORT The component of the Estonian recovery and resilience plan aims at addressing the challenge of decarbonising the transport sector. The objectives of the component are to reduce emissions and incentivise the uptake of sustainable modes of transport. The reform and investments of the component support the development of the cross-border Rail Baltic project, connecting the three Baltic capitals and countries with Poland and the rest of the Union. The measures in the component aim at connecting the Rail Baltic with other national railways and other TEN-T hubs (Tallinn Airport and Old Port) and facilitating access to its local stops on foot or by bicycle. The component supports addressing the Country Specific Recommendation to focus investments on resource efficiency and sustainable transport contributing to decarbonisation of the economy (Country Specific Recommendation 3 in 2019 and in 2020). The new measures also correspond to the Country Specific Recommendation to intensify efforts to improve the sustainability of the transport system, including through electrification of the rail network and by increasing incentives to encourage sustainable and less polluting transport (Country Specific Recommendation 4 in 2022). It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the‘Dono significant harm’ Technical Guidance (2021/C58/01). E.1. Description of the reforms and investments for non-repayable financial support 5.1. Reform: Safe, green, competitive, needs-based and sustainable transport and energy infrastructure The objective of the reform is to reduce the CO2 emissions of the transport sector and incentivise the uptake of sustainable modes of transport. The measure consists of the adoption of the new Transport and Mobility Development Plan and the related Implementation Plan to reduce the CO2 emissions and reach a share of renewables in the energy consumed in the transport sector of 24% by 2035. 5.2. [deleted] 5.2.a Investment: Multifunctional work vessel The objective of the investment is to ensure the safety and condition of the waterways necessary for the operation of maritime transport, enable anti-pollution operations to be carried out and increase research capacity for environmental studies. The investment consists in building a low-emission vessel. 5.3.a Investment: Construction of the Rail Baltic viaducts and terminal The objective of the measure is to increase the share of sustainable mobility in Estonia and to contribute to the Rail Baltic project, which connects the three Baltic States. The investment consists of the construction of four viaducts and one tunnel, as well as construction of the Rail Baltic Ülemiste terminal. 6468/26 ADD 1 39 ANNEX ECOFIN 1A EN The RRF shall support part of the costs of this investment. This investment may also receive support from other Union programmes or instruments for costs that are not supported by the RRF. 5.3.b Investment: Renovation of a section of the railway from Rapla to Lelle The objective of the measure is to increase the lifespan of Estonia’s sustainable mobilty network. The investment consists of renovating the railway superstructure of a 23 km long section of existing railway from Rapla to Lelle. 5.4. Investment: Construction of the Tallinn Old Port tram line The objective of the measure is to increase the share of sustainable mobility in the Tallinn region. The investment consists of constructing a new tramline. 5.5 Investment: Municipalities’ investments in bike- and walkways The objective of the measure is to reduce car dependency and increase sustainable mobility in areas outside the three major urban centres (Tallinn, Tartu, Pärnu). The investment consists of construction works for bike- and walkways. 6468/26 ADD 1 40 ANNEX ECOFIN 1A EN E.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone (Reform or Name indicators (for completion Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 81 5.1 Safe, green, Milestone Adoption of the Adoption of the Q1 2022 The Transport and Mobility competitive, needs- Transport and Transport and Development Plan 2021-2035 shall be based and Mobility Mobility approved by the Government. It shall sustainable transport Development Plan Development Plan include the creation of the Tallinn and energy 2021-2035 by the 2021-2035 capital region common transport infrastructure Government system, actions to facilitate uptake of local biomethane, actions to develop sustainable and active urban mobility in bigger towns following the logic of integrated transport corridors, planning multimodal infrastructure, increasing the connections, speed and safety of rail, making the maritime transport sector more competitive and greener and connect it multimodally, developing faster and safer road transport. The plan shall include a target to reduce CO2 emissions by 700 000 tons (or 30%) compared to 2018 levels and reach a share of renewables in the energy consumed in the transport sector of 24% by 2035. 6468/26 ADD 1 41 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone (Reform or Name indicators (for completion Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 82 5.1 Safe, green, Milestone Adoption of the Adoption of the Q4 2022 The implementation plan shall be competitive, needs- Implementation Plan Implementation Plan approved by the Steering Committee based and for green sustainable of the Transport and Mobility sustainable transport public transport Development Plan 2021-2035. It and energy development of the shall include the creation of the infrastructure Transport and Tallinn capital region common Mobility transport system, actions to facilitate Development Plan uptake of local biomethane, actions to 2021-2035 develop sustainable and active urban mobility in bigger towns following the logic of integrated transport corridors, planning multimodal infrastructure, increasing the connections, speed and safety of rail, making the maritime transport sector more competitive, greener and connect it multimodally, developing faster and safer road transport. The implementation plan shall include an annual reporting obligation on the responsible minister to the Government. 84a 5.2.a Multifunctional Milestone Contract signed for Contract signed Q1 2024 The contract for the building of the work vessel building of the vessel multifunctional work vessel shall be signed by the contractor and the National Fleet (Riigilaevastik). The contract shall include a specification of the fuel to be used by the vessel in line with‘DoNo Significant Harm’requirements set out in the description of the investment. 85a 5.2.a Multifunctional Milestone Multifunctional work Vessel built Q2 2026 The multifunctional work vessel work vessel vessel built shall be built. 6468/26 ADD 1 42 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone (Reform or Name indicators (for completion Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 86a 5.3.a Construction of Milestone Works contracts for Works contracts Q3 2023 Works contracts signed for the the Rail Baltic the construction of signed following Rail Baltic viaducts: viaducts and Rail Baltic viaducts Kangru viaduct, Raudalu viaduct, terminal Raku viaduct, Männiku light traffic viaduct and Männiku light traffic tunnel. 87a 5.3.a. Construction Milestone Viaducts constructed Acceptance Q2 2026 Certificates of acceptance shall be of the Rail Baltic and disbursement certificates issued for issued for the construction of the viaducts and made for the construction of Kangru viaduct, Raudalu viaduct, terminal construction work of the viaducts and Raku viaduct, Männiku light traffic terminal disbursement made viaduct and Männiku light traffic tunnel. At least EUR 8.84 million shall be paid towards the construction of theÜlemiste terminal. Any amounts provided by other Union programmes or instruments shall not be counted towards this amount. 88b 5.3b Renovation of a Milestone Renovation of Certificate of Q1 2026 Certificate of acceptance for the section of the railway section acceptance renovation of 23 km of railway in the railway from Rapla section Rapla to Lelle. to Lelle 89 5.4 Construction of Milestone Completion ofthe Approval of the Q4 2021 Tallinn Urban Planning and Utilities the Tallinn Old Port tramway projectdesign Board shall adopt the design of the tram line construction project tramway construction project. design 90 5.4 Construction of Milestone Award of works Contract signed for Q2 2022 Works contract concluded between the Tallinn Old Port contract the construction of Tallinn Urban Planning and Utilities tram line the tramway line Board and the contractor for the construction of the tramway line between Gonsiori street and Põhja Puiestee. 6468/26 ADD 1 43 ANNEX ECOFIN 1A EN Quantitative indicators (for Indicative Related Measure Qualitative targets) timeline for Sequential Milestone Description of each milestone (Reform or Name indicators (for completion Number /Target and target Investment) milestones) Unit of Baseline Goal Quarter Year measure 91 5.4 Construction of Milestone New tramway line New tramway line in Q4 2025 New 2 500m section of tramway line the Tallinn Old Port operation in operation as confirmed by the tram line permit to operate. 92 5.5 Milestone Call for proposals for Publication of the Q4 2022 An open call for investment by Municipalities’invest grants notice for call for municipalities in bike- and walkways ments in bike- and proposals for grants shall be published. 93 walkways 5.5 Municipalities’ Target Construction works Construction 0 18 Q4 2025 At least 18 construction works of investments in bike- on bike- and works bike and walkways shall be and walkways walkways delivered delivered. 6468/26 ADD 1 44 ANNEX ECOFIN 1A EN F. COMPONENT 6: HEALTHCARE AND SOCIAL PROTECTION This component of the Estonian recovery and resilience plan aims to address the challenges related to the resilience of and access to the health care system, the adequacy of the social safety net, accessibility of social services and youth unemployment. The objectives of the measures included in the component are to: address workforce shortages in the health sector, strengthen primary and hospital care, extend the duration of the unemployment insurance benefit in periods of high unemployment, improve access to social services, address youth unemployment and reduce the gender pay gap. The component supports addressing the Country Specific Recommendation, on improving the accessibility and resilience of the health system, including by addressing the shortages of health workers, strengthening primary care and ensuring the supply of critical medical products (Country Specific Recommendation 1 in 2020), on improving the social safety net, increasing access to social services in an integrated way (Country Specific Recommendation 2 in 2019, Country Specific Recommendation 2 in 2020 and Country Specific Recommendation 3 in 2022) and on reducing the gender pay gap, including by improving wage transparency (Country Specific Recommendation 2 in 2019). It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the‘Dono significant harm’ Technical Guidance (2021/C58/01). F.1. Description of the reforms and investments for non-repayable financial support 6.1. Reform: A comprehensive change in the organisation of health care in Estonia The objective of the reform is to support the resilience of the Estonian health system, including for coping with crises, thus ensuring that people have access to high-quality, integrated healthcare throughout Estonia. The measure consists of reforms a. to consolidate the hospital network, b. to outline the provision of health services in the various health sectors, c. to incentivise doctors, nurses and pharmacists to work in remote areas, and d. to increase the admission in medical professions with shortages. 6.2. [deleted] 6.2.a Investment: Construction of TERVIKUM The objective of the investment is to contribute to improving the access to health care as well as the provision of health and social care in an integrated way. The investment consists of building a new health centre in the city of Viljandi. 6.3. Reform: Strengthening primary health care The objective of the reform is to ensure access to general medical care, improve the continuity of treatment and make provision of primary health care more flexible and human-centred. The reform consists of three sub-measures. First, in order to improve access to specialist care the use of e- consultation in primary care was extended on 30 September 2020 allowing patients to be advised by a specialist without having to consult them face-to-face. Second, legislation entered into force on 31 6468/26 ADD 1 45 ANNEX ECOFIN 1A EN March 2021 improving access to health care by increasing the level of support for general practitioners and by modifying the funding model for general medical care with a view to making working in primary health centres in remote areas more attractive. Third, the Health Services Organisation Act shall be amended as regards the management of the list of patients, ensuring continuity of primary care and extending the rights of nurses to prescribe medicines to patients. The implementation of the reform shall be completed by 31 March 2023. 6.4. Reform: Renewal of the eHealth Governance The objective of the reform is to update the governance framework for eHealth with a view to better responding to the needs of the health system and ensure the development of digital solutions to support a sustainable health system in Estonia. The reform consists of adopting a revised national governance model for information and communication technology of the current health system to provide a forward-looking new eHealth governance model and promote a common understanding among partners of the division of roles and responsibilities in eHealth. The implementation of the reform shall be completed by 30 June 2023. 6.5. [deleted] 6.6. Investment: Providing labour market measures to reduce youth unemployment The objective of the investment is to help young people get into employment. The measure consists of a legislation on the renewed“M yfirst job” (M1T) scheme; support for the enrolement in labour market related measures, and a reinforced Youth Guarantee Action Plan. 6.7. Reform: Extending the duration of unemployment insurance benefits The objective of the reform is to address the long-standing challenge of improving the adequacy of the social safety net. The reform consists of the establishment of a mechanism to activate the extension of the period of the unemployment insurance benefits by 60 days, notably when the registered unemployment rate exceeds the non-accelerating inflation/wage rate of unemployment (NAIRU/NAWRU) by a significant margin. The mechanism of prolongation and the margin, which shall not be higher than 2%, shall be agreed upon in dialogue with the social partners. The measure aims at helping people to bridge a longer period of unemployment in difficult labour market conditions. The reform shall be implemented by 30 June 2023. 6.8. Reform: Long-term care The objective of the reform is to support the provision of long-term care. The reform consists of legislative amendments to define the concept of long-term care, to provide for the modernisation and integration of services for children with higher care needs, and an Action plan for integrated social and health care. 6.9. Reform: Reducing gender pay gap The objective of the reform is to reduce the gender pay gap. The reform consists of the adoption of the Welfare Development Plan for 2023-2030 and its implementation and the roll out of a digital gender pay gap tool. The Welfare Development Plan shall be adopted by 31 March 2024 and it shall 6468/26 ADD 1 46 ANNEX ECOFIN 1A EN lay down the strategic objectives of reducing social inequalities and poverty, ensuring gender equality and greater social inclusion, and promoting equal treatment of persons belonging to minority groups. The Development Plan shall outline measures to reduce the gender pay gap, in particular by increasing wage transparency, reducing the prevalence and negative impact of gender stereotypes on the lives and decisions of women and men, including concerning educational and career choices and carrying the care burden, and supporting a more effective implementation of the Gender Equality Act. A digital gender pay gap tool shall be rolled out by 31 March 2024 which shall offer employers a simple and easy tool to receive and analyse data and information concerning the gender pay gap and its possible reasons in their organisations and thereby supporting them in making informed decisions and taking effective action to implement the principle of equal pay and to reduce the gender pay gap. The implementation of the reform shall be completed by 31 March 2024. 6468/26 ADD 1 47 ANNEX ECOFIN 1A EN F.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support Indicative timeline for Related Measure Qualitative Quantitative indicators (for targets) Sequential Milestone completion Description of each (Reform or Name indicators (for Number /Target Unit of milestone and target Investment) milestones) Baseline Goal Quarter Year measure 94 6.1 A comprehensive Milestone Entry into force of Entry into force of Q4 2024 Entry into force of the change in the theGovernment theGovernment Government Order which shall organisation of health Order on the Order lay down: care in Estonia Hospital network - the list of regional, central, development local and rehabilitation hospitals roadmap in order to ensure equal access to health care services; - objectives and steps to be taken for consolidating the hospital network; - the necessary investments for the construction and renovation of the hospitals included in the list of hospitals. 95 6.1 A comprehensive Milestone Approval of the Approval of the Q4 2022 The Strategic Framework for change in the Strategic Framework Strategic addressing health workforce organisation of health for addressing health Framework for shortages shall outline: care in Estonia workforce shortages addressing health - measures on the organisation of workforce health care services in the shortages bythe different health sectors, in Minister of Health particular specialised care, and Labour - allocation of physical and human resources to ensure the provision of health care throughout the territory, - financing, governance and information exchange mechanisms that ensure performance throughout the country. 6468/26 ADD 1 48 ANNEX ECOFIN 1A EN Indicative timeline for Related Measure Qualitative Quantitative indicators (for targets) Sequential Milestone completion Description of each (Reform or Name indicators (for Number /Target Unit of milestone and target Investment) milestones) Baseline Goal Quarter Year measure 96 6.1 A comprehensive Milestone Entry into force of Entry into force of Q1 2023 Entry into force of the Decrees change in the the Decrees of the the Decrees of the of the Minister of Health and organisation of health Minister of Health Minister of Health Labour which shall improve the care in Estonia and Labour and Labour reimbursement system for amending the doctors and pharmacists to reimbursement incentivise the health workforce system for doctors to work in remote areas. and pharmacists 96a 6.1 A comprehensive Milestone Entry into force of the Entry into force of Q2 2024 Entry into force of the Decree change in the Decree of the Minister the Decree of the of the Minister of Health and organisation of health of Health and Labour Minister of Health Labour and the amendment to the care in Estonia and the amendment to and Labour and of Health Services Organisations the Health Services the amendment to the Act which shall establish the Organisations Act Health Services reimbursement system for establishing the Organisations Act nurses to incentivise them to reimbursement work in remote areas. This system for nurses reimbursement system shall cover general and advanced practice nurses, in primary health care and hospitals. 97 6.1 A comprehensive Target Admission to Percentage 0 5 Q4 2023 The admission of persons to change in the nursing training increase in the nursing training has been organisation of health number of increased by 5% compared to care in Estonia persons 2020. admitted to nursing training 6468/26 ADD 1 49 ANNEX ECOFIN 1A EN Indicative timeline for Related Measure Qualitative Quantitative indicators (for targets) Sequential Milestone completion Description of each (Reform or Name indicators (for Number /Target Unit of milestone and target Investment) milestones) Baseline Goal Quarter Year measure 98 6.1 A comprehensive Milestone Entry into force of Entry into force of Q2 2026 Entry into force of the change in the the Ministerial the Ministerial Ministerial Regulation organisation of health Regulation Regulation and amending the agreement care in Estonia amending the agreement between between the Ministry of Social agreement between the Ministry of Affairs and the University of the Ministry of Social Affairs and Tartu which shall lay down the Social Affairs and the theUniversityof requirements for the gradual University of Tartu increase of admission in medical Tartu on the shortage professions with shortages. of doctors in certain specialisations 99a 6.2.a Construction of Milestone Signature of the Signature of the Q2 2023 The Riigi Kinnisvara AS (the TERVIKUM contract for the contract representative of the Viljandi construction of Haigla) and the contractor shall TERVIKUM sign a contract for the construction of TERVIKUM, including the installation of the technical building systems, in particular the technical equipment for heating, cooling, ventilation, hot water, lighting and electricity production, measurement, monitoring and control systems and interior works. 100a 6.2.a Construction of Milestone TERVIKUM TERVIKUM Q4 2025 The TERVIKUM, consisting of TERVIKUM constructed constructed a general hospital and health care centre, shall be constructed. 6468/26 ADD 1 50 ANNEX ECOFIN 1A EN Indicative timeline for Related Measure Qualitative Quantitative indicators (for targets) Sequential Milestone completion Description of each (Reform or Name indicators (for Number /Target Unit of milestone and target Investment) milestones) Baseline Goal Quarter Year measure 106 6.3 Strengthening Milestone Entry into force of the Entry into force of Q3 2020 Entry into force of legislative primary health care Decree of the legislative amendments which shall Government, which amendments to the improve the access to amends the list of Decree of the specialised care by extending the health care services Government use of e-consultation in primary of the Estonian care allowing patients to be Health Insurance advised by a specialist without Fund on access to having to consult them face-to- specialised medical face. care 107 6.3 Strengthening Milestone Entry into force of Entry into force of Q1 2021 Legislative amendments shall primary health care amendments to the the legislative enter into force providing for the Decree of the amendments to the financing of fixed costs and Government which Decree of the services for general amends the list of Government practitioners in order to increase health care services the allocation of resources to of the Estonian primary medical practice Health Insurance outside metropolitan areas, Fund on costs and especially in remote areas, and services of general to increase patients’ access to practitioners diagnostic and screening services. 108 6.3 Strengthening Milestone Entry into force of Provision in the law Q1 2023 Entry into force of the primary health care amendments to the indicating the entry amendments to Health Services Health Services into force of the Organisation Act which shall Organisation Act law amend the management of the list of patients, ensure continuity of primary care and extend the rights of nurses to prescribe medicines to patients. 6468/26 ADD 1 51 ANNEX ECOFIN 1A EN Indicative timeline for Related Measure Qualitative Quantitative indicators (for targets) Sequential Milestone completion Description of each (Reform or Name indicators (for Number /Target Unit of milestone and target Investment) milestones) Baseline Goal Quarter Year measure 109 6.4 Renewal of the Milestone Approval of the Approval of the Q2 2023 Approval of the proposal on the eHealth Governance eHealth Governance proposal on the Governance Framework and Framework and its eHealth implementation roadmap which implementation Governance shall update the governance roadmap Frameworkand framework for eHealth and the implementation coordination of the roadmap by the development of eHealth Steering services. Committee of the“Eesti tervise IKT juhtimise raamistik” 113 6.6 Providing labour Milestone Entry into force of Entry into force of Q1 2022 Entry into force of the Decree market measures to the Decree of the the Decree of the of the Minister of Health and reduce youth Minister of Health Minister of Health Labour which shall define the unemployment and Labour to and Labour characteristics of the scheme strengthen the “My and the conditions for its First Job” scheme implementation, including financing and target group. The aim of the scheme shall be to enable young people without work experience or with little work experience to gain work experience and to improve their skills to participate in the labour market. 6468/26 ADD 1 52 ANNEX ECOFIN 1A EN Indicative timeline for Related Measure Qualitative Quantitative indicators (for targets) Sequential Milestone completion Description of each (Reform or Name indicators (for Number /Target Unit of milestone and target Investment) milestones) Baseline Goal Quarter Year measure 114 6.6 Providing labour Milestone Youth Guarantee Adoption ofthe Q2 2022 The Government shall adopt an market measures to Action Plan reinforced Youth amended Youth Guarantee reduce youth youth Guarantee Action Action Plan to support youth unemployment Plan by the employment. This action plan Government shall - include measures to improve the skills of young people, - define actions to prevent and address youth unemployment, including outreach and prevention of NEET-situation - define key parties and their roles of preventing and dealing with youth unemployment. 115 6.6 Providing labour Target Number of young Number of 0 3 178 Q4 2025 At least 3 178 young people market measures to people enrolled in participants aged 15-29 have been enrolled reduce youth labour market related in labour market related unemployment measures measures, of which at least 2 000 in the“MyFirst Job”scheme. 6468/26 ADD 1 53 ANNEX ECOFIN 1A EN Indicative timeline for Related Measure Qualitative Quantitative indicators (for targets) Sequential Milestone completion Description of each (Reform or Name indicators (for Number /Target Unit of milestone and target Investment) milestones) Baseline Goal Quarter Year measure 116 6.7 Extending the Milestone Entry into force of Entry into force of Q2 2023 Entry into force of the duration of the amendments to the legislative amendments to the Act which unemployment the Unemployment amendments shall lay down a permanent insurance benefits Services and mechanism to activate the Benefits Act and the extension of the duration of Unemployment unemployment insurance Insurance Act benefits by 60 days, notably when the registered unemployment rate exceeds the non-accelerating inflation/wage rate of unemployment by a significant margin. The mechanism of prolongation and the margin, which shall not be higher than 2%, shall be agreed upon in dialogue with the social partners. 117 6.8 Long-term care Milestone Entry into force of Entry into force of Q2 2022 Entry into force of legislative amendments to the legislative amendments to the Social Social Welfare Act amendments Welfare Act which shall lay down the concept of long-term care and require local authorities to take into account the principle that a person must be able to live as long as possible in his or her home, in his or her usual environment, with sufficient quality services available. 6468/26 ADD 1 54 ANNEX ECOFIN 1A EN Indicative timeline for Related Measure Qualitative Quantitative indicators (for targets) Sequential Milestone completion Description of each (Reform or Name indicators (for Number /Target Unit of milestone and target Investment) milestones) Baseline Goal Quarter Year measure 118 6.8 Long-term care Milestone Action Plan on an Adoption of the Q4 2022 The Ministry of Social Affairs integrated care Action Plan shall adopt an Action Plan that model provides for the establishment of an integrated care model throughout Estonia and the roles and responsibilities of the actors involved in the future financing model of the system. 120 6.8 Long-term care Milestone Entry into force of Entry into force of Q1 2025 Entry into force of the legal act the legislative the legislative which shall provide for the amendments of the amendments modernisation and integration support system for of services for children with children with higher higher care needs. In particular, care needs - services in the health, education, social protection and employment areas shall be integrated in order to provide support for families under care burden, and - the current support system shall be simplified and the assessment of care needs consolidated. 121 6.9 Reducing gender Milestone Adoption of the Adoption ofthe Q1 2024 The Plan shall outline the pay gap Welfare Welfare measures to reduce the gender Development Plan Development Plan pay gap. 2023-2030 by the government 6468/26 ADD 1 55 ANNEX ECOFIN 1A EN Indicative timeline for Related Measure Qualitative Quantitative indicators (for targets) Sequential Milestone completion Description of each (Reform or Name indicators (for Number /Target Unit of milestone and target Investment) milestones) Baseline Goal Quarter Year measure 122 6.9 Reducing gender Milestone Digital gender pay Developing a Q4 2022 A prototype of a gender pay gap pay gap gap tool prototype of a tool for employers shall be gender pay gap developed with the aim of tool providing them with data and information concerning the gender pay gap and its possible reasons in their organisations and thereby supporting making informed decisions and taking effective action in order to implement the principle of equal pay and to reduce the gender pay gap. 123 6.9 Reducing gender Milestone Digital gender pay Roll-out of a Q1 2024 The digital gender pay gap tool pay gap gap tool digital gender pay shall be available to employers gap tool with the aim of providing them with data and information concerning the gender pay gap and its possible reasons in their organisations and thereby supporting making informed decisions and taking effective action in order to implement the principle of equal pay and to reduce the gender pay gap. 6468/26 ADD 1 56 ANNEX ECOFIN 1A EN G. AUDIT AND CONTROL G.1. DESCRIPTION OF THE REFORMS AND INVESTMENTS FOR NON-REPAYABLE FINANCIAL SUPPORT The objective of the reform is to set the legal framework for the implementation and monitoring of the recovery and resilience plan. It shall define the roles played by relevant public entities in the implementation of the plan and how these bodies shall carry out their tasks. The implementation of the reform shall be completed by 31 December 2021. 6468/26 ADD 1 57 ANNEX ECOFIN 1A EN G.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support Quantitative indicators (for targets) Indicative Related Measure Qualitative timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 124 Monitoring and Milestone Entry into force of the Entry into force of Q4 2021 Entry into force of the regulation implementation of Government government establishing the legal framework for the the plan Regulation onthe legal regulation implementation and monitoring of the framework for the recovery and resilience plan of Estonia implementation and before the first payment request is monitoring of the made. The regulation shall at least recovery and define the authorities involved in the resilience plan of implementation of the recovery and Estonia. resilience plan of Estonia and their tasks including the tasks of the Ministry of Finance, the sectoral ministries and the State Shared Service Center. 6468/26 ADD 1 58 ANNEX ECOFIN 1A EN H. COMPONENT 8: REPOWEREU The REPowerEU chapter addresses the challenge of reducing reliance on fossil fuels. The objectives of the component are to facilitate the deployment of renewable energy sources; to facilitate decarbonising selected economic sectors; to increase the capacity of the electricity distribution network; to boost the uptake of sustainable biomethane and to accelerate the integration of renewable energy sources. The REPowerEU chapter supports addressing the Country Specific Recommendation to reduce overall reliance on fossil fuels by accelerating the deployment of renewables, including through further streamlining of permitting procedures and strengthening the domestic electricity network (Country Specific Recommendation 4 in 2022). It is expected that no measure in this component does significant harm to environmental objectives within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description of the measures and the mitigating steps set out in the recovery and resilience plan in accordance with the‘Dono significant harm’ Technical Guidance (2021/C58/01). The implementation of the measure facilitating the deployment of renewable energy sources, the measure to increase the access of renewable energy production to the electricity distribution network and the measure increasing production and uptake of sustainable biomethane are all expected to contribute to reducing dependency on fossil fuels. Increasing the share of renewable energy sources has a cross-border or multi-country dimension, especially in the Baltic region and Finland, because it contributes to securing the energy supply in the Union as a whole. Less dependency on imported fossil fuels will also create European added value as it will free up supply for other Member States, in the current situation of natural gas supply constraints, and until other Member States succeed in reducing their dependency on fossil fuels. H.1. Description of the reforms and investments for non-repayable financial support 8.1 Reform: Facilitating the development of renewable energy sources The objective of the reform is to facilitate the development of renewable energy sources, notably wind energy. The reform consists of legislative amendments to streamline planning, permitting and environmental impact assessment processes for wind energy projects; the establishment of wind priority development areas; support to local authorities to improve administrative procedures, including permitting, for wind energy development. 8.2. Investment: Programme to increase the access of renewable energy production to the electricity distribution network The objective of the investment is to facilitate the use/development of electricity from renewable energy sources. The investment consists of works in the electricity network to increase its capacity. 8.3. Investment: Increasing production and uptake of sustainable biogas and biomethane The objective of this measure is to boost the uptake of sustainable biogas and sustainable biomethane and to accelerate the integration of renewable energy sources. 6468/26 ADD 1 59 ANNEX ECOFIN 1A EN The investment consists of an action plan for increasing the production and use of sustainable biogas and sustainable biomethane, and support for the uptake of sustainable biomethane. 6468/26 ADD 1 60 ANNEX ECOFIN 1A EN H.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support Quantitative indicators (for targets) Indicative Related Measure Qualitative timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 125 8.1 Facilitating the Milestone Publication ofthe call Publication of the Q3 2023 A call for proposals shall be published development of for proposals to call for proposals to support local authorities to hire renewable energy support local experts or procure services aimed at sources authorities improving administrative procedures, including permitting, for wind energy development. 126 8.1 Facilitating the Milestone Entry into force of Entry into force of Q2 2024 Legislative amendments to streamline development of the amendments to the amendments permitting, planning and environmental renewable energy the relevant laws impact assessment processes for wind sources streamlining energy projects shall enter into force. permitting, planning These shall include amending the and environmental following laws to the extent necessary: impact assessment the Building Code, the Water Act, the processes Planning Act, the Environmental Impact Assessment and Environmental Management System Act, the Environmental Charges Act and the Forest Act. 127 8.1 Facilitating the Milestone Governmental Governmental Q3 2024 The government shall adopt a decision development of decision establishing decision adopted establishing priority areas for wind renewable energy priority development energy development. The government sources areas for wind shall adopt the decision on the basis of energy a technical report. 128 8.1 Facilitating the Target Support to local Number of 0 20 Q1 2025 Following the call for proposals set out development of authorities local authorities in milestone 125 or through the use of renewable energy supported centrally procured services, 20 local sources authorities shall have received support to improve administrative procedures, including permitting, for wind energy development. 6468/26 ADD 1 61 ANNEX ECOFIN 1A EN Quantitative indicators (for targets) Indicative Related Measure Qualitative timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 129 8.2 Programme to Milestone Signature of the co- Signed agreement Q1 2024 Signature of the co-financing increase the access financing agreement agreement, for electricity distribution of renewable for electricity network works, between the Ministry energy production distribution network of Economic Affairs and tothe electricity works Communications and Elering AS for distribution the purpose of increasing the capacity network of the electricity distribution network by 160 MW. 130 8.2 Programme to Target Additional 160 MW MW of 0 160 Q1 2026 Electricity distribution network works increase the access capacity available additional shall result in an increase in the of renewable capacity capacity of the electricity distribution energy production available network of 160 MW. tothe electricity distribution network 131 8.3 Increasing Milestone Call for applications Call for Q2 2024 Publication of a call for applications for production and for grants to support applications grants to support the uptake of uptake of the uptake of published sustainable biomethane in line with the sustainable biogas biomethane Renewable Energy Directive (RED II). and biomethane The call shall contain, among the selection criteria, the requirement set out in the description of the investment. 133 8.3 Increasing Milestone Action plan for the Approved plan Q2 2025 The Minister of Climate and the production and production and use Minister of Regional Affairs and uptake of of biogas and Agriculture shall approve the action sustainable biogas biomethane plan for the production and use of and biomethane sustainable biogas and sustainable biomethane. 6468/26 ADD 1 62 ANNEX ECOFIN 1A EN Quantitative indicators (for targets) Indicative Related Measure Qualitative timeline for Sequential Milestone Description of each milestone and (Reform or Name indicators (for completion Number /Target target Investment) milestones) Unit of Baseline Goal Quarter Year measure 134 8.3 Increasing Target Installation of new Increase in 0 4 000 000 Q2 2026 Installed capacity for the production of production and biomethane installed sustainable biomethane shall increase by uptake of production capacity production at least 4 000 000 cubic metres under sustainable biogas capacity of the support scheme as demonstrated in and biomethane sustainable the final project implementation biomethane in reports. cubic metres 6468/26 ADD 1 63 ANNEX ECOFIN 1A EN 2. Estimated total cost of the recovery and resilience plan The estimated total cost of the modified RRP including the REPowerEU chapter of Estonia is EUR 953 380 000. The estimated total cost of the REPowerEU chapter is EUR 90 040 000. In particular, the estimated total costs of the measures referred to in Article 21c(3), point (a) of Regulation (EU) 2023/435 is EUR 0 whilst the costs of the other measures in the REPowerEU chapter is EUR 90 040 000. SECTION 2: FINANCIAL SUPPORT 1. Financial contribution The instalments referred to in Article 2(2) shall be organised in the following manner: First Instalment (non-repayable support): Sequential Related Measure Milestone Name Number (Reform or Investment) /Target 2.1. Green transition of Creation of a Green Transition Task Force to implement 23 Milestone enterprises and monitor the green transition 2.3.Greentechnology Establishment of a working group to plan and set up the 28 Milestone development programme development programme Signature of contractual agreement between the 37 2.6. Green Fund Milestone Ministry of Economic Affairs and Communications and SmartCap Adoption of the investment policy document by 38 2.6. Green Fund Milestone SmartCap 3.1. Creation and Setting up a data management team in the Statistical development of a centre of Office, the Ministry of Economic Affairs and 44 Milestone excellence for data Communications and the State Information System governance and open data Authority 4.4. Boosting the green Government decision on investments needed to alleviate 70 transition in the energy Milestone the defence related height restrictions on wind parks economy Adoption of the decision of the Government on the 4.4. Boosting the green initiation of the preparation process of the National 71 transition in the energy Milestone Development Plan of the Energy Sector, the designation economy of those responsible and deadlines 4.5. Programme to increase the Signature of network investment co-financing contract 74 capacity of the electricity Milestone with transmission system operator transmission network 5.1. Safe, green, competitive, needs-based and sustainable Adoption of the Transport and Mobility Development 81 Milestone transport and energy Plan 2021-2035 by the Government infrastructure 5.4. Construction of the 89 Milestone Completion of the tramway construction project design Tallinn Old Port tram line Entry into force of the Decree of the Government, 6.3. Strengthening primary which amends the list of health care services of the 106 Milestone health care Estonian Health Insurance Fund on access to specialised medical care 6468/26 ADD 1 64 ANNEX ECOFIN 1A EN Sequential Related Measure Milestone Name Number (Reform or Investment) /Target Entry into force of amendments to the Decree of the 6.3. Strengthening primary Government which amends the list of health care 107 Milestone health care services of the Estonian Health Insurance Fund on costs and services of general practitioners 6.6. Providing labour market Entry into force of the Decree of the Minister of Health 113 measures to reduce youth Milestone and Labour to strengthen the“MyFirst Job” scheme unemployment Entry into force of the Government Regulation on the 124 Audit and Control Milestone legal framework for the implementation and monitoring of the recovery and resilience plan of Estonia. Instalment EUR 142 977 720 Amount Second Instalment (non-repayable support): Sequential Related Measure (Reform Milestone Name Number or Investment) /Target 1.1. Digital transformation in Call for proposals with award criteria and award 1 Milestone enterprises conditions 1.4. Skills reform for the Entry into force of secondary legislation setting out the 11 digital transformation of Milestone terms of support for the development of digital skills businesses 1.5 Supporting the competitiveness of 16 Milestone Preparation of the development of strategies enterprises in foreign markets 1.5 Supporting the competitiveness of Preparatory analysis to define the content and the 19 Milestone enterprises in foreign locations of business centres markets 1.5 Supporting the competitiveness of Setting-up of impact groups and selection of 21 Milestone enterprises in foreign destinations for global digital missions markets 2.2. Green skills to support Entry into force of secondary legislation setting out the 25 the green transition of Milestone terms of support for the development of green skills enterprises 2.4. Modernisation of the Entry into force of the ministerial decree setting out the 32 business models in Milestone terms and conditions of grant eligibility manufacturing companies 2.5. Resource efficient green 34 Milestone Publication of call for proposals for grants technologies 3.4. #Bürokratt programme Access to digital public services through the virtual 51 Target (national virtual assistant) assistant platform 3.5. Reconfiguration of basic digital services and safe Development of centrally delivered/shared IT base 54 Milestone transition to cloud services infrastructure 4.2. Support for the Publication of calls for applications for residential 65 renovation of multi- Milestone apartment buildings renovation grants apartment buildings 4.3. Support for the 68 renovation of small Milestone Published calls for renovation grant residential buildings 5.4. Construction of the 90 Milestone Award of works contract Tallinn Old Port tram line 6468/26 ADD 1 65 ANNEX ECOFIN 1A EN Sequential Related Measure (Reform Milestone Name Number or Investment) /Target 6.6. Providing labour market 114 measures to reduce youth Milestone Youth Guarantee Action Plan unemployment Entry into force of amendments to the Social Welfare 117 6.8. Long-term care Milestone Act Instalment EUR 142 977 720 Amount Third Instalment (non-repayable support): Sequential Related Measure (Reform Milestone / Name Number or Investment) Target 1.3. Development of digital eFTI (electronic Freight Transport Information) 7 Target waybills services platforms development 2.1. Green transition of Adoption of the Circular Economy Action Plan by the 24 Milestone enterprises Green Transition Task Force 2.7. Creating opportunities for the uptake of renewables- Entry into force of the ministerial decree setting out the 41 Milestone based green hydrogen terms and conditions for granting support technologies 3.2. Development of event Launch of personal life event services and/or pro-active 47 Target services for individuals services 3.3. Development of event Deployment of IT developments contributing to the 49 services and digital gateway Target implementation of the business event services and for entrepreneurs gateway Conclusion of the cooperation agreement stipulating 4.1. Energy efficiency conditions for cooperation between SA 63 Milestone promotion KredEx/Enterprise Estonia and county development centers 4.6. Programme to boost Publication of a call for proposals for projects boosting 76 energy production in Milestone energy production in industrial sites industrial areas 4.7. Pilot Energy Storage Publication of a call for proposals for a pilot energy 78 Milestone Programme storage programme 5.1. Safe, green, competitive, Adoption of the Implementation Plan for green needs-based and sustainable 82 Milestone sustainable public transport development of the transport and energy Transport and Mobility Development Plan 2021-2035 infrastructure 5.5. 92 Municipalities’investmen Milestone Call for proposals for grants ts in bike- and walkways 6.1. A comprehensive Approval of the Strategic Framework for addressing 95 change in the organisation of Milestone health workforce shortages health care in Estonia 6.1. A comprehensive Entry into force of the Decrees of the Minister of Health 96 change in the organisation of Milestone and Labour amending the reimbursement system for health care in Estonia doctors and pharmacists 6.2.a Construction of Signature of the contract for the construction of 99a Milestone TERVIKUM TERVIKUM 6.3. Strengthening primary Entry into force of amendments to the Health Services 108 Milestone health care Organisation Act 6.4. Renewal of the eHealth Approval of the eHealth Governance Framework and its 109 Milestone Governance implementation roadmap 6.7. Extending the duration Entry into force of the amendments to the 116 of unemployment insurance Milestone Unemployment Services and Benefits Act and the benefits Unemployment Insurance Act 118 6.8. Long-term care Milestone Action Plan on an integrated care model 6468/26 ADD 1 66 ANNEX ECOFIN 1A EN Sequential Related Measure (Reform Milestone / Name Number or Investment) Target 6.9. Reducing gender pay 122 Milestone Digital gender pay gap tool gap Instalment EUR 142 977 720 Amount Fourth Instalment (non-repayable support): Sequential Related Measure (Reform Milestone Name Number or Investment) /Target 1.1. Digital transformation in 2 Target Award of grants enterprises 1.4. Skills reform for the 12 digital transformation of Target Enrolment in training activities businesses 1.5 Supporting the competitiveness of 17 Milestone Procurement of studies enterprises in foreign markets 2.3.Greentechnology Set up of the Green Technologies Development 29 Milestone development programme Programme 2.5. Resource efficient green Number of projects awarded grants following the call for 35 Target technologies proposals 2.8 Supply security 43a Milestone Publication of the call for proposals for grants investment support 3.5. Reconfiguration of basic digital services and safe Deployment of national private cloud infrastructure by 55 Target transition to cloud public authorities infrastructure 3.5. Reconfiguration of basic digital services and safe 56 Milestone Extension of the cloud infrastructure to the data embassy transition to cloud infrastructure 5.2.a Multifunctional work 84a Milestone Contract signed for building of the vessel vessel 5.3.a Construction of the Works contracts for the construction of Rail Baltic 86a Rail Baltic viaducts and Milestone viaducts terminal Entry into force of the Decree of the Minister of Health and 6.1 A comprehensive change Labour and the amendment to the Health Services 96a in the organisation of health Milestone care in Estonia Organisations Act establishing the reimbursement system for nurses 6.1. A comprehensive 97 change in the organisation of Target Admission to nursing training health care in Estonia 6.9. Reducing gender pay Adoption of the Welfare Development Plan 2023-2030 by 121 Milestone gap the government 6.9. Reducing gender pay 123 Milestone Digital gender pay gap tool gap 8.1 Facilitating the Publication of the call for proposals to support local 125 development of renewable Milestone authorities energy sources 8.1 Facilitating the Entry into force of the amendments to the relevant laws 126 development of renewable Milestone streamlining permitting, planning and environmental energy sources impact assessment processes 6468/26 ADD 1 67 ANNEX ECOFIN 1A EN Sequential Related Measure (Reform Milestone Name Number or Investment) /Target 8.2 Programme to increase the access of renewable Signature of the co-financing agreement for electricity 129 energy production to the Milestone distribution network electricity distribution network 8.3 Increasing production Call for applications for grants to support the uptake of 131 and uptake of sustainable Milestone biomethane biogas and biomethane Instalment EUR 142 977 720 Amount Fifth Instalment (non-repayable support): Sequential Related Measure (Reform Milestone Name Number or Investment) /Target 1.2. Development of e- Adoption of international standards and best practices for 4 Milestone construction the use of digital technologies in construction 1.2 Development of e- 6 Target Projects for digital construction tools construction 1.4. Skills reform for the Number of curriculums of training registered and 14 digital transformation of Target qualification standards for ICT specialists registered businesses Completion of the investment by the Ministry of 39a 2.6 Green Fund Milestone Economic Affairs and Communication 2.7 Creating opportunities for the uptake of renewables- Grant agreements signed for projects in renewables-based 43 Target based green hydrogen green hydrogen technologies technologies 2.8 Supply security 43c Target Confirmations from authorities accepting the final reports investment support 3.1 Creation and development of a centre of excellence for 46 Target Publication of datasets data governance and open data 3.3 Development of event 50 services and digital gateway Target IT developments online for entrepreneurs 3.5. Reconfiguration of basic digital services and safe 58 Target Security testing by the Information System Authority transition to cloud infrastructure 3.6. The strategic analysis of 59 money laundering and Milestone Entry into force of legal act(s) terrorist financing in Estonia 4.4. Boosting the green 72 transition in the energy Milestone Entry into force of legal acts economy 4.8 Boosting offshore wind Contractors for the radar and passive radar system/sensors 80a Milestone farms development selected and contracts signed 5.4 Construction of the 91 Milestone New tramway line Tallinn Old Port tram line 5.5. 93 Municipalities’investmen Target Construction works on bike- and walkways delivered ts in bike- and walkways 6.1. A comprehensive change Entry into force of the Government Order on the Hospital 94 in the organisation of health Milestone network development roadmap care in Estonia 6468/26 ADD 1 68 ANNEX ECOFIN 1A EN Sequential Related Measure (Reform Milestone Name Number or Investment) /Target 6.2.a Construction of 100a Milestone TERVIKUM constructed TERVIKUM 6.6 Providing labour market Number of young people enrolled in labour market related 115 measures to reduce youth Target measures unemployment Entry into force of the legislative amendments of the 120 6.8. Long-term care Milestone support system for children with higher care needs 8.1 Facilitating the Governmental decision establishing priority development 127 development of renewable Milestone areas for wind energy energy sources 8.1 Facilitating the 128 development of renewable Target Support to local authorities energy sources 8.3 Increasing production and Action plan for the production and use of biogas and 133 uptake of sustainable biogas Milestone biomethane and biomethane Instalment EUR 190 636 960 Amount Sixth Instalment (non-repayable support): Sequential Related Measure Milestone Name Number (Reform or Investment) /Target 1.1. Digital transformation in 3 Target Award of grants enterprises 1.3. Development of digital 9 Target Confirmations from authorities accepting the final reports waybills services 1.4 Skills reform for the 13 digital transformation of Target Participation in training activities businesses 1.5 Supporting the 18 competitiveness of Target Strategies published and missions carried out enterprises in foreign markets 1.5 Supporting the 20 competitiveness of Target Number of business centres opened enterprises in foreign markets 2.2 Green skills to support 27 the green transition of Target Training certificates issued enterprises 2.3 Green technologies Number of clusters and startups supported through the 31 Target development programme Green Technology Development Programme 2.4. Modernisation of the 33 business models in Target Number of projects supported manufacturing companies 2.5 Resource efficient green 36 Target Confirmations from authorities accepting the final reports technologies Legal financing agreements signed with equity/venture 40a 2.6 Green Fund Target capital funds 3.2 Development of event 48 Target Online personal life event services services for individuals 3.4. #Bürokratt programme 52 Target Bürokratt virtual assistant on public authorities’ websites (national virtual assistant) 3.7 Information system for strategic analysis of money 60 Milestone ICT system for strategic analysis laundering and terrorist financing 6468/26 ADD 1 69 ANNEX ECOFIN 1A EN Sequential Related Measure Milestone Name Number (Reform or Investment) /Target 3.8. Construction of very Number of very high capacity broadband network projects 62 high capacity broadband Target confirmed networks 4.2 Support for the Multi-apartment buildings with improved energy 66 renovation of multi- Target performance apartment buildings 4.3 Support for the Small residential buildings with improved energy 69a renovation of small Target performance residential buildings 4.4. Boosting the green Adoption of the National Development Plan of the Energy 73 transition in the energy Milestone Sector by the Government economy 4.5 Programme to increase the 75 capacity of the electricity Target Additional grid capacity transmission network 4.6 Programme to boost Additional connection capacity for renewable electricity 77 energy production in Target production industrial areas 4.7 Pilot Energy Storage Additional heat and electricity storage capacity resulting 80 Target Programme from investment support Removal of the height restriction on offshore wind 4.8 Boosting offshore wind 80c Milestone turbines in the Gulf of Riga and Estonian islands Hiiumaa, farms development Saaremaa, Vormsi 5.2.a Multifunctional work 85a Milestone Multifunctional work vessel built vessel 5.3.a Construction of the Rail Viaducts constructed and disbursement made for 87a Milestone Baltic viaducts and terminal construction work of terminal 5.3.b Renovation of a section 88b of the railway from Rapla to Milestone Renovation of railway section Lelle Entry into force of the Ministerial Regulation amending the 6.1 A comprehensive change agreement between the Ministry of Social Affairs and the 98 in the organisation of health Milestone care in Estonia University of Tartu on the shortage of doctors in certain specialisations 8.2 Programme to increase the access of renewable 130 energy production to the Target Additional 160 MW capacity available electricity distribution network 8.3 Increasing production and 134 uptake of sustainable biogas Target Installation of new biomethane production capacity and biomethane Instalment EUR 190 636 960 Amount 6468/26 ADD 1 70 ANNEX ECOFIN 1A EN SECTION 3: ADDITIONAL ARRANGEMENTS 1. Arrangements for monitoring and implementation of the recovery and resilience plan The monitoring and implementation of the Estonian recovery and resilience plan shall take place in accordance with the following arrangements: The Ministry of Finance as the lead ministry and the State Shared Service Center shall ensure overall coordination, monitoring and implementation of the recovery and resilience plan. The State Shared Service Center shall perform the functions of the managing authority. The State Budget Department in the Ministry of Finance in cooperation with the State Shared Service Center shall carry out the tasks related to monitoring and evaluation. Sectoral ministries and agencies shall perform the responsibilities assigned to them, related to the implementation of the plan. Their services shall also support the monitoring of the progress of the projects under their competency and maintain close cooperation with the State Shared Service Center and the Ministry of Finance. To this end, the existing Structural Funds Operating System (SFOS) shall be used to record all the data related to implementation and monitoring of the plan. The Financial Control Department of the Ministry of Finance, the audit authority, shall carry out regular audits of the management and control systems put in place. It shall also prepare a summary of the audits carried out for requests for payments. The Audit Authority shall also host the Anti- Fraud Co-ordinating Service. All national and external sources shall be budgeted together in sector-specific programmes allowing transparent monitoring of sectoral funding and allowing the identification of risks and prevention of double funding. 2. Arrangements for providing full access by the Commission to the underlying data The State Shared Service Center as the managing authority shall hold the responsibility for submitting requests for payment to the European Commission and for drawing up the management declaration by which it certifies that the funds have been used for their intended purpose, that the information is complete, accurate and reliable and that the control system provides the necessary assurance. In addition, monitoring and evaluation shall also be ensured by the Ministry of Finance in cooperation with the State Shared Service Center. Data related to the implementation and monitoring of the plan shall be stored in the existing integrated information system, the Structural Funds Operating System (SFOS). The SFOS is adapted to the requirements under Regulation (EU) 2021/241 for data collection, progress reports and requests for payment, including to collect indicators and other information necessary to demonstrate and report the achievement of milestones and targets. The SFOS shall be used by all actors involved in the implementation of the plan. The information in the SFOS shall continuously be updated on the progress and results of the plan including deficiencies identified and all corrective actions taken. 6468/26 ADD 1 71 ANNEX ECOFIN 1A EN In accordance with Article 24(2) of Regulation (EU) 2021/241, upon completion of the relevant agreed milestones and targets in Section 2.1 of this Annex, Estonia shall submit to the Commission a duly justified request for payment of the financial contribution. Estonia shall ensure that, upon request, the Commission has full access to the underlying relevant data that supports the due justification of the request for payment, both for the assessment of the request for payment in accordance with Article 24(3) of Regulation (EU) 2021/241 and for audit and control purposes. 6468/26 ADD 1 72 ANNEX ECOFIN 1A EN
Allikas: Rahandusministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel