ADDENDUM TO THE RECOVERY AND RESILIENCE PLAN
Contents
PART 1: INTRODUCTION TO THE ADDENDUM ........................................................................................ 2
1. General objective ........................................................................................................................ 2
2. Justification for the addendum ................................................................................................... 2
PART 2: DESCRIPTION OF ADDITIONAL AND MODIFIED REFORMS AND INVESTMENTS........................ 2
Name of the modified component ......................................................................................................... 2
PART 3: COMPLEMENTARITY AND IMPLEMENTATION OF THE PLAN .................................................... 4
1. Consistency with other initiatives ............................................................................................... 5
2. Complementarity of funding....................................................................................................... 5
3. Effective implementation ........................................................................................................... 5
4. Consultation process of stakeholders ......................................................................................... 5
5. Control and audit ........................................................................................................................ 5
6. Communication ........................................................................................................................... 5
PART 4: OVERALL COHERENCE AND IMPACT OF THE PLAN ................................................................... 5
1. Coherence: .................................................................................................................................. 5
2. Gender equality and equal opportunities for all: ....................................................................... 5
3. Strengthening economic, social and institutional resilience: ..................................................... 5
4. Comparison with the investment baseline: ................................................................................ 5
EN 1 EN
PART 1: INTRODUCTION TO THE ADDENDUM
1. General objective
Following the latest amendment of the Estonian RRP, the reforms and investments
implemented by the Estonia continue to be affected by the rapid pace of technological change,
including the widespread adoption of new tools such as artificial intelligence, which has
rendered parts of the training content outdated. Furthermore, the needs and expectations of
participants have evolved significantly, with a stronger preference for more flexible, tailored,
and practical learning formats. As a result, participation interest in the existing training
programmes has declined, limiting their intended impact and necessitating minor revisions.
2. Justification for the addendum
Article [21]: an amendment or submission of a new plan due to the plan, including relevant
milestones and targets, being no longer achievable because of objective circumstances.
PART 2: DESCRIPTION OF ADDITIONAL AND MODIFIED
REFORMS AND INVESTMENTS
Name of the modified component
Investment/ reform CID Reform 1.4
reference
Investment/ reform name Skills reform for the digital transformation of
businesses
Type of change compared to modified
CID
Legal base of the change ☐ Article 14(2) – loan request
(select at least one) ☐ Article 18(2) – update of the maximum financial
contribution
☒ Article 21 – amendment due to objective circumstances
☐ [Article 21a – REPowerEU resources]
☐ [Article 21b – new transfers]
☐ None of the above, correction of clerical error
Elements modified (only for ☐ Component / Measure description
modified measures) ☒Milestones and targets
☐ Estimated cost
☐ Green and digital tagging
☐ DNSH self-assessment
EN 2 EN
Description and justification of the change
Within the RRF reform - Skills reform for the digital transformation of businesses measure,
it has become evident that the participation in training activities target is currently not
achievable.
Compared to the period when the measure was originally designed, significant changes have
occurred in both the economic environment and the ICT sector.
The economic backdrop of 2023–2024 has been exceptionally challenging, leading
companies to prioritise short-term operational continuity over staff development. Many
firms, particularly in manufacturing and industry, responded by cutting jobs or freezing
hiring; for example, manufacturing employment declined by approximately 6% from its
2022 peak by early 2024. Under these conditions, SMEs and larger employers alike have
limited capacity to release employees for lengthy training programmes, even when the
training itself is provided free of charge. Lowering the participation target therefore reflects
a temporary but material absorption constraint and aligns expectations with what companies
can realistically support under current economic stress.
At the same time, developments in the ICT sector have diverged from earlier forecasts.
According to OSKA ICT sector monitoring, the previously projected growth in demand for
ICT specialists has not materialised to the expected extent, and demand has instead
stabilised. This has reduced both individual and employer-driven interest in further training
and large-scale retraining programmes.
In practice, participation rates in the training programmes have remained below the procured
training volume, pointing to saturation in the training market.
Similar training opportunities targeting the same audience are currently offered in Estonia
through multiple funding sources and measures (ESF/ERDF, Recovery and Resilience
Facility, and Just Transition Fund measures), which further limits effective uptake.
The rapid emergence and diffusion of AI has also influenced employer behaviour. While this
has been flexibly considered during project implementation, many companies have begun
adopting AI solutions based on their own company-specific needs. As a result, employers
increasingly prefer their employees to participate in internal company-specific AI training
and development activities tailored to their specific business context over external,
standardised training programmes.
Finally, completion rates in ICT training have been highly variable, with dropout rates
ranging from 3% to 37%. The reasons for discontinuation vary: the ICT field is demanding,
and participants have often underestimated the level of commitment required for long-term
retraining programmes. These trainings were intentionally designed to include intensive and
in-depth learning pathways, reflecting the programme’s focus on meaningful and sustainable
skill transitions into specialist roles rather than maximising completion figures alone.
Maintaining a clear quality threshold with regard to training scope, duration and completion
therefore remains essential, and a reduced participation target supports this objective.
Due to the reasons outlined above, we propose as a solution to reduce the target goal from
2000 to 1818.
Modified elements Current version Amended version
Component and / or - -
measure
description
EN 3 EN
Milestones and T13 T13
targets Name: The participation in Name: The participation in
training activities training activities
Quantitative indicator for Quantitative indicator for T13:
T13: Training certificates Number of confirmed
Goal: participations
2000 Goal:
Description of T13: 1818
Number of certificates of Description of T13:
graduation or certificates of Number of confirmed participations
participation issued for in training activities supported
training activities supported under this measure.
under this measure capacity.
Estimated cost - -
Green and digital - -
tagging
DNSH self- - -
assessment )
CID reference for the affected Component 1 (investment 1.5); Component 2 (investment 2.2;
Measures 2.3); Component 3 (reform 3.6); Component 6 (reform 6.1)
Legal base of the change (select at Article 14(2) – loan request
least one) ☐ Article 18(2) – update of the maximum financial contribution
☒ Article 21 – amendment due to objective circumstances
☐ Article 21a – REPowerEU non-repayable financial support (ETS
revenue)
☐ Article 21b (2) – BAR transfers
☒ None of the above, correction of clerical error
Elements modified (only for ☐ Component / Measure description
modified measures) ☒Milestones and targets
☐ Estimated cost
☐ Green and digital tagging (potentially relevant, because there is a
substantive change to the underlying measure)
☐ DNSH self-assessment
PART 3: COMPLEMENTARITY AND IMPLEMENTATION OF THE
PLAN
EN 4 EN
1. Consistency with other initiatives
2. Complementarity of funding
3. Effective implementation
4. Consultation process of stakeholders
5. Control and audit
6. Communication
The previous indications remain unchanged.
PART 4: OVERALL COHERENCE AND IMPACT OF THE PLAN
1. Coherence:
2. Gender equality and equal opportunities for all:
3. Strengthening economic, social and institutional resilience:
4. Comparison with the investment baseline:
The previous indications remain unchanged.
EN 5 EN
Lisa 2 Taaste- ja vastupidavuskava alusel laekuva toetuse riigisisene väljamaksete kord
Siseriiklik
R/ M/
# Meetme nimi # Eesmärk/ siht Q a hind (al.
I T
28.05.26)*
MKM 1.1 Investeering I M 1 Projektikonkursi Q2 2022 11 600 000
arengusihtide ettevalmistamine
saavutamisse koos
hindamiskriteeriu
mide ja toetuse
andmise
tingimustega
MKM 1.1 Investeering T 2 Toetuste Q4 2023 23 200 000
arengusihtide määramine
saavutamisse
MKM 1.1 Investeering T 3 Toetuste Q4 2025 23 200 000
arengusihtide määramine
saavutamisse
KLIM 1.2 E-ehituse I M 4 Ehituse andmete Q4 2024 2 250 000
arendamine klassifitseerimiss
üsteemi
juurutamine
KLIM 1.2 E-ehituse M 5 Avalike teenuste Q4 2025 0
arendamine kättesaadavus e-
ehituse
platvormil
KLIM 1.2 E-ehituse T 6 Digitaalse Q4 2025 6 750 000
arendamine ehitustarkvara
projektid
MKM 1.3 E-veoselehe I T 7 Elektroonilise Q2 2023 1 500 000
teenuse kaubaveoteabe
arendamine (eFTI)
platvormide
arendamine
MKM 1.3 E-veoselehe T 8 E-veoselehe Q4 2024 0
teenuse (eCMR) liidese
arendamine arendustööd
MKM 1.3 E-veoselehe T 9 Lõpparuannete Q2 2026 4 500 000
teenuse vastuvõtmist
arendamine kinnitanud
asutuste arv
MKM 1.3 E-veoselehe M 10 E-veoselehtede Q2 2026 0
teenuse väljatöötamise ja
arendamine kasutuselevõtu
järelhindamine
HTM 1.4 Oskuste reform R M 11 Digioskuste Q2 2022 2 000 000
ettevõtete arendamise
digipöördeks toetamise
tingimusi
sisaldavate
teiseste
õigusaktide
jõustumine
HTM 1.4 Oskuste reform T 12 Koolitustele Q4 2023 2 000 000
ettevõtete registreerumine
digipöördeks
HTM 1.4 Oskuste reform T 13 Osavõtt Q2 2026 2 000 000
ettevõtete koolitustest
digipöördeks
HTM 1.4 Oskuste reform T 14 Registreeritud Q4 2024 4 000 000
ettevõtete IKT-
digipöördeks spetsialistide
koolitusprogram
mide ja
kvalifikatsioonist
andardite arv
HTM 1.4 Oskuste reform T 15 IKT- Q4 2024 0
ettevõtete spetsialistide
digipöördeks kvalifikatsioonist
a
ndardite
läbivaatamine
VÄM 1.5 Ettevõtete R M 16 Strateegiate Q2 2022 3 500 000
.1 konkurentsivõime väljatöötamise
toetamine ettevalmistamine
välisturgudel-
katusreform
VÄM 1.5 Ettevõtete M 17 Uuringute Q2 2024 3 500 000
.1 konkurentsivõime tellimine
toetamine
välisturgudel-
katusreform
VÄM 1.5 Ettevõtete T 18 Riigi- ja Q2 2026 11 085 000
.1 konkurentsivõime regioonipõhiste
toetamine ekspordistrateegi
välisturgudel- ate arv
katusreform
VÄM 1.5 Ettevõtete R M 19 Ettevalmistav Q2 2022 5 500 000
.2 konkurentsivõime analüüs
toetamine ettevõtluskeskust
välisturgudel- e sisustuse ja
katusreform asukoha
kindlaksmäärami
seks
VÄM 1.5 Ettevõtete T 20 Avatud Q2 2026 5 500 000
.2 konkurentsivõime ettevõtluskeskust
toetamine e arv
välisturgudel-
katusreform
VÄM 1.5 Ettevõtete R M 21 Löögirühmade Q2 2022 4 085 000
.3 konkurentsivõime loomine ja
toetamine sihtkohtade
välisturgudel- valimine
katusreform ülemaailmsete
digilähetuste
jaoks
VÄM 1.5 Ettevõtete T 22 Globaalsete Q2 2026 0
.3 konkurentsivõime löögirühmade
toetamine lähetuste arv ja
välisturgudel- nende
katusreform suurürituste arv,
kus Eesti on
virtuaallavade
kaudu esindatud
*meetme lõpptulemuse eest tehtava toetuse väljamakse suuruseks on reformi/investeeringu eelarve
piires 31.08.2026 seisuga tekkinud seni laekumata nõuete maht.
KLIM 2.1 Ettevõtete R M 23 Rakkerühma ja Q4 2021 0
rohepööre töörühmade
loomine
KLIM 2.1 Ettevõtete R M 24 Ringmajanduse Q4 2022 0
rohepööre tegevuskava
vastuvõtmine
rohepöörde
rakkerühmas
HTM 2.2 Roheoskused I M 25 Teiseste Q2 2022 3 000 000
ettevõtete õigusaktide
rohepöörde jõustumine
toetamiseks
HTM 2.2 Roheoskused T 26 Oskuste Q4 2024 0
ettevõtete täiendamise ja
rohepöörde ümberõppemood
toetamiseks ulite arv
HTM 2.2 Roheoskused T 27 Koolitustunnistus Q2 2026 12 000 000
ettevõtete ed
rohepöörde
toetamiseks
KLIM 2.3 Rohetehnoloogiate I M 28 Arendusprogram Q4 2021 2 095 000
arendusprogrammi mi kavandamise
d ja koostamise
töörühma
moodustamine
KLIM 2.3 Rohetehnoloogiate M 29 Rohetehnoloogia Q2 2024 2 095 000
arendusprogrammi te
d arendusprogram
mi
käivitamine
KLIM 2.3 Rohetehnoloogiate T 30 Rohetehnoloogia Q2 2026 0
arendusprogrammi te
d arendusprogram
mi
kaudu toetatavate
klastrite arv
KLIM 2.3 Rohetehnoloogiate T 31 Rohetehnoloogia Q2 2026 4 190 000
arendusprogrammi arendusprogram
d mi raames
toetatud klastrite
ja idufirmade arv
MKM 2.4 Tootmisettevõtete I M 32 Toetuse andmise Q2 2022 1 800 000
ärimudeli tingimusi
muutused sätestava ministri
käskkirja
jõustumine
MKM 2.4 Tootmisettevõtete T 33 Lõpparuannete Q2 2026 7 200 000
ärimudeli vastuvõtmist
muutused kinnitanud
asutuste arv
KLIM 2.5 Tööstusettevõtete I 34 34 Konkursikutse Q2 2022 4 800 000
ressursitõhusate avaldamine
rohetehnoloogiate
edendamine
REM 2.5 Bioressurside I M 34 Konkursikutse Q2 2022 5 760 000
väärindamine avaldamine
KLIM 2.5 Tööstusettevõtete T 35 Projektikonkursi Q4 2023 9 600 000
ressursitõhusate tulemusel
rohetehnoloogiate sõlmitud
edendamine lepingute arv
REM 2.5 Bioressurside T 35 Projektikonkursi Q4 2023 11 520 000
väärindamine tulemusel
sõlmitud
lepingute arv
KLIM 2.5 Tööstusettevõtete T 36 Lõpparuannete Q2 2026 9 600 000
ressursitõhusate vastuvõtmist
rohetehnoloogiate kinnitanud
edendamine asutuste arv
REM 2.5 Bioressurside T 36 Projektide arv Q2 2026 6 520 000
väärindamine
MKM 2.6 Rohefond I M 37 MKM ning Q4 2021 100 000 000
SmartCapi
vahelise lepingu
allakirjutamine
MKM 2.6 Rohefond M 38 Investeerimispoli Q4 2021 x
itika dokumendi
vastuvõtmine
SmartCapi poolt
MKM 2.6 Rohefond T 39a Investeeringu Q3 2025 x
elluviimine
Majandus- ja
Kommunikatsioo
niministeeriumi
poolt
MKM 2.6 Rohefond T 40a Õiguslikud Q2 2026 x
finantseerimislep
ingud, mis on
sõlmitud
omakapitali-
/riskikapitalifond
idega
KLIM 2.7 Vesiniku I M 41 Toetuse andmise Q4 2022 12 500 000
terviktehnoloogiat tingimusi
e kasutuselevõtu sätestava
edendamine ministri käskkirja
jõustumine
KLIM 2.7 Vesiniku M 42 Tehnoloogiad ja Q3 2025 0
terviktehnoloogiat seadmed
e kasutuselevõtu terviklike
edendamine rohevesiniku
väärtusahelate
loomiseks
KLIM 2.7 Vesiniku T 43 Toetuste Q2 2026 0
terviktehnoloogiat lepingud
e kasutuselevõtu allkirjastatud
edendamine projektide jaoks
vähemalt 11
miljoni euro
MKM 2.8 Varustuskindluse I M 43a toetuse andmise Q4 2023 4 000 000
investeeringute tingimuste
toetusmeede avaldamine
MKM 2.8 Varustuskindluse T 43b avatud vooru Q4 2024 0
investeeringute tulemusel toetust
toetusmeede saanud projektide
arv
MKM 2.8 Varustuskindluse T 43c Lõpparuannete Q2 2026 16 000 000
investeeringute vastuvõtmist
toetusmeede kinnitavate
asutuste arv
JDM 3.1 Andmehalduse ja R M 44 Andmehaldusme Q4 2021 3 570 000
avaandmete eskonna
oivakeskuse moodustamine
loomine ja statistikaametis,
väljaarendamine MKMis ning
Riigi
Infosüsteemi
Ametis
JDM 3.1 Andmehalduse ja T 45 Andmekvaliteedi Q2 2025 0
avaandmete parandamise
oivakeskuse projektide
loomine ja lõpuleviimine
väljaarendamine
JDM 3.1 Andmehalduse ja T 46 Andmekogude Q4 2025 8 320 000
avaandmete avaldamine
oivakeskuse
loomine ja
väljaarendamine
JDM 3.2 Eraisikutele R T 47 Eraisikute Q4 2022 2 456 000
sündmusteenuste elusündmusteenu
ja etteaimavate ste ja/või
teenuste etteaimavate
väljaarendamine teenuste
käivitamine
JDM 3.2 Eraisikutele T 48 Veebipõhised Q4 2025 9 824 000
sündmusteenuste teenused isiklike
ja etteaimavate eluürituste jaoks
teenuste
väljaarendamine
MKM 3.3 Ettevõtja R T 49 Ärisündmustel Q4 2022 2 080 000
sündmusteenuste põhinevate
ja digivärava teenuste ja
väljaarendamine digivärava
rakendamisele
kaasa aitavate
IT-arenduste
kasutuselevõtt
MKM 3.3 Ettevõtja T 50 IT arendused Q4 2025 18 720 000
sündmusteenuste veebis
ja digivärava
väljaarendamine
JDM 3.4 #Bürokrati I T 51 Juurdepääs Q2 2022 3 493 333
programm (riikliku digitaalsetele
virtuaalassistendi avalikele
platvorm ja teenustele
ökosüsteem) virtuaalassistendi
platvormi kaudu
JDM 3.4 #Bürokrati T 52 Bürokratt – Q4 2025 5 736 667
programm (riikliku virtuaalne
virtuaalassistendi assistent avaliku
platvorm ja sektori
ökosüsteem) veebisaitidel
JDM 3.4 #Bürokrati T 53 Juurdepääs Q4 2025 0
programm (riikliku digitaalsetele
virtuaalassistendi avalikele
teenustele
platvorm ja virtuaalassistendi
ökosüsteem) platvormi
kaudu
JDM 3.5 Digiriigi I M 54 Keskselt osutatud Q3 2022 10 707 500
baasteenuste / jagatud
ümberkorraldamin ITbaasteenuste
e ning turvaline väljaarendamine
pilvetaristule
üleminek
JDM 3.5 Digiriigi T 55 Riikliku Q4 2023 7 138 333
baasteenuste privaatpilvetarist
ümberkorraldamin u kasutuselevõtt
e ning turvaline avaliku sektori
pilvetaristule asutuste poolt
üleminek
JDM 3.5 Digiriigi M 56 Pilvetaristu Q4 2023 10 707 500
baasteenuste laiendamine
ümberkorraldamin andmesaatkonnal
e ning turvaline e
pilvetaristule
üleminek
JDM 3.5 Digiriigi T 57 Elutähtsate Q4 2024 0
baasteenuste süsteemide
ümberkorraldamin üleviimine
e ning turvaline pilvelahendusega
pilvetaristule andmesaatkonda
üleminek
JDM 3.5 Digiriigi T 58 Riigiasutuste Q4 2024 10 776 666
baasteenuste infosüsteemide
ümberkorraldamin keskne
e ning turvaline turvatestimine
pilvetaristule
üleminek
RM 3.6 Rahapesu ja R M 59 Õigusaktide Q4 2024 400 000
terrorismi muudatuste
rahastamise jõustumine
strateegilise
analüüsi uuele
tasemele viimine
Eestis
RM 3.7 Rahapesu ja I M 60 Strateegilise Q2 2026 3 500 000
terrorismi reaalaja analüüsi IKT-
strateegilise süsteem
analüüsi süsteem
JDM 3.8 Väga suure I T 61 Väga suure Q4 2024 0
läbilaskevõimega läbilaskevõimega
lairibavõrkude lairibavõrgu
ehitamine kasutuselevõtt
uutes kohtades
JDM 3.8 Väga suure T 62 Väga suure Q4 2025 24 290 000
läbilaskevõimega võimsusega
lairibavõrkude lairibaühenduse
ehitamine projektide
kinnitatud arv
KLIM 4.1 Energiatõhustamis R M 63 Koostöölepingu Q4 2022 0
e ja tervikliku sõlmimine, et
rekonstrueerimise sätestada SA
soodustamine Kredex /
Enterprise Eesti
ja maakondlike
arenduskeskuste
vahelise koostöö
tingimused.
KLIM 4.1 Energiatõhustamis R M 64 Kasutusele on Q4 2024 0
e ja tervikliku võetud
rekonstrueerimise digitaalsed
soodustamine vahendid,
millega
hõlbustada
juurdepääsu
rekonstrueerimist
käsitlevale
teabele,
sealhulgas
visualiseerida
rekonstrueerimis
e tulemusi ja
hinnata
rekonstrueerimis
kulusid.
KLIM 4.2 Korterelamute I M 65 Korterelamute Q2 2022 8 934 000
rekonstrueerimise rekonstrueerimist
toetamine oetuse
projektikonkurssi
de
väljakuulutamine
KLIM 4.2 Korterelamute T 66 Suurema Q2 2026 35 736 000
rekonstrueerimise energiatõhususeg
toetamine a korterelamud
KLIM 4.2 Korterelamute T 67 Kasvuhoonegaasi Q2 2026 0
rekonstrueerimise de heite
toetamine hinnanguline
vähenemine
aastas
KLIM 4.3 Väikeelamute I M 68 Renoveerimistoet Q2 2022 6 260 000
rekonstrueerimise use
toetamine projektikonkurssi
de
väljakuulutamine
KLIM 4.3 Väikeelamute T 69 Suurema Q4 2024 0
rekonstrueerimise energiatõhususeg
toetamine a väikeelamud
KLIM 4.3 Väikeelamute T 69a Suurema Q1 2026 25 040 000
rekonstrueerimise energiatõhususeg
toetamine a väikeelamud
KLIM 4.4 Energiamajanduse R M 70 Valitsuse otsus Q2 2021 0
s rohepöörde investeeringute
hoogustamine kohta, mis on
vajalikud
tuuleparkide
riigikaitseliste
kõrgusepiirangut
e tühistamiseks.
KLIM 4.4 Energiamajanduse R M 71 Valitsuse otsuse Q4 2021 0
s rohepöörde vastuvõtmine, et
hoogustamine kiita heaks
energiamajandus
e arengukava
koostamine ning
määrata kindlaks
vastutajad ja
tähtajad.
KLIM 4.4 Energiamajanduse R M 72 Õigusaktide Q4 2024 0
s rohepöörde muudatuste
hoogustamine jõustumine
KLIM 4.4 Energiamajanduse R M 73 Energiamajandus Q4 2025 0
s rohepöörde e arengukava
hoogustamine vastuvõtmine
valitsuses
KLIM 4.5 Elektrivõrgu I M 74 Võrguinvesteerin Q1 2022 7 240 000
tugevdamise gute
programm kaasrahastamise
lepingu
allkirjastamine
põhivõrguettevõt
jaga
KLIM 4.5 Elektrivõrgu T 75 Täiendav Q2 2026 28 960 000
tugevdamise taastuvenergia
programm liitumisvõimsus
KLIM 4.6 Tööstusalades I M 76 Projektikonkursi Q4 2022 1 820 000
taastuvelektri väljakuulutamine
tootmisseadmete tööstusaladel
kasutuselevõtu energiatootmise
hoogustamise hoogustamiseks
programm
KLIM 4.6 Tööstusalades T 77 Taastuvenergia Q2 2026 2 720 524
taastuvelektri tootmise jaoks on
tootmisseadmete elektrivõrgus
kasutuselevõtu loodud täiendav
hoogustamise liitumisvõimsus.
programm
KLIM 4.7 Energia salvestuse I M 78 Energiasalvestus Q4 2022 1 920 000
pilootprogramm e
pilootprogrammi
projektikonkursi
väljakuulutamine
KLIM 4.7 Energia salvestuse T 79 Täiendav soojus- Q2 2026 7 680 000
pilootprogramm ja elektrienergia
salvestusvõimsus
KLIM 4.7 Energia salvestuse T 80 Investeeringutoet Q2 2026 0
pilootprogramm usest tulenev
täiendav
elektrisalvestusv
õimsus
KAM 4.8 Avamere I M 80a Radari ja Q4 2024 13 360 000
tuuleparkide passivradari
arendamine süsteemi
pakkujad välja
valitud ja
lepingud
sõlmitud
KAM 4.8 Avamere M 80b radar ja Q1 2026 0
tuuleparkide passivradar ning
arendamine andurid on
kasutusse võetud
KAM 4.8 Avamere M 80c kõrguspiirang Q1 2026 53 440 000
tuuleparkide avamere
arendamine tuulegeneraatorit
ele Riia lahes ja
Eesti saarte
Hiiumaa,
Saaremaa ja
Vormsi
piirkonnas on
eemaldatud
KLIM 5.1 Võtame kasutusele R M 81 Transpordi ja Q1 2022 0
ohutu, liikuvuse
keskkonnahoidliku arengukava
, (2021–2035)
konkurentsivõimel vastuvõtmine
ise, vajaduspõhise valitsuses
ja jätkusuutliku
transpordi- ja
energiataristu
KLIM 5.1 Võtame kasutusele R M 82 Transpordi ja Q4 2022 0
ohutu, liikuvuse
keskkonnahoidliku arengukava
, (2021–2035)
konkurentsivõimel keskkonnasõbrali
ise, vajaduspõhise ku ja säästliku
ja jätkusuutliku transpordi
transpordi- ja arendamise
energiataristu rakendusplaani
vastuvõtmine
KLIM 5.1 Võtame kasutusele R M 83 Transpordi ja Q2 2026 0
ohutu, liikuvuse
keskkonnahoidliku arengukava
, (2021–2035)
konkurentsivõimel rakendamine
ise, vajaduspõhise
ja jätkusuutliku
transpordi- ja
energiataristu
KLIM 5.2 Multifunktsinaalne I M 84a leping töölaeva Q1 2024 3 600 000
.a töölaev ehitamiseks
allkirjastatud
KLIM 5.2 Multifunktsinaalne T 85a töölaev üle antud Q2 2026 18 959 476
.a töölaev
KLIM 5.3 Rail Baltic I T 86a Rail Balticu Q3 2023 6 210 000
.a viaduktid ja viaduktide
Ülemiste terminali esitamiseks
osalised ehitustööd vajalikud
lepingud on
sõlmitud
KLIM 5.3 Rail Baltic T 87a viaduktid on Q1 2026 32 819 987
.a viaduktid ja valminud
Ülemiste terminali
osalised ehitustööd
KLIM 5.3 Rapla-Lelle I M 88 b Tööde Q1 2026 29 570 103
b raudteelõigu üleandmis-
ümberehitus vastuvõtu aktid –
renoveeritud on
vähemalt 23km
KLIM 5.4 Tallinna I M 89 Trammiteede Q4 2021 7 300 000
Vanasadama ehitusprojekti
trammiliini lõpuleviimine
rajamine
KLIM 5.4 Tallinna M 90 Ehituslepingu Q2 2022 7 300 000
Vanasadama sõlmimine
trammiliini
rajamine
KLIM 5.4 Tallinna T 91 Uus trammiliin Q4 2025 21 900 000
Vanasadama
trammiliini
rajamine
REM 5.5 KOVide I M 92 Konkurss toetuse Q4 2022 1 000 000
investeeringud saamiseks
jalgratta- ja/või
jalgteedesse
REM 5.5 KOVide T 93 Valminud Q4 2025 4 000 000
investeeringud jalgratta- ja
jalgratta- ja/või jalgteede
jalgteedesse projektid
SOM 6.1 Eesti R M 94 Haiglavõrgu Q4 2024 0
tervishoiukorraldu arengukava
se terviklik käsitleva
muutmine valitsuse määruse
jõustumine
SOM 6.1 Eesti R M 95 Tervishoiutöötaja Q4 2022 0
tervishoiukorraldu te nappuse
se terviklik leevendamise
muutmine strateegilise
raamistiku
heakskiitmine
SOM 6.1 Eesti R M 96 Tervishoiuteenus Q1 2023 0
tervishoiukorraldu te korraldamise
se terviklik seadust käsitleva
muutmine tervise- ja
tööministri
käskkirja
jõustumine, et
parandada arstide
ja proviisorite
kulude
hüvitamise
süsteemi.
SOM 6.1 Eesti R M 96a Tervishoiuteenus Q2 2024 0
tervishoiukorraldu te korraldamise
se terviklik seadust käsitleva
muutmine tervise- ja
tööministri
käskkirja
jõustumine, et
parandada õdede
kulude
hüvitamise
süsteemi.
SOM 6.1 Eesti R T 97 Vastuvõtt Q4 2023 0
tervishoiukorraldu õenduse erialale
se terviklik
muutmine
SOM 6.1 Eesti R M 98 Jõustub ministri Q2 2026 0
tervishoiukorraldu määrus, millega
se terviklik muudetakse
muutmine sotsiaalministeeri
umi ja Tartu
Ülikooli vahelist
lepingut arstide
nappuse kohta
teatavatel
erialadel.
SOM 6.2 TERVIKUMI I M 99a TERVIKUMI Q2 2023 25 200 000
.a rajamine ehitamiseks
hankeleping
sõlmitud
SOM 6.2 TERVIKUMI M 100 TERVIKUM Q4 2025 46 800 000
.a rajamine a valminud
SOM 6.3 Tervishoiu R M 106 Eesti haigekassa Q3 2020 0
esmatasandi tervishoiuteenust
tugevdamine e
loetelu
eriarstiabile
juurdepääsu osa
muutva valitsuse
akti jõustumine.
SOM 6.3 Tervishoiu R M 107 Jõustuvad Q1 2021 0
esmatasandi valitsuse akti
tugevdamine muudatused,
millega
muudetakse Eesti
haigekassa
tervishoiuteenust
e loetelu
perearstide
kulusid ja -
teenuseid
käsitlevat osa.
SOM 6.3 Tervishoiu R M 108 Tervishoiuteenus Q1 2023 0
esmatasandi te korraldamise
tugevdamine seaduse
muudatuste
jõustumine
SOM 6.4 E-tervise R M 109 E-tervise Q2 2023 0
valitsemisraamisti valitsemisraamist
ku uuendamine iku ja selle
rakenduskava
heakskiitmine
MKM 6.6 Noorte tööpuudust I M 113 Meedet „Minu Q1 2022 2 000 000
vähendavate esimene töökoht“
tööturumeetmete tugevdava
pakkumine terviseja
tööministri
käskkirja
jõustumine.
MKM 6.6 Noorte tööpuudust M 114 Noortegarantii Q2 2022 2 000 000
vähendavate tegevuskava
tööturumeetmete
pakkumine
MKM 6.6 Noorte tööpuudust T 115 Tööjõuturuga Q4 2025 6 000 000
vähendavate seotud
tööturumeetmete meetmetes
pakkumine registreeritud
noorte arv
MKM 6.7 Töötuskindlustush R M 116 Tööturuteenuste Q2 2023 0
üvitiste ja -toetuste
pikendamine seaduse ning
töötuskindlustuse
seaduse
muudatuste
jõustumine
SOM 6.8 Pikaajaline R M 117 Sotsiaalhoolekan Q2 2022 0
hooldus de seaduse
muudatuste
jõustumine
SOM 6.8 Pikaajaline R M 118 Integreeritud Q4 2022 0
hooldus sotsiaal- ja
tervishoiuteenust
e osutamise
tegevuskava
SOM 6.8 Pikaajaline R M 119 Sotsiaalkaitsemin Q4 2024 0
hooldus istri käskkirja
jõustumine
SOM 6.8 Pikaajaline R M 120 Suure Q1 2025 0
hooldus hooldusvajaduse
ga laste
toetussüsteemi
parandamist
käsitlevate
seadusemuudatus
te jõustumine
MKM 6.9 Soolise palgalõhe R M 121 Heaolu Q1 2024 0
vähendamine arengukava
(2023–2030)
vastuvõtmine
valitsuses
MKM 6.9 Soolise palgalõhe R M 122 Digitaalne Q4 2022 0
vähendamine soolise palgalõhe
töövahend
MKM 6.9 Soolise palgalõhe R M 123 Digitaalne Q1 2024 0
vähendamine soolise palgalõhe
töövahend
RM 7.1 Taastekava R M 124 Jõustub valitsuse Q4 2021 0
juhtimis- ja määrus, millega
kontrollisüsteemi on kehtestatud
kehtestamine õigusraamistik
Eesti taaste- ja
vastupidavuskav
a rakendamiseks
ja järelevalveks.
REM 8.1 Taastuvenergia R M 125 avatud vooru Q3 2023 2 000 000
arendamise avamine
kiirendamine kohalikele
omavalitsustele
KLIM 8.1 Taastuvenergia R M 126 lubade Q2 2024 13 419 323
arendamise väljastamise,
kiirendamine planeerimise ja
keskkonnamõjud
e hindamisega
seotud protsesse
puudutavate
seadusemuudatus
te jõustamine
KLIM 8.1 Taastuvenergia M 127 tuuleenergia Q3 2024 13 419 323
arendamise arendamiseks
kiirendamine sobivate
eelisarendusalade
kehtestamine
valitsuse
otsusega
KLIM 8.2 Taastuvenergia I M 129 Elektrijaotusvõrg Q1 2024 7 600 000
tootmise võrku u tööde
integreerimise rahastamisleping
võimekus u allkirjastamine
KLIM 8.2 Taastuvenergia T 130 Täiendav 160 Q1 2026 30 400 000
tootmise võrku MW võrgumahtu
integreerimise saadaval
võimekus
KLIM 8.3 Biogaasi ja I M 132 Uuringu Q4 2024 0
biometaani läbiviimine, mis
tootmise ja tuvastab
kasutamise vajalikud
suurendamine regulatiivsed,
organisatsioonilis
ed ja rahalised
sekkumised
KLIM 8.3 Biogaasi ja M 133 Biogaasi ja Q2 2025 200 000
biometaani biometaani
tootmise ja tootmise ja
kasutamise kasutuselevõtu
suurendamine tegevuskava
koostamine
REM 8.3 Biogaasi ja I T 134 Täiendava Q2 2026 16 000 000
biometaani biometaani
tootmise ja tootmisvõimsuse
kasutamise loomine
suurendamine
Riigikantselei
[email protected] */ Meie 25.05.2026 nr 1.1-10.1/2254-1
„Taaste- ja vastupidavuskava lisa“
ja toetuse riigisisese väljamaksete
korra kinnitamine
Austatud härra riigisekretär
Esitame Vabariigi Valitsuse istungile eelnõu „„Taaste- ja vastupidavuskava lisa“ ja toetuse
riigisisese väljamaksete korra kinnitamine“.
Taastekava koostati esmakordselt 2021.a. sügisel, kui lepiti Euroopa Komisjoniga kokku
reformid ja investeeringud koos siduvate eesmärkide ja ajakavaga RRF toetuse kasutamiseks.
2023.a. alguses tehti seoses rahastu mahu vähendamise ja REPowerEU toetuse lisandumisega
kavale muudatuste lisa, mis kiideti Euroopa Liidu Nõukogu poolt heaks mais 2023.a. 2025.a.
sügisel ning 2026.a. algul muudeti Taastekava seoses muutunud olude – sõja, inflatsiooni ja
majanduslanguse – mõjuga ning Euroopa Komisjoni 2025. a juunis antud lihtsustamisjuhiste
rakendamiseks. Kuna Taastekava elluviimise ja tulemuste Euroopa Komisjonile
raporteerimise lõpptähtaeg on august 2026.a., siis on tarvilik Taastekava veelkord täiendavalt
korrigeerida, et kõik kavas sisalduvad siduvad kokkulepped ja tulemused oleks võimalik
tähtaegselt saavutada ning tagada sellega Eestile kogu RRF toetuse väljamaksmine Euroopa
Komisjoni poolt 2026.a. lõpuks.
RRF on tulemuspõhine rahastamisinstrument, mille kohaselt teeb Euroopa Komisjon
väljamakseid liikmesriikidele üksnes Taastekavas kokkulepitud investeeringute/reformide
tulemuste (vahe-eesmärgid ja sihid) saavutamise alusel. Euroopa Komisjonilt laekub toetus
rahastamiskokkuleppes määratud kindlasummaliste maksetena, mis ei ole otseses vastavuses
riigisiseselt investeeringute/reformide rakendamisel tekkinud tegelike kuludega. Kuna Eestile
on laekumas Euroopa Komisjonilt 2026.a. lõpus veel viimased kaks makset ning RRF-i
rakendamise lõpptähtaeg on peagi saabumas, peame perioodi lõppedes tagama riigisiseselt
tulude ja kulude vastavuse riigisiseses väljamaksete korras.
Lugupidamisega
(allkirjastatud digitaalselt)
Jürgen Ligi
rahandusminister
Suur-Ameerika 1 / 10122 Tallinn / 611 3558 /
[email protected] / www.rahandusministeerium.ee
registrikood 70000272
Lisad:
1. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamakse korra kinnitamine“ eelnõu
2. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamakse korra kinnitamine“ eelnõu seletuskiri
3. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamakse korra kinnitamine“ eelnõu lisa „Addendum to the Recovery and Resilience Plan“
4. Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamakse korra kinnitamine“ eelnõu lisa „Nõukogu rakendusotsuse (CID) lisa“
Rita Tubarik 5464 0212
[email protected]
2
EELNÕU
2026
VABARIIGI VALITSUS
ISTUNGI PROTOKOLL
Tallinn, Stenbocki maja 2026 nr
Päevakorrapunkt nr
„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese väljamaksete korra kinnitamine
1. Kinnitada „Taaste- ja vastupidavuskava lisa“.
2. Kinnitada Taaste- ja vastupidavuskava alusel laekuva toetuse riigisisene väljamaksete kord.
3. Rahandusministeeriumil avaldada punktis 1 nimetatud dokument taaste- ja
vastupidavusrahastu veebilehel pärast seda, kui Euroopa Liidu Nõukogu on muudatused
heaks kiitnud.
4. Rahandusministeeriumil esitada Taastekava lisa Euroopa Komisjonile heakskiitmiseks.
Kristen Michal
Peaminister
Keit Kasemets
Riigisekretär
Protokolli kantava otsuse „„Taaste- ja vastupidavuskava lisa“ ja toetuse riigisisese
väljamaksete korra kinnitamine“
eelnõu seletuskiri
1. Sissejuhatus
Taaste- ja vastupidavusrahastu (edaspidi RRF) rakendamiseks on „Taaste- ja
vastupidavuskavas“ (edaspidi taastekava) kokku lepitud reformid ja investeeringud ning
tulemused (eesmärgid ja sihid) koos tähtaegadega.
Eelnõuga kiidetakse Euroopa Parlamendi ja nõukogu määruse (EL) nr 2021/241, millega
luuakse taaste- ja vastupidavusrahastu (ELT L 57, 18.02.2021, lk 17-75), artikli 21 lõike 1 ja
Vabariigi Valitsuse 29. novembri 2021 määruse nr 108 „Taaste- ja vastupidavuskava
elluviimise korraldus ja toetuse andmise üldtingimused“ § 4 lõike 1 alusel heaks „Taaste- ja
vastupidavuskava lisa“ muudatus.
Taastekava koostati esmakordselt 2021.a. sügisel, kui lepiti Euroopa Komisjoniga kokku
reformid ja investeeringud koos siduvate eesmärkide ja ajakavaga RRF toetuse kasutamiseks.
2023.a. alguses tehti seoses rahastu mahu vähendamise ja REPowerEU toetuse lisandumisega
kavale muudatuste lisa, mis kiideti Euroopa Liidu Nõukogu poolt heaks mais 2023.a. 2025.a.
sügisel ning 2026.a. algul muudeti Taastekava seoses muutunud olude – sõja, inflatsiooni ja
majanduslanguse – mõjuga ning Euroopa Komisjoni 2025. a juunis antud lihtsustamisjuhiste
rakendamiseks. Kuna Taastekava elluviimise ja tulemuste Euroopa Komisjonile raporteerimise
lõpptähtaeg on august 2026.a., siis on tarvilik Taastekava veelkord täiendavalt korrigeerida, et
kõik kavas sisalduvad siduvad kokkulepped ja tulemused oleks võimalik tähtaegselt saavutada
ning tagada sellega Eestile kogu RRF toetuse väljamaksmine Euroopa Komisjoni poolt 2026.a.
lõpuks. Kavandatav muudatus on mitteametlikult läbi räägitud ka Euroopa Komisjoniga.
RRF on tulemuspõhine rahastamisinstrument, mille kohaselt teeb Euroopa Komisjon
väljamakseid liikmesriikidele üksnes Taastekavas kokkulepitud investeeringute/reformide
tulemuste (vahe-eesmärgid ja sihid) saavutamise alusel. Euroopa Komisjonilt laekub toetus
rahastamiskokkuleppes määratud kindlasummaliste maksetena, mis ei ole otseses vastavuses
riigisiseselt investeeringute/reformide rakendamisel tekkinud tegelike kuludega. Kuna Eestile
on laekumas Euroopa Komisjonilt veel viimased kaks makset ning RRF-i rakendamise
lõpptähtaeg on peagi saabumas, peame perioodi lõppedes tagama riigisiseselt tulude ja kulude
vastavuse riigisiseses väljamaksete korras.
Seletuskirja koostas Rahandusministeeriumi riigieelarve osakonna nõunik Rita Tubarik
(
[email protected], telefon 54640212); eelnõu juriidilise ekspertiisi tegi
Rahandusministeeriumi personali- ja õigusosakonna õigusloome valdkonna juht Virge
Aasa (
[email protected], telefon 58851493).
2. Eelnõu eesmärk
Eelnõuga kinnitatakse Euroopa Parlamendi ja nõukogu määruse (EL) nr 2021/241, millega
luuakse taaste- ja vastupidavusrahastu (ELT L 57, 18.02.2021, lk 17-75), artikli 21 lõike 1 ja
Vabariigi Valitsuse 29. novembri 2021 määruse nr 108 „Taaste- ja vastupidavuskava
elluviimise korraldus ja toetuse andmise üldtingimused“ § 4 lõike 1 alusel „Taaste- ja
vastupidavuskava lisa“ muudatus.
Eelnõuga kinnitatakse Taastekava alusel laekuva toetuse riigisisese väljamaksete korra
muudatus.
3. Eelnõu sisu
3.1. Eelnõu otsusepunktiga 1 kinnitab Vabariigi Valitsus taaste- ja vastupidavuskava lisa.
Taastekava muudatused
Seoses RRF-i rakendamise lõpptähtaja peatse saabumisega 2026.a. augustis võimaldab
Euroopa Komisjon liikmesriikidel Taastekavasid veel viimast korda muuta kuni 31.05.2026, et
tagada kava edukas ja tähtaegne rakendamine ning kindlustada 2026.a. lõpuks rahastu
väljamaksed täismahus.
Eelmise Eesti Taastekava muudatusega 2026.a algul tehti vajalikud korrektuurid ära, kuid
pärast vastavat kava muudatust ilmnes Haridus- ja Teadusministeeriumi investeeringutes
asjaolusid, mis vajaksid kava muudatuse kaudu fikseerimist, et kindlustada Eestile kõik RRF-i
väljamaksed 2026.a. lõpuks.
Haridus- ja Teadusministeeriumi vastutusalas oleva reformi Oskuste reform ettevõtete
digipöördeks rakendamise raames on ilmnenud, et koolitustegevustes osalemise sihttaset ei ole
praegustes tingimustes võimalik saavutada. Võrreldes ajaga, mil meede algselt kavandati, on
nii majanduskeskkonnas kui ka IKT-sektoris toimunud märkimisväärsed muutused.
Majandusraskused, IKT-sektori nõudluse stabiliseerumine, koolitusturu küllastumine ning
ettevõtete kasvav eelistus ettevõttesiseste AI-koolituste suhtes on vähendanud nii tööandjate
kui ka osalejate huvi pikkade ümberõppeprogrammide vastu. Seetõttu tehakse ettepanek
vähendada osalejate sihttaset 2000-lt 1818-le, säilitades samal ajal koolituste kvaliteedi ja
sisulise mõju. Ühtlasi on vajalik muuta Haridus- ja Teadusministeeriumi koolitustegevusega
seotud tulemuste kirjeldust, selleks, et tulemuste saavutamise tõendamine oleks Eesti
süsteemide vaates korrektne.
Lisaks välja toodud muudatusele muudetakse Euroopa Komisjoni juhisele tuginedes osade
Nõukogu rakendusotsuses (CID) välja toodud tulemuste kirjeldusi, eesmärgiga lihtsustada
Taastekava rakendamist ja tulemuste tõendamist lihtsustada ning teha rahastu sulgemine
2026.a. sujuvamaks. Võttes arvesse Euroopa Komisjoni lihtsustamise juhiseid, muudetakse
järgmiste Taastekava investeeringute/reformide sh tulemuste kirjeldusi ja/või esitatavat
tõendusmaterjali:
T13; T20; T27; T31; M98
Uuendustega CID-projekt, mis esitatakse pärast Taastekava muudatuste ametlikku
heakskiitmist Euroopa Komisjoni poolt Euroopa Liidu Nõukogule kinnitamiseks, on esitatud
käesoleva eelnõu lisas.
3.2. Eelnõu otsusepunktiga 2 kinnitab Vabariigi Valitsus Taaste- ja vastupidavuskava
alusel laekuva toetuse riigisisene väljamaksete korra.
Seoses RRF-i rakendamisperioodi lõppemise ja viimaste arveldustega, on vajalik muuta ka
Euroopa Komisjonilt laekuva toetuse riigisisest väljamaksete korda ministeeriumide vahel.
Muudatus on vajalik, et tagada Euroopa Komisjonilt laekuva toetuse korrektne ja läbipaistev
jaotamine vastutavate ministeeriumide vahel ning vältida olukorda, kus jaotus ei vasta tehtud
kuludele ega võimalda perioodi lõpus tulude ja kulude tasakaalustamist.
Arvestades, et kõik RRF-i raames kokkulepitud tulemused peavad olema saavutatud hiljemalt
2026. aasta augusti lõpuks ning pärast seda tähtaega Euroopa Komisjon tulemusi enam arvesse
ei võta, on oluline, et riigisisene väljamaksete kord arvestaks rakendamise lõppfaasi eripärasid,
sealhulgas kulude abikõlblikkuse perioodi lõppemist ning väljamaksete ajastust.
Vabariigi Valitsuse 29. novembri 2021 määruse nr 108 „Taaste- ja vastupidavuskava
elluviimise korraldus ja toetuse andmise üldtingimused“ § 2 lõike 13 järgi tuleb abikõlblikkuse
perioodil tekkinud kulud tasuda hiljemalt 30. oktoobriks 2026. a. Pärast nimetatud tähtaega
tasutud kulud toetusest hüvitamisele ei kuulu.
Kui ministeeriumid on abikõlblikud kulud 30.oktoobriks 2026.a. ära teinud ning Euroopa
Komisjonilt laekuvad Eestile viimased toetuse väljamaksed, siis tehakse ministeeriumidele
viimased maksed vastavalt reformi/investeeringu eelarve piires 31.08.2026 seisuga tekkinud
seni laekumata nõuete mahule.
3.3. Eelnõu otsusepunkti 3 kohaselt esitab Rahandusministeerium taastekava lisa
Euroopa Komisjonile heakskiitmiseks.
Tulenevalt Euroopa Parlamendi ja nõukogu määrusest (EL) 2021/241, millega luuakse taaste-
ja vastupidavusrahastu (ELT L 57, 18.2.2021, lk 17–75) tuleb liikmesriigil Taastekava
muutmiseks esitada pärast mitteametlikke läbirääkimisi ametlik ettepanek Euroopa
Komisjonile, kellel on Taastekava muudatuse heakskiitmiseks aega kaks kuud, misjärel on
Euroopa Liidu Nõukogul aega neli nädalat Taastekava muudatuse alusel rakendusotsuse
tegemiseks. Muudatused jõustuvad pärast Euroopa Liidu Nõukogu rakendusotsuse tegemist.
Kuna Taastekava ellu viimiseks on jäänud vaid pool aastat, siis lubatakse koos Taastekava
muudatuse heakskiitmisega Vabariigi Valitsuse poolt ministeeriumitel jätkata kõikide
tegevustega muudetud Taastekava lisa alusel ära ootamata nõukogu rakendusotsust, et
saavutada kõik uuendatud kavas fikseeritud tulemused hiljemalt augusti lõpuks 2026. aastal.
3.4. Eelnõu otsusepunkti 4 kohaselt esitab Rahandusministeerium Taastekava lisa Riigi
Tugiteenuste Keskusele Taaste- ja vastupidavusrahastu veebilehel avaldamiseks peale
selle kinnitamist Euroopa Liidu Nõukogu poolt.
Taaste- ja vastupidavusrahastu ning Taastekava materjalid, aga ka rakendamist puudutav
jooksev ülevaade on avaldatud Riigi Tugiteenuste Keskuse veebilehel aadressil
https://rtk.ee/toetused-taotlemine/taaste-ja-vastupidavusrahastu-rrf, kuhu lisatakse ka
käesoleva kava muudatusega seotud materjalid.
4. Eelnõu vastavus Euroopa Liidu ja Eesti õigusele
Eelnõu on valmistatud ette kooskõlas Euroopa Parlamendi ja nõukogu määrusega (EL)
2021/241, millega luuakse taaste- ja vastupidavusrahastu (ELT L 57, 18.2.2021, lk 17–75), ning
Euroopa Parlamendi ja nõukogu määrusega (EL) 2023/435, millega muudetakse määrust (EL)
2021/241 seoses REPowerEU peatüki lisamisega taaste- ja vastupidavuskavadesse ning millega
muudetakse määruseid (EL) nr 1303/2013, (EL) 2021/1060, (EL) 2021/1755 ja direktiivi
2003/87/EÜ, samuti kooskõlas Vabariigi Valitsuse 29. novembri 2021. a määrusega nr 108
„Taaste- ja vastupidavuskava elluviimise korraldus ja toetuse andmise üldtingimused“.
5. Eelnõu mõju
Taaste- ja vastupidavusrahastu kogumaht Eestile on 953 184 800 eurot ning sellest 627 mln on
tänaseks 65 saavutatud ja raporteeritud tulemuse eest laekunud. 2026.aasta kevadeks jääb
saavutada veel 48 tulemust ning nendega seotud väljamaksed teeb Euroopa Komisjon hiljemalt
2026.a. lõpuks. Eelnõuga heaks kiidetavas Taastekava lisas ja EL Nõukogu rakendusotsuse
projektis välja toodud muudatuste eesmärk on tagada 2026. aasta lõpuks Eestile RRF-i
väljamaksed täismahus.
6. Eelnõu jõustumine
Vabariigi Valitsuse kinnitamise järel esitab Rahandusministeerium Taastekava Euroopa
Komisjonile heakskiitmiseks.
7. Eelnõu kooskõlastamine
Taastekava lisa on sõnastatud koostöös Haridus- ja Teadusministeeriumiga ning Euroopa
Komisjoniga mitteametlikult läbi räägitud.
Council of the
European Union
Brussels, 2026
(OR. en)
Interinstitutional File:
2026/0056 (NLE) ADD 1
ECOFIN
UEM
FIN
ECB
NOTE EIB
From: General Secretariat of the Council
To: Delegations
Subject: ANNEX to the COUNCIL IMPLEMENTING DECISION amending the
Implementing Decision of 29 October 2021 on the approval of the
assessment of the recovery and resilience plan for Estonia
6468/26 ADD 1 1
ECOFIN 1A EN
ANNEX
SECTION 1: REFORMS AND INVESTMENTS UNDER THE RECOVERY AND
RESILIENCE PLAN
1. Description of Reforms and Investments
A. COMPONENT 1: DIGITAL TRANSFORMATION OF ENTERPRISES
The objective of this component of the Estonian recovery and resilience plan is to foster the digital
transformation of Estonian companies and their competitiveness, in particular on export markets. It
shall provide financial support to companies of all sectors, with a focus on SMEs and
microenterprises, at different stages of their digital transformation, as well as specific contributions
to the adoption and deployment of digital solutions in the construction and road freight transport
sectors. Moreover, the component shall address the key issue of digital skills, through awareness-
raising of SME managers and support to the upskilling and retraining of specialists in information
and communication technologies (ICT).
Actions aimed at supporting the identification of export opportunities and the promotion of
Estonian companies abroad shall be carried out in synergy with the activities of Enterprise Estonia.
The component supports addressing the Country Specific Recommendations on investment in the
digital transition (Country Specific Recommendation 3 in 2020) and on skills shortages (Country
Specific Recommendation 2 in 2019).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
A.1. Description of the reforms and investments for non-repayable financial support
1.1. Investment: Digital transformation in enterprises
The objective of the measure is to foster the digital transformation of businesses with a particular
focus on SMEs and micro-enterprises.
The measure consists in providing financial support to companies including SMEs and micro-
enterprises located in Estonia for their digital transformation.
1.2. Investment: Development of e-construction
The objective of the measure is to contribute to the acceleration of the digital transformation of the
construction sector.
The measure consists in the publication online describing the construction data classification system
and online database of average emission factors of materials; and the support to projects linked to
the use of digital construction tools by private and public entities.
6468/26 ADD 1 2
ANNEX ECOFIN 1A EN
1.3. Investment: Development of digital waybills services
The objective of the measure is to support the digitalisation of the exchange of information in road
freight transport.
The measure consists in supporting service providers in the establishment of eFTI platforms, and
enterprises to be connected to eFTI platforms.
1.4. Reform: Skills reform for the digital transformation of businesses
The objective of the reform is to increase the digital capacity of businesses and to ensure the
availability of ICT professionals.
The measure consists of the support for ICT skills for businesses.
1.5. Reform: Supporting the competitiveness of enterprises in foreign markets
The objective of the measure is to increase the export capacity and competitiveness of Estonian
companies, including notably those of the ICT sector.
The measure consists of the development of export strategies aimed at specific countries or regions;
the opening of business centres located in key export markets and the organisation of missions with
global impact groups.
6468/26 ADD 1 3
ANNEX ECOFIN 1A EN
A.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of Baseline Goal Quarter Year
measure
1 1.1 Digital Milestone Call for proposals Publication of the Q2 2022 A call for proposals to support the digital
transformation in with award criteria notice of the call transformation of businesses, together with the
enterprises and award for proposals award criteria, shall be published by the
conditions Ministry of Economic Affairs and
Communications.
The evaluation criteria and the conditions for
granting support shall be defined on the basis
of an analysis of the needs of Estonian
companies and the expected impact of the
measure.
Eligibility criteria shall also ensure that the
selected projects comply with the ‘Do no
significant harm’ Technical Guidance
(2021/C58/01) through the use of an exclusion
list and the requirement of compliance with
the relevant EU and national environmental
legislation.
2 1.1 Digital Target Award of grants Number of 0 110 Q4 2023 Number of enterprises to which grants shall be
transformation in enterprises awarded by the Ministry of Economic Affairs
enterprises being and Communications to support their digital
awarded a transformation in accordance with the call for
grant proposals.
3 1.1 Digital Target Award of grants Number of 110 230 Q4 2025 Number of grant award decisions done by EIS,
transformation in grant award Estonian Business and Innovation Agency,
enterprises decisions following the call for proposals under
milestone 1.
6468/26 ADD 1 4
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of Baseline Goal Quarter Year
measure
4 1.2 Development Milestone Introduction of a Publication of Q4 2024 Published guidelines shall describe the
of e-construction construction data guidelines and construction data classification system. A
classification system online database database of average emission factors of
materials shall be available online.
Building permits and design specifications,
and building registry (logbook) shall be
accessible from the e-construction platform.
6 1.2 Development Target Projects for digital Number of 0 102 Q4 2025 At least 102 confirmations by the authorities
of e-construction construction tools confirmations accepting the final project implementation
from report for projects on digital construction tools
authorities of private and public entities, selected through
accepting the an open call for proposals
finalreports
7 1.3 Development Target eFTI (electronic Number of 0 5 Q2 2023 Number of projects developing an eFTI
of digital waybills Freight Transport projects platform which have received a positive grant
services Information) launched decision.
platforms
development
9 1.3 Development Target Confirmations from Number of 0 205 Q1 2026 At least 205 confirmations by the authorities
of digital waybills authorities accepting confirmations accepting the final project implementation
services the final reports from reports for projects on digital waybills.
authorities
accepting the
finalreports
6468/26 ADD 1 5
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of Baseline Goal Quarter Year
measure
11 1.4 Skills reform Milestone Entry into force of Entry into force Q2 2022 The secondary legislation necessary for the
for the digital secondary legislation of secondary application and allocation of support shall
transformation of setting out the terms legislation enter into force. The conditions for support
businesses of support for the shall be established through a ministerial
development of decree, which shall be coordinated with the
digital skills Ministry of Finance and the State Shared
Service Centre.
The ministerial decree shall consist of the
following elements:
- objective of the measure,
- description of supported activities,
- beneficiaries and target groups,
- conditions for implementation, eligible
costs and used simplifications,
- conditions for payments,
- conditions for reporting and
monitoring.
12 1.4 Skills reform Target Enrolment in Number of 0 500 Q4 2023 Number of people enrolled in training
for the digital training activities participants activities supported under this measure,
transformation of consisting of awareness-raising for SME
businesses managers, and upskilling and retraining for
ICT specialists. A minimum of 35% of
participants enrolled in these training activities
shall be women.
13 1.4 Skills reform Target The participation Number of 0 1818 Q2 2026 Number of confirmed participations in training
for the digital in training confirmed activities supported under this measure.
transformation of activities participatio
businesses ns
6468/26 ADD 1 6
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of Baseline Goal Quarter Year
measure
14 1.4 Skills reform Target Number of Number of 0 10 Q4 2024 Five curriculums of training shall be registered
for the digital curriculums of curriculums in Estonia’s Adult training information system
transformation of training registered and registered (JUHAN).
businesses qualification and Five new or updated qualification standards
standards for ICT qualification for ICT specialists shall be registered in the
specialists registered standards national register of qualification standards.
registered
16 1.5 Supporting the Milestone Preparation of the Completion of Q2 2022 The preparatory tasks needed to draw up
competitiveness of development of preparatory tasks export strategies shall be completed.
enterprises in strategies These tasks include:
foreign markets - an analysis of which external markets
are important to develop strategies,
- an analysis of the interests of
businesses,
- a mapping of the needs of exporting
enterprises to increase their competitiveness
on export markets, the ranking of the needs.
17 1.5 Supporting the Milestone Procurement of Signature of Q2 2024 Tenders for drawing up strategies and product
competitiveness of studies contracts packages with a view to obtaining detailed
enterprises in market information on foreign markets shall be
foreign markets carried out by the Ministry of Foreign Affairs.
The corresponding contracts shall be signed.
18 1.5 Supporting the Target Strategies published Number of 0 27 Q2 2026 At least 13 national and/or regional export
competitiveness of and missions carried strategies strategies shall be published and at least 14
enterprises in out published and missions carried out.
foreign markets missions
carried out
6468/26 ADD 1 7
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of Baseline Goal Quarter Year
measure
19 1.5 Supporting the Milestone Preparatory analysis Delivery of a Q2 2022 A preparatory analysis allowing the definition
competitiveness of to define the content preparatory of the content and the locations of the business
enterprises in and the locations of analysis centres shall be prepared by the Ministry of
foreign markets business centres Foreign Affairs. The analysis shall reveal
where to set up business centres to increase
demand for Estonian-made products and
services in export markets.
20 1.5 Supporting the Target Number of business Number of 0 7 Q2 2026 Number of business centres opened in foreign
competitiveness of centres opened business countries that are important export markets.
enterprises in centres
foreign markets
21 1.5 Supporting the Milestone Setting-up of impact Decisions on the Q2 2022 Based on an analysis, the Ministry of Foreign
competitiveness of groups and selection composition of the Affairs shall select global digital mission
enterprises in of destinations for impact groups and destinations and impact groups to increase the
foreign markets global digital the destinations of added value of Estonian digital services
missions the global digital exports, increase the export capacity of
missions Estonian companies, among which ICT
companies in particular, and attract additional
foreign investments for innovation.
6468/26 ADD 1 8
ANNEX ECOFIN 1A EN
B. COMPONENT 2: ACCELERATING THE GREEN TRANSITION IN ENTERPRISES
B.1. Description of the reforms and investments for non-repayable financial support
The objective of the component of the Estonian recovery and resilience plan is to speed up the
green transition in the business sector in Estonia and to seize the business opportunities it
represents. The component consists of two reforms and six investments and aims to support the
development of green technologies, increase green R&D and innovation capabilities and resource
efficiency, introduce new business models and improve skills and expertise in fields related to the
green transition. The measures under this component aim for a comprehensive approach to the
green transition addressing key market failures and facilitating the technological and behavioural
breakthrough to increase the competitiveness of the business sector. The measures also support
further development of the capital market and business environment.
The component supports addressing the Country Specific Recommendations on supporting the
innovation capacity of small and medium-sized enterprises and focussing investment on the green
transition, ensuring sufficient access to finance (Country Specific Recommendation 3 in 2020), on
skills shortages (Country Specific Recommendation 2 in 2019) and reducing reliance on fossil fuels
(Country Specific Recommendation 4 in 2022).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
2.1. Reform: Green transition of enterprises
The objective of the reform is to improve the green transition in the business sector, which is
expected to have economic, environmental and social benefits by making existing businesses more
efficient and environmentally friendly (resource efficiency, new green transition certificates and
market authorisations for products) and by supporting the emergence of new green technology
companies (development and deployment of green technologies, new opportunities for the
valorisation of bio-resources).
The reform shall consist of the set-up of a broad-based Green Transition Task Force to foster
cooperation between the green technology stakeholders and the adoption of legislation necessary
for the implementation of the five complementary investments: 1. Green skills to support the green
transition of companies; 2. Green technology development programmes; 3 Modernisation of the
business models in manufacturing companies; 4. Resource efficient green technologies; and 5.
Green Fund.
The reform is interlinked with Component 1 as digitalisation and automation are contributing to the
development of green technologies and green transition in the business sector.
The implementation of the reform shall be completed by 31 December 2022.
2.2. Investment: Green skills to support the green transition of enterprises
The objective of the investment is to ensure the availability of skilled adults for the green transition
in enterprises.
6468/26 ADD 1 9
ANNEX ECOFIN 1A EN
The investment consists of the introduction of green skills upskilling and retraining programmes for
adults.
2.3. Investment: Green technologies development programme
The objective of the investment is to contribute to the green transition of companies.
The investment consists of support to start-ups and development clusters with a focus on integrated
green technology solutions through various services.
2.4. Investment: Modernisation of the business models in manufacturing companies
The objective of the investment is to support the change of business models in manufacturing to
facilitate the compliance of Estonian products with environmental and climate objectives.
The measure consists of support to projects modernising the business models of manufacturing
companies related to climate and environmental objectives.
2.5. Investment: Resource-efficient green technologies
The objective of the investment is to support the resource efficiency of companies, including energy
efficiency, with a particular focus on the valorisation of underutilised bio-resources.
The measure consists of support to projects for resource-efficient green technologies; and for the
valorisation of bio-resources.
2.6. Investment: Green Fund
The objective of the investment is to provide capital for the development of new green technologies in
strategic areas such as energy, agriculture, food industry, transport and logistics, materials and
chemical industries. The Green Fund shall provide funding for companies and sectors whose
products, services or processes are characterised by research-intensive green technologies and
whose activities contribute to solving environmental problems, developing new products, services
or technologies that reduce or capture greenhouse gas emissions or are driven by eco-design
requirements.
The measure aims to be implemented as a financial instrument. The Green Fund shall consist of a
public investment in a Facility, the SmartCap Green Fund, in order to incentivise private investment
and improve access to finance in Republic of Estonia. On the basis of the RRF investment, the
Facility aims at initially providing at least EUR 90 million of financing.
The Facility shall be managed by AS SmartCap as the implementing partner. The Facility shall
include the following product lines:
• direct equity investments in early to expansion stage (including late growth and maturity
stage and infrastructure) innovative and/or research-intensive green technology companies by
acquiring equity instruments, in particular new ordinary or preferred shares of a private
or public limited company or other equivalent rights that represent a holding issued by the
target undertaking;
• investments in investment funds that make equity investments that focus on: a) initial or
seed phase investments to ensure market activation and the generation of transaction flows
based on new technologies through business accelerators and intensive programs for the
development of innovative and/or research-intensive companies; b) early-stage investments
6468/26 ADD 1 10
ANNEX ECOFIN 1A EN
to finance the market introduction of new technologies; and/or early growth or expansion
stage (including late growth and maturity stage and infrastructure) investments to finance
the rapid growth and expansion of companies on the market, including international
expansion and export of products, services or technology.
In order to implement the investment into the Facility, the Estonian Ministry of Economic Affairs
and Communication and AS SmartCap shall sign an Implementing Agreement that shall include the
following content:
1. Description of the decision-making process of the Facility: The final investment decision
of the Facility shall be taken by an investment committee or other relevant equivalent
governing body and approved by a majority of votes from members who are independent
from the government.
2. Key requirements of the associated investment policy shall be specified:
a. The description of the financial product(s) and eligible final beneficiaries.
b. The requirement that all investments supported are economically viable.
c. The requirement to comply with t h e ‘ D o no significant harm’ Technical Guidance
(2021/C58/01). The legal agreement signed between Estonia and SmartCap and the
subsequent investment policy of the Green Fund shall:
i. require the application of the Commission’s technical guidance on
sustainability proofing for the InvestEU Fund; and
ii. require companies that derived more than 50% of their revenues during the
preceding financial year from the following activities and/or assets to adopt
and publish green transition plans: (i) activities and assets related to fossil
fuels, including downstream use1; (ii) activities and assets under the EU
Emission Trading System (ETS) achieving projected greenhouse gas
emissions that are not lower than the relevant benchmarks2; (iii) activities and
assets related to waste landfills, incinerators3 and mechanical biological
treatment plants4; and (iv) activities and assets where the long-term disposal
of waste may cause harm to the environment; and
iii. require the verification of legal compliance with the relevant EU and national
environmental legislation of the beneficiary by SmartCap for all transactions,
including those exempted from sustainability proofing.
1
Except projects under this measure in power and/or heat generation, as well as related transmission and distribution
infrastructure, using natural gas, that are compliant with the conditions set out in Annex III of the‘Dono significant
harm’ Technical Guidance (2021/C58/01).
2
Where the activity supported achieves projected greenhouse gas emissions that are not significantly lower than the
relevant benchmarks an explanation of the reasons why this is not possible should be provided. Benchmarks
established for free allocation for activities falling within the scope of the Emissions Trading System, as set out in
the Commission Implementing Regulation (EU) 2021/447.
3
This exclusion does not apply to actions under this measure in plants exclusively dedicated to treating non-
recyclable hazardous waste, and to existing plants, where the actions under this measure are for the purpose of
increasing energy efficiency, capturing exhaust gases for storage or use or recovering materials from incineration
ashes, provided such actions under this measure do not result in an increase of the plants’ waste processing capacity
or in an extension of the lifetime of the plants; for which evidence is provided at plant level.
4
This exclusion does not apply to actions under this measure in existing mechanical biological treatment plants,
where the actions under this measure are for the purpose of increasing energy efficiency or retrofitting to recycling
operations of separated waste to compost bio-waste and anaerobic digestion of bio-waste, provided such actions
under this measure do not result in an increase of the plants’ waste processing capacity or in an extension of the
lifetime of the plants; for which evidence is provided at plant level.
6468/26 ADD 1 11
ANNEX ECOFIN 1A EN
3. Monitoring, audit, and control requirements, including:
1. The description of the SmartCap monitoring system to report on the investment
mobilized.
2. The description of the SmartCap procedures that will ensure the prevention,
detection and correction of fraud, corruption, and conflicts of interests.
3. The obligation to verify the eligibility of every operation in accordance with the
requirements laid out in the Implementing Agreement before committing to finance
an operation.
4. The obligation of carrying out risk-based ex-post audits in accordance with an audit
plan of the AS SmartCap. These audits shall verify i) that the control systems are
effective, including the detection of fraud, corruption, and conflict of interests; ii)
compliance with the DNSH principle, the State Aid rules, the climate target
requirements;
The audits shall also verify the legality of the transactions and that the conditions of
the applicable Implementing Agreement and Funding Agreements are being
respected
4. Requirements for selecting financial intermediaries: AS SmartCap shall select
financial intermediaries in an open, transparent, and non-discriminatory manner. Controls
for the absence of conflict of interests on financial intermediaries shall take place and be
conducted ex-ante for all financial actors involved.
5. Requirement to sign Funding Agreements: AS SmartCap shall sign Funding
Agreements with the financial intermediaries in line with key requirements that shall be
provided as an annex of the Implementing Agreement. The key requirements of the Funding
Agreement shall include all the requirements under which the Facility operates, including:
1. The obligation of the financial intermediary to take its decisions in
compliance mutatis mutandis with the decision making and investment policy
requirements specified above, including related to respect of the DNSH
principle.
2. The description of the monitoring and audit and control framework that the
financial intermediary shall put in place, which mutatis mutandis shall be
subject to all the monitoring, audit and control requirements specified above.
2.7. Investment: Creating opportunities for the uptake of renewables-based green hydrogen
technologies
The objective of the investment is to support the 1st phase of the launch and piloting of hydrogen
integrated value chains from energy production and supply solutions to final consumption in
different application areas.
The measure consists of support for projects in renewable-based green hydrogen technologies.
6468/26 ADD 1 12
ANNEX ECOFIN 1A EN
2.8. Investment: Supply Security Investment Support
The objective of the investment is to support the transition of companies from fossil energy sources
to alternative energy supply sources.
The measure consists of support to investment projects for the transition of companies from fossil
energy sources to alternative energy supply.
6468/26 ADD 1 13
ANNEX ECOFIN 1A EN
B.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Qualitative Quantitative Indicative timeline
Related Measure
Sequential Milestone Unit of indicators for completion Description of each milestone and
(Reform or Name indicators (for
Number /Target measure (for targets) target
Investment)
milestones) Baseli Goal Quarter Year
23 2.1Green Milestone Creation ofa Green Set up of a task ne Q4 2021 The Ministry of the Environment shall
transition of Transition Task Force force and reform the existing Working Group on
enterprises to implement and working groups Green Technology (set up in 2020) into
monitor the green the RRP’s Green Transition Task Force
transition to coordinate the measures on the green
transition of companies and improve
cooperation and exchange of
information among the public sector,
stakeholders and interest groups. The
necessary working groups shall be set up
for specific measures.
24 2.1Green Milestone Adoption of the Circular Q4 2022 The Green Transition Task Force shall
transition of Circular Economy Economy Action review the existing Circular Economy
enterprises Action Plan by the Plan adopted activities and different action plans into
Green Transition Task a single Circular Economy Action Plan
Force that will lead the Estonian transition to
Circular Economy.
25 2.2 Green skills to Milestone Entry into force of Entry into force Q2 2022 The secondary legislation necessary for
support the green secondary legislation of secondary the application and allocation of
transition of setting out the terms of legislation support shall enter into force. It shall
enterprises support for the contain provisions ensuring that any
development of green action supported under this measure is
skills focused on areas contributing to the
reduction of greenhouse gas emissions
or the adaptation to climate change.
27 2.2 Green skills to Target Confirmed participati Number of 0 2 830 Q2 2026 Number of confirmed participations in
support the green ons confirmed training activities supported under this
transition of participations measure.
enterprises
6468/26 ADD 1 14
ANNEX ECOFIN 1A EN
Qualitative Quantitative Indicative timeline
Related Measure
Sequential Milestone Unit of indicators (for for completion Description of each milestone and
(Reform or Name indicators (for
Number /Target measure targets) target
Investment)
milestones) Baseline Goal Quarter Year
28 2.3 Green Milestone Establishment of a Recruitment of a Q4 2021 A project manager shall be recruited
technologies working group to plan project manager and a broad-based group of
development and set up the and set up of a stakeholders shall be set up to
programme development working group coordinate investment planning and
programme implementation. The role of the project
manager shall be set out to gather
information from market participants and
design the necessary support measures
and procurement. The working group
shall be composed of parties involved in
the development of entrepreneurship
and shall undertake to meet at least three
times a year to take stock of
developments in investment- related
activities and provide
recommendations for further action.
The working group shall draw up
provisions related to the selection of
actions to be supported under the
development programme in such a way
that it is ensured that each action
directly contributes either to lowering
greenhouse gas emissions or supporting
adaptation to climate change.
6468/26 ADD 1 15
ANNEX ECOFIN 1A EN
Qualitative Quantitative Indicative timeline
Related Measure
Sequential Milestone Unit of indicators (for for completion Description of each milestone and
(Reform or Name indicators (for
Number /Target measure targets) target
Investment)
milestones) Baseline Goal Quarter Year
29 2.3 Green Milestone Set up of the Green Contracts signed Q2 2024 The public procurement processes for at
technologies Technologies for all least 5 development clusters shall be
development Development development completed and the contracts shall be
programme Programme clusters and awarded to the winning parties.
support measures
designed and Support measures shall be designed and
opened their first rounds shall be opened to at
least 10 start-ups.
The selection processes shall ensure
that each supported action directly
contributes either to lowering
greenhouse gas emissions or supporting
adaptation to climate change.
31 2.3 Green Target Number of clusters Number of 0 15 Q2 2026 Confirmations by the authorities
technologies and startups supported clusters and accepting the final report for at least 5
development through the Green startups clusters and at least 10 start-ups from
programme Technology supported the development programme.
Development
Programme
6468/26 ADD 1 16
ANNEX ECOFIN 1A EN
Qualitative Quantitative Indicative timeline
Related Measure
Sequential Milestone Unit of indicators (for for completion Description of each milestone and
(Reform or Name indicators (for
Number /Target measure targets) target
Investment)
milestones) Baseline Goal Quarter Year
32 2.4 Modernisation Milestone Entry into force of the Entry into force Q2 2022 The conditions for granting support
of the business ministerial decree of the ministerial shall be enacted by a decree of the
models in setting out the terms decree responsible minister. The requirements
manufacturing and conditions of grant set shall include eligibility criteria to
companies eligibility ensure that the selected projects comply
with the ‘Do no significant
harm’Technical Guidance (2021/C58/01)
by means of an exclusion list and
compliance with relevant EU and
national environmental legislation. The
selection/eligibility criteria shall
specify that the supported activities
and/or enterprises contribute to a
climate-neutral economy, resilience and
climate change adaptation including
circular economy objectives such as in-
house implementation of circular
economy principles, transfer of
transport and storage of companies to
new foundations.
33 2.4 Modernisation Target Confirmations by Number of 0 70 Q2 2026 At least 70 confirmations by the
of the business authorities accepting confirmations authorities accepting the final project
models in the final project by authorities implementation reports following the
manufacturing reports accepting the call for proposals from milestone 32.
companies final project
reports
6468/26 ADD 1 17
ANNEX ECOFIN 1A EN
Qualitative Quantitative Indicative timeline
Related Measure
Sequential Milestone Unit of indicators (for for completion Description of each milestone and
(Reform or Name indicators (for
Number /Target measure targets) target
Investment)
milestones) Baseline Goal Quarter Year
34 2.5 Resource Milestone Publication of call for Publication of the Q2 2022 Call for proposals to support resource-
efficient green proposals for grants notice for calls efficient green technologies and the
technologies for proposals for valorisation of bio-resources shall be
grants published and open for applications,
including eligibility criteria to ensure that
the selected projects comply with
the‘Dono significant harm’ Technical
Guidance (2021/C58/01) by means of an
exclusion list and compliance with
relevant EU and national environmental
legislation. The selection/eligibility
criteria shall specify that the supported
activities and/or enterprises contribute
to a climate-neutral economy, resilience
and climate change adaptation
35 2.5 Resource Target Number of projects Number of 0 36 Q4 2023 Award of grants to 36 projects selected
efficient green awarded grants projects under the competitive call for
technologies following the call for proposals, for green technologies for
proposals industrial plants and for valorisation of
bioresources, in compliance with the terms
of reference.
36 2.5 Resource Target Confirmations from Number of 0 36 Q2 2026 At least 36 confirmations from the
efficient green authorities accepting confirmations authorities accepting the final project
technologies the final reports from implementation reports following the
authorities call for proposals from milestone 34.
accepting the
finalreports
6468/26 ADD 1 18
ANNEX ECOFIN 1A EN
Qualitative Quantitative Indicative timeline
Related Measure
Sequential Milestone Unit of indicators (for for completion Description of each milestone and
(Reform or Name indicators (for
Number /Target measure targets) target
Investment)
milestones) Baseline Goal Quarter Year
37 2.6 Green Fund Milestone Signature of Signature of Q4 2021 A contractual agreement shall be signed
contractual agreement contractual between the Ministry of Economic
between the Ministry agreement Affairs and Communications and
of Economic Affairs SmartCap to manage the Green Fund,
and Communications which shall contain:
and SmartCap - Investment objectives to invest
in enterprises and activities
contributing to a climate-neutral
economy and to improving resilience to
climate change, including awareness-
raising measures,
- Eligibility criteria for
compliance with the‘Dono significant
harm’ Technical Guidance
(2021/C58/01) of supported
beneficiaries through the use of
sustainability proofing, an exclusion list
and the requirement of compliance with
the relevant EU and national
environmental legislation.
6468/26 ADD 1 19
ANNEX ECOFIN 1A EN
Qualitative Quantitative Indicative timeline
Related Measure
Sequential Milestone Unit of indicators (for for completion Description of each milestone and
(Reform or Name indicators (for
Number /Target measure targets) target
Investment)
milestones) Baseline Goal Quarter Year
38 2.6 Green Fund Milestone Adoption ofthe Investment Q4 2021 SmartCap shall adopt the investment
investment policy policy document policy for the Green Fund, in line with
document by adopted by the contractual agreement signed
SmartCap SmartCap between the Ministry of Economic
Affairs and Communications and
SmartCap, including the investment
objectives and the eligibility criteria to
ensure compliance with the ‘Do no
significant harm’ Technical Guidance
(2021/C58/01) of supported
beneficiaries under this measure
through the use of sustainability
proofing, the requirement of compliance
with the relevant EU and national
environmental legislation, and the
requirement for beneficiaries that
derived more than 50% of their
revenues during the preceding financial
year from activities or assets in the
exclusion list to adopt and publish
green transition plans.
39a 2.6 Green Fund Milestone Completion of the Transfer Q3 2025 Estonia shall transfer EUR 100 million
investment by the to AS SmartCap for the Facility. The
Ministry of Economic transfer shall be conditional upon the
Affairs and inclusion of the requirements of the
Communication measure description in the relevant
contractual agreements.
40a 2.6 Green Fund Target Legal financing Percentage 0 100 Q2 2026 AS SmartCap shall have entered into
agreements signed (%) legal financing agreements with equity
with equity/venture investments /venture capital funds for an
capital funds amount necessary to use 100% of the
RRF investment into the Facility
(taking into account operational
expenditures).
6468/26 ADD 1 20
ANNEX ECOFIN 1A EN
Qualitative Quantitative Indicative timeline
Related Measure
Sequential Milestone Unit of indicators (for for completion Description of each milestone and
(Reform or Name indicators (for
Number /Target measure targets) target
Investment)
milestones) Baseline Goal Quarter Year
41 2.7 Creating Milestone Entry into force of the Entry into force Q4 2022 Development of project selection
opportunities for ministerial decree of the ministerial criteria, and entry into force of the
the uptake of setting out the terms and decree ministerial decree on the conditions for
renewables-based conditions for granting support for projects related to
green hydrogen granting support integrated green hydrogen
technologies technologies. The terms of reference for
this support shall include eligibility
criteria that ensure that the objectives
of the selected projects comply with
the‘Do no significant harm’ Technical
Guidance (2021/C58/01) through the
use of an exclusion list and the
requirement of compliance with the
relevant EU and national environmental
legislation.
43 2.7 Creating Target Grant agreements EUR 0 11 550 000 Q3 2025 Grant agreements signed for projects in
opportunities for signed for projects in renewables-based green hydrogen
the uptake of renewables-based technologies under this measure,
renewables-based green hydrogen representing at least EUR 11 million
green hydrogen technologies
technologies
6468/26 ADD 1 21
ANNEX ECOFIN 1A EN
Qualitative Quantitative Indicative timeline
Related Measure
Sequential Milestone Unit of indicators (for for completion Description of each milestone and
(Reform or Name indicators (for
Number /Target measure targets) target
Investment)
milestones) Baseline Goal Quarter Year
43a 2.8 Supply security Milestone Publication of the call Publication of the Q4 2023 A call for proposals to support
investment support for proposals for notice for call for investment projects for the transition of
grants proposals for companies from fossil energy sources
grants to alternative energy supply sources
shall be published and open for
applications, including eligibility
criteria to ensure that the selected
projects comply with the ‘Do no
significant harm’ Technical Guidance
(2021/C58/01) by means of
requirements related to supported
eligible alternative energy sources and
supported activities as set out in the
measure description and compliance
with relevant EU and national
environmental legislation.
43c 2.8 Supply security Target Confirmations from Number of 0 70 Q2 2026 At least 70 confirmations from the
investment support authorities accepting confirmations authorities accepting the final project
the final reports from implementation reports following the
authorities call for proposals from milestone 43a.
accepting the
finalreports
6468/26 ADD 1 22
ANNEX ECOFIN 1A EN
C. COMPONENT 3: DIGITAL STATE
Building on the successful deployment of digital technologies for the delivery of public services in
Estonia over the last years, this component of the Estonian recovery and resilience plan aims at
upgrading the digital government services further, in particular in terms of user-centricity and
resilience (including in light of the growing cybersecurity threats). The component features
measures allowing to take advantage of the opportunities offered by the latest technologies,
especially artificial intelligence, but also significant redesigns of both front-end and back-end
services. They shall benefit both citizens and businesses. Specific actions are foreseen in order to
reinforce the country’s capacities to combat money laundering. The support to the deployment of
very high capacity networks in rural areas is also expected to ensure wider access to online services
and, more generally, contribute to the further digital transformation of the country.
The component supports addressing the Country Specific Recommendations on investment in the
digital transition (Country Specific Recommendation 3 in 2020) and on the anti-money laundering
framework (Country Specific Recommendation 1 in 2019 and Country Specific Recommendation 4
in 2020).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
C.1. Description of the reforms and investments for non-repayable financial support
3.1. Reform: Creation and development of a centre of excellence for data governance and
open data
The objective of the measure is to foster a better management of the data collected and held by the
Estonian public authorities.
The measure consists of the creation of a data management team within Statistics Estonia; and
publication of datasets.
3.2. Reform: Development of event services for individuals
The objective of the measure is to support the efficiency of the delivery of public services and
reduce the administrative burden for citizens.
The measure consists of providing life event services for citizens online.
3.3. Reform: Development of event services and digital gateway for entrepreneurs
The objectives of the measure are to support the efficiency and the quality of the delivery of public
services and reduce the administrative burden for entrepreneurs.
The measure consists of IT developments related to the business event services and/or gateway for
entrepreneurs.
3.4. Investment: #Bürokratt programme (national virtual assistant)
The objective of the measure is to support the user-friendliness and accessibility of public services
6468/26 ADD 1 23
ANNEX ECOFIN 1A EN
in Estonia.
The measure consists of developing a virtual assistant for the access to online public services which
builds on pilot projects carried out in 2020 and 2021.
3.5. Investment: Reconfiguration of basic digital services and safe transition to cloud
infrastructure
The objective of the measure is to increase the resilience, the security and the reliability of the IT
systems and services of the Estonian public authorities.
The measure consists of:
- the creation of a new public body in charge of the central management of the IT basic services
and infrastructures of public institutions,
- the procurement of private cloud infrastructure resources,
- the migration of existing information systems to the private cloud,
- the testing of information systems used by public authorities by the Estonian Information
System Authority (RIA),
- the extension of the private cloud to the data embassy.
3.6. Reform: The strategic analysis of money laundering and terrorist financing in Estonia
The objective of the reform is to increase the capacity of the Financial Intelligence Unit to identify
money laundering schemes and channels at an early stage.
The measure consists of establishing a Centre for Strategic Analysis within the Financial
Intelligence Unit.
3.7. Investment: Information system for strategic analysis of money laundering and terrorist
financing
The objective of the measure is to enable the exploitation of data available from different authorities
and the identification of possible money laundering schemes and channels.
The measure consists of developing an IT system.
3.8. Investment: Construction of very high capacity broadband networks
The objective of the investment is to support the access to very high capacity broadband networks
(VHCN), which offer a connection of at least 100 Mbps.
The measure consists of providing financial support to projects for the construction of very high
capacity broadband networks.
6468/26 ADD 1 24
ANNEX ECOFIN 1A EN
C.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone completion Description of each milestone
(Reform or Name indicators (for
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
44 3.1 Creation and Milestone Setting up a data Establishment of the Q4 2021 Creation of a Data Management
development of a centre management team necessary Team in Statistics Estonia through the
of excellence for data intheStatistical organisational recruitment of expert staff tasked
governance and open Office, the structure for with coordinating the data
data Ministry of coordinating data governance framework and
Economic Affairs management supporting other public authorities. In
and addition, posts shall be created at the
Communications Ministry of Economic Affairs and
and the State Communications and at the State
Information Information System Agency
System Authority to carry out development projects.
By the end of 2021, at least five
people shall be recruited across the
three entities.
46 3.1 Creation and Target Publication of Number of 706 2 600 Q4 2025 The number of datasets published
development of a centre datasets published shall be increased from 706 on 13
of excellence for data datasets August 2021 to 2 600.
governance and open
data
6468/26 ADD 1 25
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone completion Description of each milestone
(Reform or Name indicators (for
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
47 3.2 Development of Target Launch of personal Number of 0 2 Q4 2022 Number of citizen life event
eventservices for life event services services services and/or proactive services
individuals and/or proactive which are launched online.
services operational The corresponding IT solutions
enabling the provision of the
services shall be operational at least
in the basic parts of a given service
and are subject to a further
development during the
implementation of the measure.
The selection of concerned services
shall be based on the development
plan for personal life event and
proactive services.
48 3.2 Development of Target Online personal life Number of 2 10 Q4 2025 Number of citizen life event
eventservices for event services services services online, providing at least
individuals online the basic parts of a given service.
6468/26 ADD 1 26
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone completion Description of each milestone
(Reform or Name indicators (for
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
49 3.3 Development of Target Deployment of IT Number of 0 1 Q4 2022 Number of IT development projects
event services and developments projects that contributing to the implementation
digital gateway for contributing to the have of the business event services and
entrepreneurs implementation of successfully gateway that have successfully
the business event deployed new deployed new developments online.
services and developments These development projects shall be
gateway online either directly related to the
development of the digital gateway
for entrepreneurs or to the
development of business-event
services, which additionally include
the development of various related
systems for interfacing with the
digital gateway. As a result of each
development project, at least a
minimally functional IT solution
shall be completed (i.e., the IT
solution shall be operational at least
in the basic parts for the end users
(entrepreneurs) and shall be able to
provide feedback for further
development needs during the
reform implementation period or
afterwards).
50 3.3 Development of Target IT developments Number of IT 1 10 Q4 2025 Number of IT developments related
event services and online developments to the business event services and/or
digital gateway for online gateway that are available online.
entrepreneurs
6468/26 ADD 1 27
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone completion Description of each milestone
(Reform or Name indicators (for
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
51 3.4 #Bürokratt Target Access todigital Number of 0 1 Q2 2022 Number of digital public services
programme (national public services public digital available through the platform of
virtual) through the virtual services the virtual assistant.
assistant platform accessible
through the
virtual
assistant
52 3.4 #Bürokratt Target Bürokratt virtual Number of 0 18 Q4 2025 Number of public authority
programme (national assistant on public websites websites in which the virtual
virtual) authorities’website assistant provides services.
s
54 3.5 Reconfiguration of Milestone Development of Opening of shared Q3 2022 Basic IT services provided/shared
basic digital services and centrally server hosting and centrally shall open for subscription
safe transition to cloud delivered/shared IT computer by new users (ministries and other
infrastructure base services workstation services authorities).
to public authorities
55 3.5 Reconfiguration of Target Deployment of Number of 0 10 Q4 2023 Number of information systems for
basic digital services and national private information which the migration to the private
safe transition to cloud cloud systems cloud infrastructure shall be
infrastructure infrastructure by migrated to completed.
public authorities the national
private cloud
56 3.5 Reconfiguration of Milestone Extension of the Completion of the Q4 2023 It shall become possible to host and
basic digital services and cloud extension ofthe operate information systems
safe transition to cloud infrastructure to national private migrated to the private cloud from
infrastructure the data embassy cloud to the the data embassy. New hardware and
infrastructure of licenses shall be acquired and set
Estonia’s data up for this purpose.
embassy
6468/26 ADD 1 28
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone completion Description of each milestone
(Reform or Name indicators (for
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
58 3.5 Reconfiguration of Target Security testing by Number of 0 16 Q4 2024 Number of security tests carried out
basic digital services and the Information tests by the Information System
safe transition to cloud System Authority Authority.
infrastructure The test results shall be summarised
in security testing reports.
59 3.6 The strategic Milestone Entry into force of Entry into force of Q4 2024 Legal act(s) shall have entered into
analysis of money legal act(s) legal act(s) force to allow the Centre for
laundering and terrorist Strategic Analysis to access and
financing in Estonia process data relevant to the
detection and prevention of money
laundering and terrorist financing:
(1) the statute of the Financial
Intelligence Unit shall enter into
force establishing the Centre for
Strategic Analysis.
(2) an amendment of the Money
Laundering and Terrorist Financing
Prevention Act shall enter into
force.
60 3.7 Information system Milestone ICT system for ICT system available Q2 2026 The ICT system for strategic
for strategic analysis of strategic analysis for use by the analysis of money laundering shall be
money laundering and Financial available for use by the Financial
terrorist financing Intelligence Unit Intelligence Unit.
6468/26 ADD 1 29
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone completion Description of each milestone
(Reform or Name indicators (for
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
62 3.8 Construction of very Target Number of very Number of 0 100 Q4 2025 Number of projects confirmed by
high capacity broadband high capacity projects the Consumer Protection and
networks broadband network Technical Regulatory Authority
projects confirmed (TTJA) to be respecting the
requirements of the ministerial
Regulation on the conditions and
procedure for the support measure
for the construction of a VHCN.
The ministerial Regulation shall
define the VHCN using the end
users' download speed of at least
100 Mbps.
6468/26 ADD 1 30
ANNEX ECOFIN 1A EN
D. COMPONENT 4: ENERGY AND ENERGY EFFICIENCY
This component of the Estonian recovery and resilience plan addresses the challenge of
decarbonising the energy sector. The objectives of the component are to reduce the dependency on
oil shale, incentivise uptake of renewable energy and improve the energy efficiency of buildings.
The component supports addressing the Country Specific Recommendation to focus investments on
energy infrastructure and on resource and energy efficiency, contributing to the progressive
decarbonisation of the economy (Country Specific Recommendation 3 in 2019 and in 2020).
Upgraded and new measures support addressing the Country Specific Recommendation on reducing
reliance on fossil fuels through facilitating the deployment of renewable energy sources and
increasing energy efficiency (Country Specific Recommendation 4 in 2022).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
D.1. Description of the reforms and investments for non-repayable financial support
4.1. Reform: Energy efficiency promotion
The objective of the reform is to reduce the administrative barriers to energy efficient renovations.
The measure consists of setting up a regional advisory network and training of technical consultants
in order to provide the necessary information and incentivise renovations.
4.2. Investment: Support for the renovation of multi-apartment buildings
The objective of the measure is to boost renovations of multi-apartment buildings in order to
increase energy efficiency.
The measure consists of support for energy efficiency renovations of multi-apartment buildings
achieving an average level of primary energy savings of at least 30%.
4.3. Investment: Support for the renovation of small residential buildings
The objective of the measure is to boost renovations of small residential buildings in order to
increase energy efficiency.
The measure consists of support for energy efficiency renovations of small residential buildings.
4.4. Reform: Boosting the green transition in the energy economy
The objective of the measure is to contribute to decarbonising energy in Estonia.
The measure consists of updating the National Development Plan of the Energy Sector and
adopting legislation to accelerate the installation of renewable electricity production capacity.
4.5. Investment: Programme to increase the capacity of the electricity transmission network
The objective of this measure is to enable the connection of additional renewable energy production
to the transmission network.
The measure consists of an increase in the capacity of the electricity transmission network.
6468/26 ADD 1 31
ANNEX ECOFIN 1A EN
4.6. Investment: Programme to boost energy production in industrial areas
The objective of the measure is to incentivise the production of electricity close to consumption.
The measure consists of supporting additional connection capacity for renewable electricity
production in or near industrial sites.
4.7. Investment: Pilot Energy Storage Programme
The objective of the measure is to carry out a pilot programme on renewable energy storage in
Estonia.
The investment consists of grants to companies investing in heat and electricity storage capacity.
4.8. Investment: Boosting offshore wind farms development
The objective of this measure is to make it possible for offshore wind turbines, regardless of their
height, to operate in the Gulf of Riga and Estonian islands Hiiumaa, Saaremaa and Vormsi.
The measure consists of the signature of contracts on designing air surveillance radars and passive
radar systems, construction works for radar buildings and the removal of height restriction on
offshore wind turbines.
6468/26 ADD 1 32
ANNEX ECOFIN 1A EN
D.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
63 4.1 Energy Milestone Conclusion of the Conclusion of the Q4 2022 Conclusion of a cooperation agreement by
efficiency cooperation agreement cooperation SA KredEx/Enterpise Estonia with county
promotion stipulating conditions agreement development centers by which in each
for cooperation between between SA county of Estonia SA KredEx/Enterpise
SAKredEx/Enterprise KredEx/ Estonia shall provide at least one trained
Estonia and county Enterpise Estonia specialist in the county development
development centers and county centre who shall provide advice on
development renovation.
centers
65 4.2 Support for the Milestone Publication of calls for Publication of Q2 2022 SA KredEx/Enterprise Estonia shall
renovation of applications for calls for housing publish calls for applications aimed at
multi-apartment residential apartment renovation grants improving the energy efficiency of
buildings buildings renovation residential apartment buildings. The
grants support shall be differentiated between
regions on the basis of the value of the
real estate, with a higher rate of support
in regions with low average property
value.
Support shall be granted to renovation
projects that achieve an improvement of at
least one energy efficiency class or, in the
case of complete renovations, at least the
energy efficiency class C. The
renovations shall correspond to at least
medium-depth renovations representing an
average level of primary energy savings
of at least 30% as set out in European
Commission Recommendation (EU)
2019/786. The results shall be certified
by ex-ante and ex-post Energy
Performance Certificates.
6468/26 ADD 1 33
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
66 4.2 Support for the Target Multi-apartment Number of 0 80 Q2 2026 The renovations of at least 80 multi-
renovation of buildings with improved multi- apartment buildings shall result in an
multi-apartment energy performance apartment average level of primary energy savings
buildings buildings of at least 30%. The results shall be
certified by ex-ante and ex post
(calculated) Energy Performance
Certificates of the building.
68 4.3 Support for the Milestone Published calls for Publication of Q2 2022 SA KredEx/Enterprise Estonia shall
renovation of small renovation grant calls publish calls for applications aimed at
residential improving the energy efficiency of
buildings private residential buildings. The support
shall be differentiated between regions
on the basis of the value of the real
estate, with a higher rate of support in
regions with low average property value.
Support shall be granted to renovation
projects that achieve an improvement of
energy efficiency or, in the case of
complete renovations, at least the energy
efficiency class C. The results shall be
certified by ex-ante and ex-post SA
KredEx Energy Performance
calculations.
69a 4.3 Support for the Target Small residential Number of 0 900 Q1 2026 At least 900 small residential buildings
renovation of small buildings with improved small shall be renovated and achieve an
residential energy performance residential increase in energy efficiency or, in the
buildings buildings case of complete renovations, at least the
energy efficiency class C. The results
shall be certified by ex-ante and ex-post
KredEx Energy Performance
calculations.
6468/26 ADD 1 34
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
70 4.4 Boosting the Milestone Government decision on Adoption of the Q2 2021 The Government shall adopt a decision
green transition in investments needed to decision of the on making the necessary investments to
the energy alleviate the defence Government alleviate the defence related height
economy related height restrictions on wind parks.
restrictions on wind
parks
71 4.4 Boosting the Milestone Adoption of the decision Adoption of the Q4 2021 Government decision on initiating the
green transition in of the Government on decision of the preparation process of the National
the energy the initiation of the Government Development Plan of the Energy Sector
economy preparation process of shall be approved, defining the
the National responsible entity (ies) and setting the
Development Plan of the relevant deadlines. The development plan
Energy Sector, the shall address, inter alia, the objectives of
designation of those increasing renewable energy production,
responsible and energy efficiency and maintaining and
deadlines improving security of supply, as well as the
cessation of the use of oil shale for
electricity production in 2035 and the
phasing out of shale oil production by
2040.
72 4.4 Boosting the Milestone Entry into force of legal Legal act entered Q4 2024 Legal acts shall enter into force to
green transition in acts into force remove the barriers to installation of
the energy renewable energy generation and storage
economy facilities for example streamlining
permitting procedures.
6468/26 ADD 1 35
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
73 4.4 Boosting the Milestone Adoption of the Document Q4 2025 The National Development Plan of the
green transition in National Development adopted by the Energy Sector shall be adopted by the
the energy Plan of the Energy Government Government. The plan shall include the
economy Sector by the actions related to the phase-out of direct
Government burning of oil shale for electricity
production by 2035 with an exception for
out-of-market oil shale for potential
strategic reserve needs in case of
deviation from the reliability standard. The
plan shall include actions related to the
phase-out of the use of shale oil in
domestic heat production by 2040. It
shall also include targets for electricity
generation capacity to be replaced with
renewable energy and other clean energy
technologies.
74 4.5 Programme to Milestone Signature of network Signature of a Q1 2022 A co-financing agreement for electricity
increase the investment co-financing contract with the network investments shall be concluded
capacity of the contract with transmission between the Ministry of Economic
electricity transmission system system operator Affairs and Communications and Elering
transmission operator AS. The contract shall set out the
network expected results and deadlines.
75 4.5 Programme to Target Additional grid capacity Additional 0 310 Q2 2026 Increase in the capacity of the Estonian
increase the grid electricity transmission network by at
capacity of the capacity least 310 MW.
electricity (MW)
transmission
network
6468/26 ADD 1 36
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
76 4.6 Programme to Milestone Publication of a call for Call for Q4 2022 An open call shall be published by the
boost energy proposals for projects proposals Environmental Investment Centre to
production in boosting energy published support the grid connection costs of
industrial areas production in industrial companies producing electricity from
sites renewable sources in industrial sites. The
call shall be based on project selection
criteria and award conditions that ensure
that the selected projects comply with
the‘Do no significant harm’ Technical
Guidance (2021/C58/01) through the use
of an exclusion list and the requirement
of compliance with the relevant EU and
national environmental legislation.
77 4.6 Programme to Target Additional connection Connection 0 28 Q2 2026 Additional connection capacity for
boost energy capacity for renewable capacity renewable electricity production in or
production in electricity production created near industrial sites constructed for at
industrial areas (MW) least 28 MW as specified in the
confirmation letter from the network
company.
6468/26 ADD 1 37
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
78 4.7 Pilot Energy Milestone Publication of a call for Call for Q4 2022 An open call for proposals shall be
Storage proposals for a pilot proposals published by the Environmental
Programme energy storage published Investment Centre to support energy
programme storage projects.
The call shall be based on project
selection criteria and award conditions
that ensure that the selected projects
comply with the‘Do no significant
harm’Technical Guidance
(2021/C58/01) through the use of an
exclusion list and the requirement of
compliance with the relevant EU and
national environmental legislation. The
selection/eligibility criteria shall specify
that the supported activities and/or
enterprises contribute to climate-neutral
economy, climate resilience and climate
change adaptation, including circular
80 4.7 Pilot Energy Milestone Additional heat and Additional Q2 2026 economy
The objectives.
investment support scheme shall
Storage electricity storage energy storage result in the installation of at least 23 600
Programme capacity resulting from capacity m³ heat storage capacity and at least 10
investment support MW of electricity storage capacity.
80a 4.8 Boosting Milestone Contractors for the radar Contracts signed Q4 2024 Contracts signed for the detailed design
offshore wind and passive radar of air surveillance radar, passive radar
farms development systems selected and systems and construction works for radar
contracts signed buildings.
80c 4.8 Boosting Milestone Removal of the height Notice Q2 2026 Notice issued by the Ministry of
offshore wind restriction on offshore Defence, stating that the height
farms development wind turbines in the Gulf restrictions on offshore wind turbines have
of Riga and Estonian been lifted in the Gulf of Riga and
islands Hiiumaa, Estonian islands of Hiiumaa, Saaremaa
Saaremaa, Vormsi and Vormsi.
6468/26 ADD 1 38
ANNEX ECOFIN 1A EN
E. COMPONENT 5: SUSTAINABLE TRANSPORT
The component of the Estonian recovery and resilience plan aims at addressing the challenge of
decarbonising the transport sector. The objectives of the component are to reduce emissions and
incentivise the uptake of sustainable modes of transport.
The reform and investments of the component support the development of the cross-border Rail
Baltic project, connecting the three Baltic capitals and countries with Poland and the rest of the
Union. The measures in the component aim at connecting the Rail Baltic with other national
railways and other TEN-T hubs (Tallinn Airport and Old Port) and facilitating access to its local
stops on foot or by bicycle.
The component supports addressing the Country Specific Recommendation to focus investments on
resource efficiency and sustainable transport contributing to decarbonisation of the economy
(Country Specific Recommendation 3 in 2019 and in 2020). The new measures also correspond to
the Country Specific Recommendation to intensify efforts to improve the sustainability of the
transport system, including through electrification of the rail network and by increasing incentives
to encourage sustainable and less polluting transport (Country Specific Recommendation 4 in
2022).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
E.1. Description of the reforms and investments for non-repayable financial support
5.1. Reform: Safe, green, competitive, needs-based and sustainable transport and energy
infrastructure
The objective of the reform is to reduce the CO2 emissions of the transport sector and incentivise
the uptake of sustainable modes of transport.
The measure consists of the adoption of the new Transport and Mobility Development Plan and the
related Implementation Plan to reduce the CO2 emissions and reach a share of renewables in the
energy consumed in the transport sector of 24% by 2035.
5.2. [deleted]
5.2.a Investment: Multifunctional work vessel
The objective of the investment is to ensure the safety and condition of the waterways necessary for
the operation of maritime transport, enable anti-pollution operations to be carried out and increase
research capacity for environmental studies.
The investment consists in building a low-emission vessel.
5.3.a Investment: Construction of the Rail Baltic viaducts and terminal
The objective of the measure is to increase the share of sustainable mobility in Estonia and to
contribute to the Rail Baltic project, which connects the three Baltic States.
The investment consists of the construction of four viaducts and one tunnel, as well as construction
of the Rail Baltic Ülemiste terminal.
6468/26 ADD 1 39
ANNEX ECOFIN 1A EN
The RRF shall support part of the costs of this investment. This investment may also receive
support from other Union programmes or instruments for costs that are not supported by the RRF.
5.3.b Investment: Renovation of a section of the railway from Rapla to Lelle
The objective of the measure is to increase the lifespan of Estonia’s sustainable mobilty network.
The investment consists of renovating the railway superstructure of a 23 km long section of existing
railway from Rapla to Lelle.
5.4. Investment: Construction of the Tallinn Old Port tram line
The objective of the measure is to increase the share of sustainable mobility in the Tallinn region.
The investment consists of constructing a new tramline.
5.5 Investment: Municipalities’ investments in bike- and walkways
The objective of the measure is to reduce car dependency and increase sustainable mobility in areas
outside the three major urban centres (Tallinn, Tartu, Pärnu).
The investment consists of construction works for bike- and walkways.
6468/26 ADD 1 40
ANNEX ECOFIN 1A EN
E.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone
(Reform or Name indicators (for completion
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
81 5.1 Safe, green, Milestone Adoption of the Adoption of the Q1 2022 The Transport and Mobility
competitive, needs- Transport and Transport and Development Plan 2021-2035 shall be
based and Mobility Mobility approved by the Government. It shall
sustainable transport Development Plan Development Plan include the creation of the Tallinn
and energy 2021-2035 by the 2021-2035 capital region common transport
infrastructure Government system, actions to facilitate uptake of
local biomethane, actions to develop
sustainable and active urban
mobility in bigger towns following
the logic of integrated transport
corridors, planning multimodal
infrastructure, increasing the
connections, speed and safety of rail,
making the maritime transport sector
more competitive and greener and
connect it multimodally, developing
faster and safer road transport.
The plan shall include a target to
reduce CO2 emissions by 700 000
tons (or 30%) compared to 2018
levels and reach a share of
renewables in the energy consumed
in the transport sector of 24% by
2035.
6468/26 ADD 1 41
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone
(Reform or Name indicators (for completion
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
82 5.1 Safe, green, Milestone Adoption of the Adoption of the Q4 2022 The implementation plan shall be
competitive, needs- Implementation Plan Implementation Plan approved by the Steering Committee
based and for green sustainable of the Transport and Mobility
sustainable transport public transport Development Plan 2021-2035. It
and energy development of the shall include the creation of the
infrastructure Transport and Tallinn capital region common
Mobility transport system, actions to facilitate
Development Plan uptake of local biomethane, actions to
2021-2035 develop sustainable and active urban
mobility in bigger towns following
the logic of integrated transport
corridors, planning multimodal
infrastructure, increasing the
connections, speed and safety of rail,
making the maritime transport sector
more competitive, greener and
connect it multimodally, developing
faster and safer road transport. The
implementation plan shall include an
annual reporting obligation on the
responsible minister to the
Government.
84a 5.2.a Multifunctional Milestone Contract signed for Contract signed Q1 2024 The contract for the building of the
work vessel building of the vessel multifunctional work vessel shall be
signed by the contractor and the
National Fleet (Riigilaevastik). The
contract shall include a specification
of the fuel to be used by the vessel in
line with‘DoNo Significant
Harm’requirements set out in the
description of the investment.
85a 5.2.a Multifunctional Milestone Multifunctional work Vessel built Q2 2026 The multifunctional work vessel
work vessel vessel built shall be built.
6468/26 ADD 1 42
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone
(Reform or Name indicators (for completion
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
86a 5.3.a Construction of Milestone Works contracts for Works contracts Q3 2023 Works contracts signed for the
the Rail Baltic the construction of signed following Rail Baltic viaducts:
viaducts and Rail Baltic viaducts Kangru viaduct, Raudalu viaduct,
terminal Raku viaduct, Männiku light traffic
viaduct and Männiku light traffic
tunnel.
87a 5.3.a. Construction Milestone Viaducts constructed Acceptance Q2 2026 Certificates of acceptance shall be
of the Rail Baltic and disbursement certificates issued for issued for the construction of the
viaducts and made for the construction of Kangru viaduct, Raudalu viaduct,
terminal construction work of the viaducts and Raku viaduct, Männiku light traffic
terminal disbursement made viaduct and Männiku light traffic
tunnel.
At least EUR 8.84 million shall be paid
towards the construction of
theÜlemiste terminal. Any amounts
provided by other Union
programmes or instruments shall not
be counted towards this amount.
88b 5.3b Renovation of a Milestone Renovation of Certificate of Q1 2026 Certificate of acceptance for the
section of the railway section acceptance renovation of 23 km of railway in the
railway from Rapla section Rapla to Lelle.
to Lelle
89 5.4 Construction of Milestone Completion ofthe Approval of the Q4 2021 Tallinn Urban Planning and Utilities
the Tallinn Old Port tramway projectdesign Board shall adopt the design of the
tram line construction project tramway construction project.
design
90 5.4 Construction of Milestone Award of works Contract signed for Q2 2022 Works contract concluded between
the Tallinn Old Port contract the construction of Tallinn Urban Planning and Utilities
tram line the tramway line Board and the contractor for the
construction of the tramway line
between Gonsiori street and Põhja
Puiestee.
6468/26 ADD 1 43
ANNEX ECOFIN 1A EN
Quantitative indicators (for Indicative
Related Measure Qualitative targets) timeline for
Sequential Milestone Description of each milestone
(Reform or Name indicators (for completion
Number /Target and target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
91 5.4 Construction of Milestone New tramway line New tramway line in Q4 2025 New 2 500m section of tramway line
the Tallinn Old Port operation in operation as confirmed by the
tram line permit to operate.
92 5.5 Milestone Call for proposals for Publication of the Q4 2022 An open call for investment by
Municipalities’invest grants notice for call for municipalities in bike- and walkways
ments in bike- and proposals for grants shall be published.
93 walkways
5.5 Municipalities’ Target Construction works Construction 0 18 Q4 2025 At least 18 construction works of
investments in bike- on bike- and works bike and walkways shall be
and walkways walkways delivered delivered.
6468/26 ADD 1 44
ANNEX ECOFIN 1A EN
F. COMPONENT 6: HEALTHCARE AND SOCIAL PROTECTION
This component of the Estonian recovery and resilience plan aims to address the challenges related
to the resilience of and access to the health care system, the adequacy of the social safety net,
accessibility of social services and youth unemployment. The objectives of the measures included in
the component are to: address workforce shortages in the health sector, strengthen primary and
hospital care, extend the duration of the unemployment insurance benefit in periods of high
unemployment, improve access to social services, address youth unemployment and reduce the
gender pay gap.
The component supports addressing the Country Specific Recommendation, on improving the
accessibility and resilience of the health system, including by addressing the shortages of health
workers, strengthening primary care and ensuring the supply of critical medical products (Country
Specific Recommendation 1 in 2020), on improving the social safety net, increasing access to social
services in an integrated way (Country Specific Recommendation 2 in 2019, Country Specific
Recommendation 2 in 2020 and Country Specific Recommendation 3 in 2022) and on reducing the
gender pay gap, including by improving wage transparency (Country Specific Recommendation 2
in 2019).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
F.1. Description of the reforms and investments for non-repayable financial support
6.1. Reform: A comprehensive change in the organisation of health care in Estonia
The objective of the reform is to support the resilience of the Estonian health system, including for
coping with crises, thus ensuring that people have access to high-quality, integrated healthcare
throughout Estonia.
The measure consists of reforms
a. to consolidate the hospital network,
b. to outline the provision of health services in the various health sectors,
c. to incentivise doctors, nurses and pharmacists to work in remote areas, and
d. to increase the admission in medical professions with shortages.
6.2. [deleted]
6.2.a Investment: Construction of TERVIKUM
The objective of the investment is to contribute to improving the access to health care as well as the
provision of health and social care in an integrated way.
The investment consists of building a new health centre in the city of Viljandi.
6.3. Reform: Strengthening primary health care
The objective of the reform is to ensure access to general medical care, improve the continuity of
treatment and make provision of primary health care more flexible and human-centred. The reform
consists of three sub-measures. First, in order to improve access to specialist care the use of e-
consultation in primary care was extended on 30 September 2020 allowing patients to be advised by a
specialist without having to consult them face-to-face. Second, legislation entered into force on 31
6468/26 ADD 1 45
ANNEX ECOFIN 1A EN
March 2021 improving access to health care by increasing the level of support for general
practitioners and by modifying the funding model for general medical care with a view to making
working in primary health centres in remote areas more attractive. Third, the Health Services
Organisation Act shall be amended as regards the management of the list of patients, ensuring
continuity of primary care and extending the rights of nurses to prescribe medicines to patients.
The implementation of the reform shall be completed by 31 March 2023.
6.4. Reform: Renewal of the eHealth Governance
The objective of the reform is to update the governance framework for eHealth with a view to better
responding to the needs of the health system and ensure the development of digital solutions to
support a sustainable health system in Estonia. The reform consists of adopting a revised national
governance model for information and communication technology of the current health system to
provide a forward-looking new eHealth governance model and promote a common understanding
among partners of the division of roles and responsibilities in eHealth.
The implementation of the reform shall be completed by 30 June 2023.
6.5. [deleted]
6.6. Investment: Providing labour market measures to reduce youth unemployment
The objective of the investment is to help young people get into employment.
The measure consists of a legislation on the renewed“M yfirst job” (M1T) scheme; support for the
enrolement in labour market related measures, and a reinforced Youth Guarantee Action Plan.
6.7. Reform: Extending the duration of unemployment insurance benefits
The objective of the reform is to address the long-standing challenge of improving the adequacy of
the social safety net. The reform consists of the establishment of a mechanism to activate the
extension of the period of the unemployment insurance benefits by 60 days, notably when the
registered unemployment rate exceeds the non-accelerating inflation/wage rate of unemployment
(NAIRU/NAWRU) by a significant margin. The mechanism of prolongation and the margin, which
shall not be higher than 2%, shall be agreed upon in dialogue with the social partners. The measure
aims at helping people to bridge a longer period of unemployment in difficult labour market
conditions.
The reform shall be implemented by 30 June 2023.
6.8. Reform: Long-term care
The objective of the reform is to support the provision of long-term care.
The reform consists of legislative amendments to define the concept of long-term care, to provide
for the modernisation and integration of services for children with higher care needs, and an Action
plan for integrated social and health care.
6.9. Reform: Reducing gender pay gap
The objective of the reform is to reduce the gender pay gap. The reform consists of the adoption of
the Welfare Development Plan for 2023-2030 and its implementation and the roll out of a digital
gender pay gap tool. The Welfare Development Plan shall be adopted by 31 March 2024 and it shall
6468/26 ADD 1 46
ANNEX ECOFIN 1A EN
lay down the strategic objectives of reducing social inequalities and poverty, ensuring gender
equality and greater social inclusion, and promoting equal treatment of persons belonging to
minority groups. The Development Plan shall outline measures to reduce the gender pay gap, in
particular by increasing wage transparency, reducing the prevalence and negative impact of gender
stereotypes on the lives and decisions of women and men, including concerning educational and
career choices and carrying the care burden, and supporting a more effective implementation of the
Gender Equality Act. A digital gender pay gap tool shall be rolled out by 31 March 2024 which
shall offer employers a simple and easy tool to receive and analyse data and information concerning
the gender pay gap and its possible reasons in their organisations and thereby supporting them in
making informed decisions and taking effective action to implement the principle of equal pay and
to reduce the gender pay gap.
The implementation of the reform shall be completed by 31 March 2024.
6468/26 ADD 1 47
ANNEX ECOFIN 1A EN
F.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Indicative timeline for
Related Measure Qualitative Quantitative indicators (for targets)
Sequential Milestone completion Description of each
(Reform or Name indicators (for
Number /Target Unit of milestone and target
Investment) milestones) Baseline Goal Quarter Year
measure
94 6.1 A comprehensive Milestone Entry into force of Entry into force of Q4 2024 Entry into force of the
change in the theGovernment theGovernment Government Order which shall
organisation of health Order on the Order lay down:
care in Estonia Hospital network - the list of regional, central,
development local and rehabilitation hospitals
roadmap in order to ensure equal access to
health care services;
- objectives and steps to be taken
for consolidating the hospital
network;
- the necessary investments for
the construction and renovation
of the hospitals included in the
list of hospitals.
95 6.1 A comprehensive Milestone Approval of the Approval of the Q4 2022 The Strategic Framework for
change in the Strategic Framework Strategic addressing health workforce
organisation of health for addressing health Framework for shortages shall outline:
care in Estonia workforce shortages addressing health - measures on the organisation of
workforce health care services in the
shortages bythe different health sectors, in
Minister of Health particular specialised care,
and Labour - allocation of physical and
human resources to ensure the
provision of health care
throughout the territory,
- financing, governance and
information exchange
mechanisms that ensure
performance throughout the
country.
6468/26 ADD 1 48
ANNEX ECOFIN 1A EN
Indicative timeline for
Related Measure Qualitative Quantitative indicators (for targets)
Sequential Milestone completion Description of each
(Reform or Name indicators (for
Number /Target Unit of milestone and target
Investment) milestones) Baseline Goal Quarter Year
measure
96 6.1 A comprehensive Milestone Entry into force of Entry into force of Q1 2023 Entry into force of the Decrees
change in the the Decrees of the the Decrees of the of the Minister of Health and
organisation of health Minister of Health Minister of Health Labour which shall improve the
care in Estonia and Labour and Labour reimbursement system for
amending the doctors and pharmacists to
reimbursement incentivise the health workforce
system for doctors to work in remote areas.
and pharmacists
96a 6.1 A comprehensive Milestone Entry into force of the Entry into force of Q2 2024 Entry into force of the Decree
change in the Decree of the Minister the Decree of the of the Minister of Health and
organisation of health of Health and Labour Minister of Health Labour and the amendment to the
care in Estonia and the amendment to and Labour and of Health Services Organisations
the Health Services the amendment to the Act which shall establish the
Organisations Act Health Services reimbursement system for
establishing the Organisations Act nurses to incentivise them to
reimbursement work in remote areas. This
system for nurses reimbursement system shall
cover general and advanced
practice nurses, in primary
health care and hospitals.
97 6.1 A comprehensive Target Admission to Percentage 0 5 Q4 2023 The admission of persons to
change in the nursing training increase in the nursing training has been
organisation of health number of increased by 5% compared to
care in Estonia persons 2020.
admitted to
nursing training
6468/26 ADD 1 49
ANNEX ECOFIN 1A EN
Indicative timeline for
Related Measure Qualitative Quantitative indicators (for targets)
Sequential Milestone completion Description of each
(Reform or Name indicators (for
Number /Target Unit of milestone and target
Investment) milestones) Baseline Goal Quarter Year
measure
98 6.1 A comprehensive Milestone Entry into force of Entry into force of Q2 2026 Entry into force of the
change in the the Ministerial the Ministerial Ministerial Regulation
organisation of health Regulation Regulation and amending the agreement
care in Estonia amending the agreement between between the Ministry of Social
agreement between the Ministry of Affairs and the University of
the Ministry of Social Affairs and Tartu which shall lay down the
Social Affairs and the theUniversityof requirements for the gradual
University of Tartu increase of admission in medical
Tartu on the shortage professions with shortages.
of doctors in certain
specialisations
99a 6.2.a Construction of Milestone Signature of the Signature of the Q2 2023 The Riigi Kinnisvara AS (the
TERVIKUM contract for the contract representative of the Viljandi
construction of Haigla) and the contractor shall
TERVIKUM sign a contract for the
construction of TERVIKUM,
including the installation of the
technical building systems, in
particular the technical
equipment for heating, cooling,
ventilation, hot water, lighting
and electricity production,
measurement, monitoring and
control systems and interior
works.
100a 6.2.a Construction of Milestone TERVIKUM TERVIKUM Q4 2025 The TERVIKUM, consisting of
TERVIKUM constructed constructed a general hospital and health
care centre, shall be
constructed.
6468/26 ADD 1 50
ANNEX ECOFIN 1A EN
Indicative timeline for
Related Measure Qualitative Quantitative indicators (for targets)
Sequential Milestone completion Description of each
(Reform or Name indicators (for
Number /Target Unit of milestone and target
Investment) milestones) Baseline Goal Quarter Year
measure
106 6.3 Strengthening Milestone Entry into force of the Entry into force of Q3 2020 Entry into force of legislative
primary health care Decree of the legislative amendments which shall
Government, which amendments to the improve the access to
amends the list of Decree of the specialised care by extending the
health care services Government use of e-consultation in primary
of the Estonian care allowing patients to be
Health Insurance advised by a specialist without
Fund on access to having to consult them face-to-
specialised medical face.
care
107 6.3 Strengthening Milestone Entry into force of Entry into force of Q1 2021 Legislative amendments shall
primary health care amendments to the the legislative enter into force providing for the
Decree of the amendments to the financing of fixed costs and
Government which Decree of the services for general
amends the list of Government practitioners in order to increase
health care services the allocation of resources to
of the Estonian primary medical practice
Health Insurance outside metropolitan areas,
Fund on costs and especially in remote areas, and
services of general to increase patients’ access to
practitioners diagnostic and screening
services.
108 6.3 Strengthening Milestone Entry into force of Provision in the law Q1 2023 Entry into force of the
primary health care amendments to the indicating the entry amendments to Health Services
Health Services into force of the Organisation Act which shall
Organisation Act law amend the management of the list
of patients, ensure continuity of
primary care and extend the
rights of nurses to prescribe
medicines to patients.
6468/26 ADD 1 51
ANNEX ECOFIN 1A EN
Indicative timeline for
Related Measure Qualitative Quantitative indicators (for targets)
Sequential Milestone completion Description of each
(Reform or Name indicators (for
Number /Target Unit of milestone and target
Investment) milestones) Baseline Goal Quarter Year
measure
109 6.4 Renewal of the Milestone Approval of the Approval of the Q2 2023 Approval of the proposal on the
eHealth Governance eHealth Governance proposal on the Governance Framework and
Framework and its eHealth implementation roadmap which
implementation Governance shall update the governance
roadmap Frameworkand framework for eHealth and the
implementation coordination of the
roadmap by the development of eHealth
Steering services.
Committee of
the“Eesti tervise
IKT juhtimise
raamistik”
113 6.6 Providing labour Milestone Entry into force of Entry into force of Q1 2022 Entry into force of the Decree
market measures to the Decree of the the Decree of the of the Minister of Health and
reduce youth Minister of Health Minister of Health Labour which shall define the
unemployment and Labour to and Labour characteristics of the scheme
strengthen the “My and the conditions for its
First Job” scheme implementation, including
financing and target group. The
aim of the scheme shall be to
enable young people without
work experience or with little
work experience to gain work
experience and to improve their
skills to participate in the labour
market.
6468/26 ADD 1 52
ANNEX ECOFIN 1A EN
Indicative timeline for
Related Measure Qualitative Quantitative indicators (for targets)
Sequential Milestone completion Description of each
(Reform or Name indicators (for
Number /Target Unit of milestone and target
Investment) milestones) Baseline Goal Quarter Year
measure
114 6.6 Providing labour Milestone Youth Guarantee Adoption ofthe Q2 2022 The Government shall adopt an
market measures to Action Plan reinforced Youth amended Youth Guarantee
reduce youth youth Guarantee Action Action Plan to support youth
unemployment Plan by the employment. This action plan
Government shall
- include measures to improve
the skills of young people,
- define actions to prevent and
address youth unemployment,
including outreach and
prevention of NEET-situation -
define key parties and their
roles of preventing and dealing
with youth unemployment.
115 6.6 Providing labour Target Number of young Number of 0 3 178 Q4 2025 At least 3 178 young people
market measures to people enrolled in participants aged 15-29 have been enrolled
reduce youth labour market related in labour market related
unemployment measures measures, of which at least
2 000 in the“MyFirst
Job”scheme.
6468/26 ADD 1 53
ANNEX ECOFIN 1A EN
Indicative timeline for
Related Measure Qualitative Quantitative indicators (for targets)
Sequential Milestone completion Description of each
(Reform or Name indicators (for
Number /Target Unit of milestone and target
Investment) milestones) Baseline Goal Quarter Year
measure
116 6.7 Extending the Milestone Entry into force of Entry into force of Q2 2023 Entry into force of the
duration of the amendments to the legislative amendments to the Act which
unemployment the Unemployment amendments shall lay down a permanent
insurance benefits Services and mechanism to activate the
Benefits Act and the extension of the duration of
Unemployment unemployment insurance
Insurance Act benefits by 60 days, notably
when the registered
unemployment rate exceeds the
non-accelerating inflation/wage
rate of unemployment by a
significant margin. The
mechanism of prolongation and
the margin, which shall not be
higher than 2%, shall be agreed
upon in dialogue with the social
partners.
117 6.8 Long-term care Milestone Entry into force of Entry into force of Q2 2022 Entry into force of legislative
amendments to the legislative amendments to the Social
Social Welfare Act amendments Welfare Act which shall lay
down the concept of long-term
care and require local
authorities to take into account
the principle that a person must
be able to live as long as
possible in his or her home, in his
or her usual environment, with
sufficient quality services
available.
6468/26 ADD 1 54
ANNEX ECOFIN 1A EN
Indicative timeline for
Related Measure Qualitative Quantitative indicators (for targets)
Sequential Milestone completion Description of each
(Reform or Name indicators (for
Number /Target Unit of milestone and target
Investment) milestones) Baseline Goal Quarter Year
measure
118 6.8 Long-term care Milestone Action Plan on an Adoption of the Q4 2022 The Ministry of Social Affairs
integrated care Action Plan shall adopt an Action Plan that
model provides for the establishment
of an integrated care model
throughout Estonia and the
roles and responsibilities of the
actors involved in the future
financing model of the system.
120 6.8 Long-term care Milestone Entry into force of Entry into force of Q1 2025 Entry into force of the legal act
the legislative the legislative which shall provide for the
amendments of the amendments modernisation and integration
support system for of services for children with
children with higher higher care needs. In particular,
care needs - services in the health,
education, social protection and
employment areas shall be
integrated in order to provide
support for families under care
burden, and
- the current support system
shall be simplified and the
assessment of care needs
consolidated.
121 6.9 Reducing gender Milestone Adoption of the Adoption ofthe Q1 2024 The Plan shall outline the
pay gap Welfare Welfare measures to reduce the gender
Development Plan Development Plan pay gap.
2023-2030 by the
government
6468/26 ADD 1 55
ANNEX ECOFIN 1A EN
Indicative timeline for
Related Measure Qualitative Quantitative indicators (for targets)
Sequential Milestone completion Description of each
(Reform or Name indicators (for
Number /Target Unit of milestone and target
Investment) milestones) Baseline Goal Quarter Year
measure
122 6.9 Reducing gender Milestone Digital gender pay Developing a Q4 2022 A prototype of a gender pay gap
pay gap gap tool prototype of a tool for employers shall be
gender pay gap developed with the aim of
tool providing them with data and
information concerning the
gender pay gap and its possible
reasons in their organisations
and thereby supporting making
informed decisions and taking
effective action in order to
implement the principle of
equal pay and to reduce the
gender pay gap.
123 6.9 Reducing gender Milestone Digital gender pay Roll-out of a Q1 2024 The digital gender pay gap tool
pay gap gap tool digital gender pay shall be available to employers
gap tool with the aim of providing them
with data and information
concerning the gender pay gap
and its possible reasons in their
organisations and thereby
supporting making informed
decisions and taking effective
action in order to implement the
principle of equal pay and to
reduce the gender pay gap.
6468/26 ADD 1 56
ANNEX ECOFIN 1A EN
G. AUDIT AND CONTROL
G.1. DESCRIPTION OF THE REFORMS AND INVESTMENTS FOR NON-REPAYABLE FINANCIAL
SUPPORT
The objective of the reform is to set the legal framework for the implementation and monitoring of
the recovery and resilience plan. It shall define the roles played by relevant public entities in the
implementation of the plan and how these bodies shall carry out their tasks.
The implementation of the reform shall be completed by 31 December 2021.
6468/26 ADD 1 57
ANNEX ECOFIN 1A EN
G.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Quantitative indicators (for targets) Indicative
Related Measure Qualitative timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
124 Monitoring and Milestone Entry into force of the Entry into force of Q4 2021 Entry into force of the regulation
implementation of Government government establishing the legal framework for the
the plan Regulation onthe legal regulation implementation and monitoring of the
framework for the recovery and resilience plan of Estonia
implementation and before the first payment request is
monitoring of the made. The regulation shall at least
recovery and define the authorities involved in the
resilience plan of implementation of the recovery and
Estonia. resilience plan of Estonia and their
tasks including the tasks of the Ministry
of Finance, the sectoral ministries and
the State Shared Service Center.
6468/26 ADD 1 58
ANNEX ECOFIN 1A EN
H. COMPONENT 8: REPOWEREU
The REPowerEU chapter addresses the challenge of reducing reliance on fossil fuels. The
objectives of the component are to facilitate the deployment of renewable energy sources; to
facilitate decarbonising selected economic sectors; to increase the capacity of the electricity
distribution network; to boost the uptake of sustainable biomethane and to accelerate the integration
of renewable energy sources.
The REPowerEU chapter supports addressing the Country Specific Recommendation to reduce
overall reliance on fossil fuels by accelerating the deployment of renewables, including through
further streamlining of permitting procedures and strengthening the domestic electricity network
(Country Specific Recommendation 4 in 2022).
It is expected that no measure in this component does significant harm to environmental objectives
within the meaning of Article 17 of Regulation (EU) 2020/852, taking into account the description
of the measures and the mitigating steps set out in the recovery and resilience plan in accordance
with the‘Dono significant harm’ Technical Guidance (2021/C58/01).
The implementation of the measure facilitating the deployment of renewable energy sources, the
measure to increase the access of renewable energy production to the electricity distribution
network and the measure increasing production and uptake of sustainable biomethane are all
expected to contribute to reducing dependency on fossil fuels. Increasing the share of renewable
energy sources has a cross-border or multi-country dimension, especially in the Baltic region and
Finland, because it contributes to securing the energy supply in the Union as a whole. Less
dependency on imported fossil fuels will also create European added value as it will free up supply
for other Member States, in the current situation of natural gas supply constraints, and until other
Member States succeed in reducing their dependency on fossil fuels.
H.1. Description of the reforms and investments for non-repayable financial support
8.1 Reform: Facilitating the development of renewable energy sources
The objective of the reform is to facilitate the development of renewable energy sources, notably
wind energy.
The reform consists of legislative amendments to streamline planning, permitting and
environmental impact assessment processes for wind energy projects; the establishment of wind
priority development areas; support to local authorities to improve administrative procedures,
including permitting, for wind energy development.
8.2. Investment: Programme to increase the access of renewable energy production to the
electricity distribution network
The objective of the investment is to facilitate the use/development of electricity from renewable
energy sources.
The investment consists of works in the electricity network to increase its capacity.
8.3. Investment: Increasing production and uptake of sustainable biogas and biomethane
The objective of this measure is to boost the uptake of sustainable biogas and sustainable
biomethane and to accelerate the integration of renewable energy sources.
6468/26 ADD 1 59
ANNEX ECOFIN 1A EN
The investment consists of an action plan for increasing the production and use of sustainable
biogas and sustainable biomethane, and support for the uptake of sustainable biomethane.
6468/26 ADD 1 60
ANNEX ECOFIN 1A EN
H.2. Milestones, targets, indicators, and timetable for monitoring and implementation for non-repayable financial support
Quantitative indicators (for targets) Indicative
Related Measure Qualitative timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
125 8.1 Facilitating the Milestone Publication ofthe call Publication of the Q3 2023 A call for proposals shall be published
development of for proposals to call for proposals to support local authorities to hire
renewable energy support local experts or procure services aimed at
sources authorities improving administrative procedures,
including permitting, for wind energy
development.
126 8.1 Facilitating the Milestone Entry into force of Entry into force of Q2 2024 Legislative amendments to streamline
development of the amendments to the amendments permitting, planning and environmental
renewable energy the relevant laws impact assessment processes for wind
sources streamlining energy projects shall enter into force.
permitting, planning These shall include amending the
and environmental following laws to the extent necessary:
impact assessment the Building Code, the Water Act, the
processes Planning Act, the Environmental
Impact Assessment and Environmental
Management System Act, the
Environmental Charges Act and the
Forest Act.
127 8.1 Facilitating the Milestone Governmental Governmental Q3 2024 The government shall adopt a decision
development of decision establishing decision adopted establishing priority areas for wind
renewable energy priority development energy development. The government
sources areas for wind shall adopt the decision on the basis of
energy a technical report.
128 8.1 Facilitating the Target Support to local Number of 0 20 Q1 2025 Following the call for proposals set out
development of authorities local authorities in milestone 125 or through the use of
renewable energy supported centrally procured services, 20 local
sources authorities shall have received support to
improve administrative procedures,
including permitting, for wind energy
development.
6468/26 ADD 1 61
ANNEX ECOFIN 1A EN
Quantitative indicators (for targets) Indicative
Related Measure Qualitative timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
129 8.2 Programme to Milestone Signature of the co- Signed agreement Q1 2024 Signature of the co-financing
increase the access financing agreement agreement, for electricity distribution
of renewable for electricity network works, between the Ministry
energy production distribution network of Economic Affairs and
tothe electricity works Communications and Elering AS for
distribution the purpose of increasing the capacity
network of the electricity distribution network
by 160 MW.
130 8.2 Programme to Target Additional 160 MW MW of 0 160 Q1 2026 Electricity distribution network works
increase the access capacity available additional shall result in an increase in the
of renewable capacity capacity of the electricity distribution
energy production available network of 160 MW.
tothe electricity
distribution
network
131 8.3 Increasing Milestone Call for applications Call for Q2 2024 Publication of a call for applications for
production and for grants to support applications grants to support the uptake of
uptake of the uptake of published sustainable biomethane in line with the
sustainable biogas biomethane Renewable Energy Directive (RED II).
and biomethane The call shall contain, among the
selection criteria, the requirement set
out in the description of the investment.
133 8.3 Increasing Milestone Action plan for the Approved plan Q2 2025 The Minister of Climate and the
production and production and use Minister of Regional Affairs and
uptake of of biogas and Agriculture shall approve the action
sustainable biogas biomethane plan for the production and use of
and biomethane sustainable biogas and sustainable
biomethane.
6468/26 ADD 1 62
ANNEX ECOFIN 1A EN
Quantitative indicators (for targets) Indicative
Related Measure Qualitative timeline for
Sequential Milestone Description of each milestone and
(Reform or Name indicators (for completion
Number /Target target
Investment) milestones) Unit of
Baseline Goal Quarter Year
measure
134 8.3 Increasing Target Installation of new Increase in 0 4 000 000 Q2 2026 Installed capacity for the production of
production and biomethane installed sustainable biomethane shall increase by
uptake of production capacity production at least 4 000 000 cubic metres under
sustainable biogas capacity of the support scheme as demonstrated in
and biomethane sustainable the final project implementation
biomethane in reports.
cubic metres
6468/26 ADD 1 63
ANNEX ECOFIN 1A EN
2. Estimated total cost of the recovery and resilience plan
The estimated total cost of the modified RRP including the REPowerEU chapter of Estonia is
EUR 953 380 000.
The estimated total cost of the REPowerEU chapter is EUR 90 040 000. In particular, the estimated
total costs of the measures referred to in Article 21c(3), point (a) of Regulation (EU) 2023/435 is
EUR 0 whilst the costs of the other measures in the REPowerEU chapter is EUR 90 040 000.
SECTION 2: FINANCIAL SUPPORT
1. Financial contribution
The instalments referred to in Article 2(2) shall be organised in the following manner:
First Instalment (non-repayable support):
Sequential Related Measure Milestone
Name
Number (Reform or Investment) /Target
2.1. Green transition of Creation of a Green Transition Task Force to implement
23 Milestone
enterprises and monitor the green transition
2.3.Greentechnology Establishment of a working group to plan and set up the
28 Milestone
development programme development programme
Signature of contractual agreement between the
37 2.6. Green Fund Milestone Ministry of Economic Affairs and Communications and
SmartCap
Adoption of the investment policy document by
38 2.6. Green Fund Milestone
SmartCap
3.1. Creation and Setting up a data management team in the Statistical
development of a centre of Office, the Ministry of Economic Affairs and
44 Milestone
excellence for data Communications and the State Information System
governance and open data Authority
4.4. Boosting the green Government decision on investments needed to alleviate
70 transition in the energy Milestone
the defence related height restrictions on wind parks
economy
Adoption of the decision of the Government on the
4.4. Boosting the green
initiation of the preparation process of the National
71 transition in the energy Milestone
Development Plan of the Energy Sector, the designation
economy
of those responsible and deadlines
4.5. Programme to increase the
Signature of network investment co-financing contract
74 capacity of the electricity Milestone
with transmission system operator
transmission network
5.1. Safe, green, competitive,
needs-based and sustainable Adoption of the Transport and Mobility Development
81 Milestone
transport and energy Plan 2021-2035 by the Government
infrastructure
5.4. Construction of the
89 Milestone Completion of the tramway construction project design
Tallinn Old Port tram line
Entry into force of the Decree of the Government,
6.3. Strengthening primary which amends the list of health care services of the
106 Milestone
health care Estonian Health Insurance Fund on access to specialised
medical care
6468/26 ADD 1 64
ANNEX ECOFIN 1A EN
Sequential Related Measure Milestone
Name
Number (Reform or Investment) /Target
Entry into force of amendments to the Decree of the
6.3. Strengthening primary Government which amends the list of health care
107 Milestone
health care services of the Estonian Health Insurance Fund on costs
and services of general practitioners
6.6. Providing labour market Entry into force of the Decree of the Minister of Health
113 measures to reduce youth Milestone
and Labour to strengthen the“MyFirst Job” scheme
unemployment
Entry into force of the Government Regulation on the
124 Audit and Control Milestone legal framework for the implementation and monitoring
of the recovery and resilience plan of Estonia.
Instalment
EUR 142 977 720
Amount
Second Instalment (non-repayable support):
Sequential Related Measure (Reform Milestone
Name
Number or Investment) /Target
1.1. Digital transformation in Call for proposals with award criteria and award
1 Milestone
enterprises conditions
1.4. Skills reform for the
Entry into force of secondary legislation setting out the
11 digital transformation of Milestone
terms of support for the development of digital skills
businesses
1.5 Supporting the
competitiveness of
16 Milestone Preparation of the development of strategies
enterprises in foreign
markets
1.5 Supporting the
competitiveness of Preparatory analysis to define the content and the
19 Milestone
enterprises in foreign locations of business centres
markets
1.5 Supporting the
competitiveness of Setting-up of impact groups and selection of
21 Milestone
enterprises in foreign destinations for global digital missions
markets
2.2. Green skills to support
Entry into force of secondary legislation setting out the
25 the green transition of Milestone
terms of support for the development of green skills
enterprises
2.4. Modernisation of the Entry into force of the ministerial decree setting out the
32 business models in Milestone
terms and conditions of grant eligibility
manufacturing companies
2.5. Resource efficient green
34 Milestone Publication of call for proposals for grants
technologies
3.4. #Bürokratt programme Access to digital public services through the virtual
51 Target
(national virtual assistant) assistant platform
3.5. Reconfiguration of basic
digital services and safe Development of centrally delivered/shared IT base
54 Milestone
transition to cloud services
infrastructure
4.2. Support for the Publication of calls for applications for residential
65 renovation of multi- Milestone
apartment buildings renovation grants
apartment buildings
4.3. Support for the
68 renovation of small Milestone Published calls for renovation grant
residential buildings
5.4. Construction of the
90 Milestone Award of works contract
Tallinn Old Port tram line
6468/26 ADD 1 65
ANNEX ECOFIN 1A EN
Sequential Related Measure (Reform Milestone
Name
Number or Investment) /Target
6.6. Providing labour market
114 measures to reduce youth Milestone Youth Guarantee Action Plan
unemployment
Entry into force of amendments to the Social Welfare
117 6.8. Long-term care Milestone
Act
Instalment
EUR 142 977 720
Amount
Third Instalment (non-repayable support):
Sequential Related Measure (Reform Milestone /
Name
Number or Investment) Target
1.3. Development of digital eFTI (electronic Freight Transport Information)
7 Target
waybills services platforms development
2.1. Green transition of Adoption of the Circular Economy Action Plan by the
24 Milestone
enterprises Green Transition Task Force
2.7. Creating opportunities
for the uptake of renewables- Entry into force of the ministerial decree setting out the
41 Milestone
based green hydrogen terms and conditions for granting support
technologies
3.2. Development of event Launch of personal life event services and/or pro-active
47 Target
services for individuals services
3.3. Development of event Deployment of IT developments contributing to the
49 services and digital gateway Target implementation of the business event services and
for entrepreneurs gateway
Conclusion of the cooperation agreement stipulating
4.1. Energy efficiency conditions for cooperation between SA
63 Milestone
promotion KredEx/Enterprise Estonia and county development
centers
4.6. Programme to boost Publication of a call for proposals for projects boosting
76 energy production in Milestone
energy production in industrial sites
industrial areas
4.7. Pilot Energy Storage Publication of a call for proposals for a pilot energy
78 Milestone
Programme storage programme
5.1. Safe, green, competitive, Adoption of the Implementation Plan for green
needs-based and sustainable
82 Milestone sustainable public transport development of the
transport and energy
Transport and Mobility Development Plan 2021-2035
infrastructure
5.5.
92 Municipalities’investmen Milestone Call for proposals for grants
ts in bike- and walkways
6.1. A comprehensive
Approval of the Strategic Framework for addressing
95 change in the organisation of Milestone
health workforce shortages
health care in Estonia
6.1. A comprehensive Entry into force of the Decrees of the Minister of Health
96 change in the organisation of Milestone and Labour amending the reimbursement system for
health care in Estonia doctors and pharmacists
6.2.a Construction of Signature of the contract for the construction of
99a Milestone
TERVIKUM TERVIKUM
6.3. Strengthening primary Entry into force of amendments to the Health Services
108 Milestone
health care Organisation Act
6.4. Renewal of the eHealth Approval of the eHealth Governance Framework and its
109 Milestone
Governance implementation roadmap
6.7. Extending the duration Entry into force of the amendments to the
116 of unemployment insurance Milestone Unemployment Services and Benefits Act and the
benefits Unemployment Insurance Act
118 6.8. Long-term care Milestone Action Plan on an integrated care model
6468/26 ADD 1 66
ANNEX ECOFIN 1A EN
Sequential Related Measure (Reform Milestone /
Name
Number or Investment) Target
6.9. Reducing gender pay
122 Milestone Digital gender pay gap tool
gap
Instalment
EUR 142 977 720
Amount
Fourth Instalment (non-repayable support):
Sequential Related Measure (Reform Milestone
Name
Number or Investment) /Target
1.1. Digital transformation in
2 Target Award of grants
enterprises
1.4. Skills reform for the
12 digital transformation of Target Enrolment in training activities
businesses
1.5 Supporting the
competitiveness of
17 Milestone Procurement of studies
enterprises in foreign
markets
2.3.Greentechnology Set up of the Green Technologies Development
29 Milestone
development programme Programme
2.5. Resource efficient green Number of projects awarded grants following the call for
35 Target
technologies proposals
2.8 Supply security
43a Milestone Publication of the call for proposals for grants
investment support
3.5. Reconfiguration of basic
digital services and safe Deployment of national private cloud infrastructure by
55 Target
transition to cloud public authorities
infrastructure
3.5. Reconfiguration of basic
digital services and safe
56 Milestone Extension of the cloud infrastructure to the data embassy
transition to cloud
infrastructure
5.2.a Multifunctional work
84a Milestone Contract signed for building of the vessel
vessel
5.3.a Construction of the
Works contracts for the construction of Rail Baltic
86a Rail Baltic viaducts and Milestone
viaducts
terminal
Entry into force of the Decree of the Minister of Health and
6.1 A comprehensive change
Labour and the amendment to the Health Services
96a in the organisation of health Milestone
care in Estonia Organisations Act establishing the reimbursement system
for nurses
6.1. A comprehensive
97 change in the organisation of Target Admission to nursing training
health care in Estonia
6.9. Reducing gender pay Adoption of the Welfare Development Plan 2023-2030 by
121 Milestone
gap the government
6.9. Reducing gender pay
123 Milestone Digital gender pay gap tool
gap
8.1 Facilitating the
Publication of the call for proposals to support local
125 development of renewable Milestone
authorities
energy sources
8.1 Facilitating the Entry into force of the amendments to the relevant laws
126 development of renewable Milestone streamlining permitting, planning and environmental
energy sources impact assessment processes
6468/26 ADD 1 67
ANNEX ECOFIN 1A EN
Sequential Related Measure (Reform Milestone
Name
Number or Investment) /Target
8.2 Programme to increase
the access of renewable
Signature of the co-financing agreement for electricity
129 energy production to the Milestone
distribution network
electricity distribution
network
8.3 Increasing production Call for applications for grants to support the uptake of
131 and uptake of sustainable Milestone
biomethane
biogas and biomethane
Instalment
EUR 142 977 720
Amount
Fifth Instalment (non-repayable support):
Sequential Related Measure (Reform Milestone
Name
Number or Investment) /Target
1.2. Development of e- Adoption of international standards and best practices for
4 Milestone
construction the use of digital technologies in construction
1.2 Development of e-
6 Target Projects for digital construction tools
construction
1.4. Skills reform for the
Number of curriculums of training registered and
14 digital transformation of Target
qualification standards for ICT specialists registered
businesses
Completion of the investment by the Ministry of
39a 2.6 Green Fund Milestone
Economic Affairs and Communication
2.7 Creating opportunities for
the uptake of renewables- Grant agreements signed for projects in renewables-based
43 Target
based green hydrogen green hydrogen technologies
technologies
2.8 Supply security
43c Target Confirmations from authorities accepting the final reports
investment support
3.1 Creation and development
of a centre of excellence for
46 Target Publication of datasets
data governance and open data
3.3 Development of event
50 services and digital gateway Target IT developments online
for entrepreneurs
3.5. Reconfiguration of basic
digital services and safe
58 Target Security testing by the Information System Authority
transition to cloud
infrastructure
3.6. The strategic analysis of
59 money laundering and Milestone Entry into force of legal act(s)
terrorist financing in Estonia
4.4. Boosting the green
72 transition in the energy Milestone Entry into force of legal acts
economy
4.8 Boosting offshore wind Contractors for the radar and passive radar system/sensors
80a Milestone
farms development selected and contracts signed
5.4 Construction of the
91 Milestone New tramway line
Tallinn Old Port tram line
5.5.
93 Municipalities’investmen Target Construction works on bike- and walkways delivered
ts in bike- and walkways
6.1. A comprehensive change
Entry into force of the Government Order on the Hospital
94 in the organisation of health Milestone
network development roadmap
care in Estonia
6468/26 ADD 1 68
ANNEX ECOFIN 1A EN
Sequential Related Measure (Reform Milestone
Name
Number or Investment) /Target
6.2.a Construction of
100a Milestone TERVIKUM constructed
TERVIKUM
6.6 Providing labour market Number of young people enrolled in labour market related
115 measures to reduce youth Target
measures
unemployment
Entry into force of the legislative amendments of the
120 6.8. Long-term care Milestone
support system for children with higher care needs
8.1 Facilitating the
Governmental decision establishing priority development
127 development of renewable Milestone
areas for wind energy
energy sources
8.1 Facilitating the
128 development of renewable Target Support to local authorities
energy sources
8.3 Increasing production and
Action plan for the production and use of biogas and
133 uptake of sustainable biogas Milestone
biomethane
and biomethane
Instalment
EUR 190 636 960
Amount
Sixth Instalment (non-repayable support):
Sequential Related Measure Milestone
Name
Number (Reform or Investment) /Target
1.1. Digital transformation in
3 Target Award of grants
enterprises
1.3. Development of digital
9 Target Confirmations from authorities accepting the final reports
waybills services
1.4 Skills reform for the
13 digital transformation of Target Participation in training activities
businesses
1.5 Supporting the
18 competitiveness of Target Strategies published and missions carried out
enterprises in foreign markets
1.5 Supporting the
20 competitiveness of Target Number of business centres opened
enterprises in foreign markets
2.2 Green skills to support
27 the green transition of Target Training certificates issued
enterprises
2.3 Green technologies Number of clusters and startups supported through the
31 Target
development programme Green Technology Development Programme
2.4. Modernisation of the
33 business models in Target Number of projects supported
manufacturing companies
2.5 Resource efficient green
36 Target Confirmations from authorities accepting the final reports
technologies
Legal financing agreements signed with equity/venture
40a 2.6 Green Fund Target
capital funds
3.2 Development of event
48 Target Online personal life event services
services for individuals
3.4. #Bürokratt programme
52 Target Bürokratt virtual assistant on public authorities’ websites
(national virtual assistant)
3.7 Information system for
strategic analysis of money
60 Milestone ICT system for strategic analysis
laundering and terrorist
financing
6468/26 ADD 1 69
ANNEX ECOFIN 1A EN
Sequential Related Measure Milestone
Name
Number (Reform or Investment) /Target
3.8. Construction of very
Number of very high capacity broadband network projects
62 high capacity broadband Target
confirmed
networks
4.2 Support for the
Multi-apartment buildings with improved energy
66 renovation of multi- Target
performance
apartment buildings
4.3 Support for the Small residential buildings with improved energy
69a renovation of small Target performance
residential buildings
4.4. Boosting the green
Adoption of the National Development Plan of the Energy
73 transition in the energy Milestone
Sector by the Government
economy
4.5 Programme to increase the
75 capacity of the electricity Target Additional grid capacity
transmission network
4.6 Programme to boost
Additional connection capacity for renewable electricity
77 energy production in Target
production
industrial areas
4.7 Pilot Energy Storage Additional heat and electricity storage capacity resulting
80 Target
Programme from investment support
Removal of the height restriction on offshore wind
4.8 Boosting offshore wind
80c Milestone turbines in the Gulf of Riga and Estonian islands Hiiumaa,
farms development
Saaremaa, Vormsi
5.2.a Multifunctional work
85a Milestone Multifunctional work vessel built
vessel
5.3.a Construction of the Rail Viaducts constructed and disbursement made for
87a Milestone
Baltic viaducts and terminal construction work of terminal
5.3.b Renovation of a section
88b of the railway from Rapla to Milestone Renovation of railway section
Lelle
Entry into force of the Ministerial Regulation amending the
6.1 A comprehensive change
agreement between the Ministry of Social Affairs and the
98 in the organisation of health Milestone
care in Estonia University of Tartu on the shortage of doctors in certain
specialisations
8.2 Programme to increase
the access of renewable
130 energy production to the Target Additional 160 MW capacity available
electricity distribution
network
8.3 Increasing production and
134 uptake of sustainable biogas Target Installation of new biomethane production capacity
and biomethane
Instalment
EUR 190 636 960
Amount
6468/26 ADD 1 70
ANNEX ECOFIN 1A EN
SECTION 3: ADDITIONAL ARRANGEMENTS
1. Arrangements for monitoring and implementation of the recovery and resilience plan
The monitoring and implementation of the Estonian recovery and resilience plan shall take place in
accordance with the following arrangements:
The Ministry of Finance as the lead ministry and the State Shared Service Center shall ensure
overall coordination, monitoring and implementation of the recovery and resilience plan. The State
Shared Service Center shall perform the functions of the managing authority. The State Budget
Department in the Ministry of Finance in cooperation with the State Shared Service Center shall
carry out the tasks related to monitoring and evaluation.
Sectoral ministries and agencies shall perform the responsibilities assigned to them, related to the
implementation of the plan. Their services shall also support the monitoring of the progress of the
projects under their competency and maintain close cooperation with the State Shared Service
Center and the Ministry of Finance. To this end, the existing Structural Funds Operating System
(SFOS) shall be used to record all the data related to implementation and monitoring of the plan.
The Financial Control Department of the Ministry of Finance, the audit authority, shall carry out
regular audits of the management and control systems put in place. It shall also prepare a summary
of the audits carried out for requests for payments. The Audit Authority shall also host the Anti-
Fraud Co-ordinating Service.
All national and external sources shall be budgeted together in sector-specific programmes allowing
transparent monitoring of sectoral funding and allowing the identification of risks and prevention of
double funding.
2. Arrangements for providing full access by the Commission to the underlying data
The State Shared Service Center as the managing authority shall hold the responsibility for
submitting requests for payment to the European Commission and for drawing up the management
declaration by which it certifies that the funds have been used for their intended purpose, that the
information is complete, accurate and reliable and that the control system provides the necessary
assurance. In addition, monitoring and evaluation shall also be ensured by the Ministry of Finance
in cooperation with the State Shared Service Center.
Data related to the implementation and monitoring of the plan shall be stored in the existing
integrated information system, the Structural Funds Operating System (SFOS). The SFOS is
adapted to the requirements under Regulation (EU) 2021/241 for data collection, progress reports
and requests for payment, including to collect indicators and other information necessary to
demonstrate and report the achievement of milestones and targets. The SFOS shall be used by all
actors involved in the implementation of the plan. The information in the SFOS shall continuously
be updated on the progress and results of the plan including deficiencies identified and all corrective
actions taken.
6468/26 ADD 1 71
ANNEX ECOFIN 1A EN
In accordance with Article 24(2) of Regulation (EU) 2021/241, upon completion of the relevant
agreed milestones and targets in Section 2.1 of this Annex, Estonia shall submit to the Commission a
duly justified request for payment of the financial contribution. Estonia shall ensure that, upon
request, the Commission has full access to the underlying relevant data that supports the due
justification of the request for payment, both for the assessment of the request for payment in
accordance with Article 24(3) of Regulation (EU) 2021/241 and for audit and control purposes.
6468/26 ADD 1 72
ANNEX ECOFIN 1A EN