dokumendiregister.ee
OtsingAsutusedMCP
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel
Otsing›Riigi Tugiteenuste Keskus
Väljaminev kiriAvalik

Reimbursement Request No 2, Support Measure "Biodiversity Programme"

Riigi Tugiteenuste Keskus · 16. märts 2026
Viit
11.1-5/26/642-1
Registreeritud
16. märts 2026
Dokumendi liik
Väljaminev kiri
Adressaat
Embassy of Switzerland to Latvia, Lithuania and Estonia, Embassy of Switzerland to Latvia, Lithuania and Estonia, Embassy of Switzerland to Latvia, Lithuania and Estonia
Saabumis/saatmisviis
e-post
Funktsioon
11.1 Toetuste arendamine, sertifitseerimine ja järelevalve 2025-
Sari
11.1-5 Šveitsi programmi dokumendid kirjavahetus
Toimik
11.1-5/2026
Vastutaja
Helena Musthallik (Riigi Tugiteenuste Keskus, Peadirektori asetäitjale alluvad osakonnad, Toetuste arendamise osakond, Piiriüleste koostööprogrammide talitus)

Failid

  • 📎11.1-526642-1 16.03.2026 Väljaminev kiri.asice353 KB
  • 📎Confirmation of digital signature_Karin Viikmaa.pdf151 KB
  • 📎Reimbursement Request No 2, Support Measure Biodiversity Programme.pdf365 KB
  • 📎RR 2 Biodiversity 7F-10768.01.pdf646 KB
  • 📎RR 2 Biodiversity 7F-10768.01.xlsx

Sisu (failidest)

Swiss-Estonian Cooperation Programme Reimbursement Request No. 2 Biodiversity Programme Instructions Estonia A. Basic information Support Measure Title Biodiversity Programme Support Measure Identification Code Šveits.1.02 7F-10768.01 Support Measure duration from 5/1/2024 to 8/31/2028 Name of Executing Agency (EA) Reporting period from 7/1/2025 to 12/31/2025 Reimbursement Request No 2 Total Support Measure Budget (local currency) 8,447,107.00 EUR Maximum Swiss contribution (CHF) 6,930,000.00 CHF Swiss co-financing rate on total budget 85.00% on total expenditures 85.00% Exchange rate used CHF/EUR 1.104 Date of exchange rate 3/2/2026 B. Amount requested by the Paying Authority Total amount requested 580,963.59 EUR 526,004.43 CHF National co-financing 87,144.54 EUR 78,900.67 CHF Deductions (according to Regulations 11.4/3) 0.00 EUR 0.00 CHF Swiss co-financing = Reimbursement by CH 493,819.05 EUR 447,103.76 CHF C. Available amount from the Swiss Contribution Maximum Swiss Contribution 6,930,000.00 CHF 100.00% Cumulative amount received from Switzerland 532,031.61 CHF 7.68% Available amount before the current reimbursement 6,397,968.39 CHF 92.32% Total amount of current reimbursement request 447,103.76 CHF 6.45% Remaining amount after the current reimbursement 5,950,864.63 CHF 85.87% D. Certification and approval of Reimbursement Request Executing Agency: Programme Operator Name of the institution: Ministry of Climate Address: Suur-Ameerika 1, 10122 Tallinn, Estonia Name of the contact person: Kairi Toiger Position: Advisor, financial department Email: [email protected] Phone number: 3,726,262,931 The Executing Agency hereby certifies (i) that the Support Measure is implemented in accordance with the Support Measure Agreement and Support Measure Implementation Agreement; (ii) the reporting under Physical Progress, Financial Progress and Procurement Plan is true and accurate; (iii) that the reporting under Financial Progress reflects correctly the incurred expenditures; (iv) that recoverable VAT is not included in the Financial Progress as eligible expense; (v) that no double-financing occurs; (vi) that all procurements for which expenditures were incurred during the reporting period have been conducted in compliance with the applicable law of the Partner State and EU directives on public procurement. Deputy Secretary General on Environmental Protection and Name: Antti Tooming Position: Biological Diversity Place, date and signature digitally signed template v13.7.23 Reimbursement Request Page 1 National Coordination Unit Name of the institution: State Shared Service Centre Address: Lõkke 4, 10122 Tallinn Name of the contact person: Helena Musthallik Position: programme expert Email: [email protected] Phone number: +37256466003 The National Coordination Unit hereby certifies (i) that the information and financial data provided in this Reimbursement Request has been thoroughly reviewed and found to be correct, reliable and accurate; (ii) that claimed expenditures are incurred as part of the Support Measure in accordance with the Framework Agreement, the relevant Support Measure Agreement and Support Measure Implementation Agreement; (iii) that all payments declared have actually been made in the indicated (or exceptionally previous) reporting period. (iv) the compliance with state aid rules of all activities performed in the reporting period. Name: Urmo Merila Position: Deputy Director General Date and signature digitally signed Paying Authority Name of the institution: State Shared Service Centre Address: Lõkke 4, 10122 Tallinn Name of the contact person: Janika Otsing Position: financial specialist Email: [email protected] Phone number: +3726631926 The Paying Authority hereby certifies (i) to have checked the conformity of the Reimbursement Request with the financial stipulations, in particular the co-financing rate, set out in the relevant Support Measure Agreement; (ii) to have received sufficient information for the certification of the Reimbursement Request; (iii) to have checked the compliance of the Reimbursement Request with the information available to the Paying Authority; (iv) that the co-financing of the Partner State has been provided in accordance with the relevant Support Measure Agreement; (v) that based on the information available to the Paying Authority no double-financing could be identified; (vi) that recoverable VAT is not included in the Reimbursement Request as eligible expense. The bank details for reimbursement are as follows: Beneficiary: Ministry of Finance of the Republic of Estonia IBAN: EE891010220034796011 SWIFT: EEUHEE2X Reference: 2550081357 Name: Karin Viikmaa Position: Head of the Grants Payment Department Date and signature digitally signed template v13.7.23 Reimbursement Request Page 2 Biodiversity Programme / Reimbursement Request No. 2 Financial Progress Instructions BUDGET REPORTING PERIOD 1: 5/1/2024 6/30/2025 REPORTING PERIOD 2: 7/1/2025 12/31/2025 CUMULATIVE DATA PLANNING EUR % CHF EUR CHF CHF CHF EUR CHF CHF CHF EUR CHF CHF CHF CHF Reimburseme Reimbursements Reimbursements Total nts expected Co-financing Swiss Eligible Eligible Swiss Eligible Eligible Swiss Eligible Total Eligible Swiss % of Swiss expected to be expected to be Budget National co- National co- % of Budget remaining to be received No Budget items rate (CH co- contribution expenditures expenditures contribution expenditures expenditures contribution expenditures remaining Expenditures contribution Contribution received from received from 100% financing financing spent Swiss from financing) (co-financing) 100% 100% (co-financing) 100% 100% (co-financing) 100% Budget 100% (co-financing) spent Switzerland (current Switzerland (year contribution Switzerland year) +2) (year +1) Exchange rate CHF/EUR 1.036 1.070 1.104 1 Management Costs 247,384.00 85.00% 202,953.63 34,210.56 31,966.35 4,794.95 27,171.40 8,522.81 7,716.55 1,157.48 6,559.07 42,733.37 17.27% 204,650.63 39,682.90 33,730.47 16.62% 169,223.16 30,000.00 52,000.00 87,223.16 1.1 Personnel 71,760.00 11,986.39 4,712.44 16,698.83 23.27% 55,061.17 1.2 Expenses of State Shared Service Centre for verification of incurred expenditure 72,800.00 3,895.71 3,307.48 7,203.19 9.89% 65,596.81 1.3 Information and communication 57,420.00 14,881.88 450.00 15,331.88 26.70% 42,088.12 1.4 Miscellaneous 45,404.00 3,446.58 52.89 3,499.47 7.71% 41,904.53 2 Programme Component 1 "Development of innovative monitoring technolo-gies/solutions and improvement of Environmental data-bases and systems" (operator Environmental Agency) 3,514,862.00 85.00% 2,883,589.89 189,976.42 177,513.97 26,627.10 150,886.87 171,790.78 155,539.37 23,330.91 132,208.46 361,767.20 10.29% 3,153,094.80 333,053.34 283,095.33 9.82% 2,600,494.56 983,280.00 929,560.00 687,654.56 2.1 Management costs Programme Component 1 301,700.00 . 56,991.21 47,631.08 104,622.29 34.68% 197,077.71 2.2 Activity 1: Development of new monitoring methods 1,927,562.00 88,406.86 91,069.04 179,475.90 9.31% 1,748,086.10 2.3 Activity 2: Development of IT systems 1,285,600.00 44,578.35 33,090.66 77,669.01 6.04% 1,207,930.99 3 Programme Component 2 “Implementation of a systematic assessment of the social and conservation outcomes of protected areas” (operator Environmental Board) 4,684,861.00 85.00% 3,843,456.11 445,675.53 416,439.22 62,465.88 353,973.34 400,650.00 362,748.51 54,412.28 308,336.23 846,325.53 18.07% 3,838,535.47 779,187.73 662,309.57 17.23% 3,181,146.54 950,000.00 1,215,000.00 1,016,146.54 3.1 Management costs Programme Component 2 961,111.14 77,679.89 74,212.00 151,891.89 15.80% 809,219.25 3.2 Activity 1: Conservation Management Effectiveness Assessment 492,515.41 37,933.81 67,889.81 105,823.62 21.49% 386,691.79 3.3 Activity 2: Conservation Management Planning 1,916,120.91 216,266.56 156,284.53 372,551.09 19.44% 1,543,569.82 3.4 Activity 3: Species Protection 1,315,113.54 113,795.27 102,263.66 216,058.93 16.43% 1,099,054.61 TOTAL 8,447,107.00 85.00% 6,929,999.63 669,862.51 625,919.54 93,887.93 532,031.61 580,963.59 526,004.43 78,900.67 447,103.76 1,250,826.10 14.81% 7,196,280.90 1,151,923.97 979,135.37 14.13% 5,950,864.26 1,963,280.00 2,196,560.00 1,791,024.26 Financial Progress Page 3 Information on modifications of the Support Measure approved during the reporting period According to Regulation Article 4.12 No modifications of the Support Measure were approved during the reporting period. Information on non-eligible expenditures during the reporting period Please indicate the amount of non-eligible expenditures during the reporting period. Why are the expenditures non-eligible (for example due to irregularities or because it was agreed during the approval process of the SM that the costs are non-eligible)? Who will finance the non-eligible expenditures? No non-eligible expenditures were found. Information on deductions related to financial corrections (Art 11.4/3 Regulations) In case of a financial correction already paid by Switzerland and deducted in this Reimbusement Request, please indicate the budget item, reporting period in question and provide explanation on the deduction made / refer to irregularity report. There were no deductions. Information on advance payments According to Art. 8.3. of the Regulations the Partner State may in exceptional cases agree with Switzerland on advance payments. If these are foreseen in the Support Measure Agreement, describe how the advance payment will be used in the upcoming reimbursement period and provide proof for the execution of the advance payment by the Partner State. Advance payments were not foreseen. Information regarding deviations from financial planning If there is a significant difference between the expenditures planned for this reporting period and the actual expenditures paid by the Paying Authority, justify the deviations. Also explain if the financial planning in this reimbursement request significantly differs from the financial planning in the previous reimbursement requests.If there is a cost overrun per budget item, describe how the additional costs will be covered. Programme Component 2 reimbursment request is lower than planned because the central procurements of the institution took longer and the signing of the contracts was delayed. Financial Progress Page 4 Swiss-Estonian Cooperation Programme Biodiversity Programme / Reimbursement Request No. 2 Operational Progress Management Costs No Short description of activities undertaken in the reporting period 1.1 Personnel Preparation of different legal documents, annual reports etc. - Reporting expenses in a domestic program - Preparation and submission of the Reimbursement Request. RR was submitted in September 2025. - Organising the third Steering Committee meeting in Ida-Virumaa on 6-7th October 2025. 1.2 Expenses of State Shared Service Centre for verification of incurred expenditure The NCU verified the expenditures of the support measure. 1.3 Information and communication Programme operator organised task force meetings. This budget line includes some costs related to a monitoring visit in Saaremaa in April 2025. 1.4 Miscellaneous Study trip and monitoring visit. The Programme Operator participated in a study trip to Switzerland with Programme Component 2 to learn about national park. The Programme Operator organised the third Steering Committee meeting and a monitoring visit in Ida- Virumaa 6–7 October 2025. Estimated cumulative physical progress (%) Programme Component 1 "Development of innovative monitoring technolo-gies/solutions No Short description of activities undertaken in the reporting period 2.1 Management of the programme component Personnel managed. Procurement of 4 bird-radars and other innovative monitoring devices were managed and contracted. Preparation of integrating innovative devices into national biodiversity monitoring is launched in cooperation with monitoring team in Estonian Environment Agency. eDNA method testing contract was finalised and report handed over, acceptance will be expected in January 2026. 10 voluntary monitoring campaigns were finalised and next 10 prepared for 2026 together with substancial communication plan, including two big events as feedback for voluntary monitorers in 2026. Project IT development plan was promoted and needed institutions as well as contact persons networked. Cooperation contract with the IT Centre of the Ministry of the Environment (KEMIT) is in force and expenditures as well as developments plan is obtained. 2.2 Activity 1. Development of new monitoring methods Purchase process of 4 mobile 3D birdradars reached contracting in september 2025 and radars are expected to be delivered in spring-summer 2026. Many other innovative monitoring devices (fieldwork rugged tablets, bat-detectors, bird sound recorders, thermal binoculars etc) testing by monitorers ended succsessfully and devices were purchased in bigger numbers to be integrated and used in national biodiversity monitoring programme. These devices will be also delivered in spring-summer 2026. Preparation of new innovative monitoring method basing on eDNA for monitoring invertebrates and fish in rivers was successfully finalised by contractor Estonian University of Life Sciences and results will be discussed further in January 2026. New monitoring method for testin was prepared for DNA basing monitoring of the Flying Squirrel as well as new method for Sand Lizzard and both methods testing is planned to be performed in 2026. Ten monitoring campaigns were successfully performed for volunteers and preparation of the results to be presented in feedback event in March 2026. Also 10 new voluntary bases monitoring campaigns were prepared for 2026. Operational Progress Page 5 2.3 Activity 2. Development of IT systems Cooperation contract signed between Environment Agency and the IT Centre of the Ministry of the Environment (KEMIT) for IT developments foreseen in Component 1 Activity 2 to be performed during following two years (2026 and 2027). Preparatory work (data analysis, development meetings, IT- specifications etc) was done by Component 1 IT operators for following IT developments planned in 2026 and 2027: Automated cross-flow of data between the Environmental Monitoring Information System (KESE) and Estonian Nature Information System (EELIS); automated cross-flow of data between the eBiodiversity Portal (using online and citizen science based database called PlutoF) and Estonian Nature Information System (EELIS) - both these IT-developments are planned to be performed during 2026; development of a fieldwork tool that allows the field-workers to enter the monitoring and inventory data directly to the system as well as development of a management efficiency assessment tool for the Environmental Board into EELIS were planned to be developed during 2027. Estimated cumulative physical progress (%) Programme Component 2 “Implementation of a systematic assessment of the social and conservation o No Short description of activities undertaken in the reporting period 3.1 Management of the programme component The management cost includes expenses of the personnel (general project manager) and overheads of all other expenses on personnel (activities 1, 2 and 3). The project manager (0.5 FTEs) has been responsible for the overall coordination of the project, also hiring the personnel, organising meetings, seminars and study trips and dealing with financial reports. There has been one 5-day study trip to Switzerland for 8 people from the Environmental Board and 2 people from the Ministry of Climate. Swiss National Park, Jurapark Aargau, Zurich Canton and the Swiss Federal Institute for Forest, Snow and Landscape Research were vivisted during the study trip. Another study trip was to Brussels: two people participated in the seminar organised by the European Commission, the topic was connected with setting objectives in management plans. 3.2 Activity 1: Conservation Management Effectiveness Assessment. The assessment of conservation management effectiveness started at the beginning of 2025. By the end of the year the management effectiveness of 97 sites has been assessed (the objective of the project is assessing 300 sites). The guidelines for the assessment has been reviewed according to the assessment results, gathering data has been made more effective (AI tools used). The assessing team: coordinator (1 FTE) and four assessors (2 FTEs). There is also one data analyst and one data specialist who support all the activities. 3.3 Activity 2: Conservation Management Planning The guidelines for protected area management plans are finalized and ready for use. They include all compulsory (legally required) chapters, and several sections have been refined based on the testing process. During the testing phase, specialists prepared protected area management plans and provided feedback for improving or amending the guidelines, as a result of which the guidelines were further refined. In addition, the guidelines were supplemented with technical solutions such as visitor management online maps, the Environmental Portal webpage, and the full translation of the lists of pressures, threats, and conservation measures. Under the new guidelines, three (Anne loodusala, Kaasiku loodusala, Andresaare loodusala) management plans have been approved and twelve draft plans have been prepared for approval. The data sheet about protected areas was completed in 2025. The data sheet is based on the data analytics tool Tableau, and the information is displayed on the Environmental Portal (Keskkonnaportaal). 3.3 The data used originate from the Estonian Nature Information System (EELIS). The web page has been publicly available since November 2025. Thanks to the web page, there is no longer a need to provide detailed descriptions or create maps for presenting the area and its values in management plans. The page consolidates all essential information related to protected areas in one place. 2025 was the year when most of the inventories of the habitats and species were prepared and ordered. The inventories give input to management plans. By the end of 2025 35 inventories were completed and 47 are being carried out. Three management plans of habitats have been prepared (lakes and springs, forests, wetlands). In June a seminar on river habitats took place, the seminar was organised together with Tartu University and Estonian Nature Fund, the number of participants was 117. The conservation management team: coordinator (1 FTE), 5 specialists (3 FTEs), 1 expert (0.4 FTEs), 1 expert (1 FTE) will join the team in February. Operational Progress Page 6 3.4 Activity 3: Species Protection In January the kick-off seminar of changing the categories of protected species was organised, Estonian best species experts were invited to the seminar. 119 people participated in Tartu and more than 140 people listened to the seminar online. In 2025 8 meetings for experts were organised, 39 species experts took part of these meetings. 9 different species groups (239 protected species and a list of new species) were discussed. The 1st out of 3 planned proposals of changing the categories of protected species has been put together. 2 action plans for protected species (2 species) have been approved; 2 action plans have been prepared by experts (2 species), 10 action plans (for 141 species) are under preparation by experts (contracts have been signed). 4 species inventories have been completed and 7 are being carried out (contracts). The species team: coordinator (1 FTE), specialist (1 FTE), expert (1 FTE). Estimated cumulative physical progress (%) Operational Progress Page 7 Swiss-Estonian Cooperation Programme Biodiversity Programme / Reimbursement Request No. 2 Programme Characteristics To be filled in by Programme Operator To be filled in by Switzerland (see SAP characteristics) To be filled in by Switzerland (see SAP characteristics) Swiss Contribution (in-country) PM Support No Programme Component Name CHF Specific Objective Thematic Area Name Programme Component Operator Type of entity Planned duration Sector 1 Sector 2 (SDC only) Sector 3 (SDC only) PM Support PM Support RIO CC PM Support PM PM PM PM Support Geographic Focus RIO CC RIO CC Social PM Gender Digitalisatio RIO PSP/PA maximum 40 characters in CHF according to Art. 2.2 according to Art. 2.4 Start End use title, not code use title, not code use title, not code desertificati Governance Disabilities Regulations Regulations Adaptations mitigation Inlcusion n biodiversity on 1 Management Costs 202,953.63 Environment and climate Biodiversity national coverage Ministry of Climate National administration 01/05/24 31/08/28 Bio-diversity Not targeted Not targeted Not targeted Not targeted Not targeted Not targeted Not targeted Not targeted Principal Programme Component 1 "Development of innovative monitoring technolo-gies/solutions and improvement of Environmental data- 2 bases and systems" (operator 2,883,589.89 Environment and climate Biodiversity national coverage Estonian Environment Agency National administration 01/05/24 30/04/28 Bio-diversity Not targeted Not targeted Not targeted Not targeted Not targeted Not targeted Not targeted Significant Principal Programme Component 2 “Implementation of a systematic assessment of the social and conservation outcomes of protected 3 areas” (operator Environmental Board) 3,843,456.11 Environment and climate Biodiversity national coverage Environmental Board National administration 01/05/24 30/04/28 Biodiversity Not targeted Not targeted Not targeted Not targeted Not targeted Not targeted Not targeted Not targeted Principal Swiss-Estonian Cooperation Programme Biodiversity Programme / Reimbursement Request No. 2 Procurement Plan To be filled in by Programme Operator English If applicable, planned Tender notice translation of Actual launch deadline for Launch of will be submitted Contract Actual Contract Actual Actual costs based on signed tender documents of tender Expenditures incurred based Programme Component or Project Ref. No Contract Name submitting tender to Swiss side signature contract completion contract Initially estimated costs contracts Contractor Comments will be made (publication of on signed contracts documentation to planned before planned signature planned completion available to tender notice) Swiss "non objection" publication bidders status/ appeals/ cancelling or repetion of tender (incl. reason)/ numbers of bidders and rejected quarter / quarter / quarter / quarter / year yes/no yes/no date date date EUR CHF EUR CHF name EUR CHF bids/risks/ irregularities related to the tender/ year year year difficulties with the the Contractor/ suspension of works etc. Programme Component 1 “Development of innovative monitoring technologies/solutions and improvement of Environmental databases and Swiss Birdradar Solution systems” Purchasing mobile 3D bird radar 2024 2024 yes yes 5/19/2025 1Q/2025 9/15/2025 4Q/2025 6/15/2026 990000 955524 675400 651,880 AG Costs wihtout VAT. Deckblatt Rechnung E-Billing / Coversheet Invoice E-Billing Buchungsinformationen / Booking information Referenz-Nummer / Reference Number REF-1006-66300 Projektnummer / Support Measure Identification Code 7F-10768.01 Kreditorennummer / Creditor Number 1000643543 Name des Kreditors / Creditor's name Ministry of Finance of the Republic of Estonia Strasse / Street Suur-Ameerika 1 PLZ, Ort / Zip code and place 10122 Tallinn Währung / Currency: CHF Betrag / Reimbursement requested from Switzerland 447,103.76 Aufteilung nach Programmkomponente / Breakdown by programme component Management Costs 6,559.07 Programme Component 1 "Development of innovative monitoring technolo-gies/solutions and improvement of Environmental data- 132,208.46 bases and systems" (operator Environmental Agency) Programme Component 2 “Implementation of a systematic assessment of the social and conservation outcomes of protected 308,336.23 areas” (operator Environmental Board) Zahladresse / Account details Kontoinhaber / bank account holder (if different from creditor name) Ministry of Finance of the Republic of Estonia IBAN-Nr.: EE891010220034796011 SWIFT: EEUHEE2X Reference: 2550081357 Bankbezeichnung / Name and address of the bank SEB, Tornimäe 2, 15010 Tallinn, Estonia Christoph Liechti Embassy of Switzerland to Latvia, Lithuania and Estonia [email protected] Ours 16.03.2026 no 11.1-5/26/642-1 Smilšu iela 8 Riga LATVIA Reimbursement Request No 2, Support Measure "Biodiversity Programme" Dear Mr Liechti, Hereby the Paying Authority of the Swiss-Estonian Cooperation Programme submits the Reimbursement Request No 2 of the Ministry of Climate for the Support Measure "Biodiversity Programme" covering the period from 01 July 2025 to 31 December 2025. Yours sincerely, (signed digitally) Karin Viikmaa Head of the Grants Payment Department Annex: 1. Reimbursement Request RR 2 Biodiversity 7F-10768.01 Helena Musthallik +372 56466003 [email protected] Lõkke 4 / 10122 Tallinn / 663 8200 / [email protected] / www.rtk.ee / Registrikood 70007340 VALIDITY CONFIRMATION SHEET SIGNED FILES FILE NAME FILE SIZE Reimbursement Request No 2, Support Measure Biodiversity Programme.pdf 364 KB SIGNERS NO. NAME PERSONAL CODE TIME 1 KARIN VIIKMAA 47410180248 16.03.2026 14:45:43 +02:00 VALIDITY OF SIGNATURE SIGNATURE IS VALID ROLE / RESOLUTION PLACE OF CONFIRMATION (CITY, STATE, ZIP, COUNTRY) SERIAL NUMBER OF SIGNER CERTIFICATE 6a:b3:54:b2:b7:d6:f8:47:62:bd:56:54:a4:80:9c:52 ISSUER OF CERTIFICATE AUTHORITY KEY IDENTIFIER ESTEID2018 D9 AC 70 DB 5F 7E BE 94 F8 A0 E4 BE 47 A2 D0 34 AD 9A 2A 12 HASH VALUE OF SIGNATURE 30 4F 30 0B 06 09 60 86 48 01 65 03 04 02 03 04 40 B1 F7 CB 3E AF 78 45 15 CD B2 68 1C A3 CB 4D 77 BD BC AC 6F 93 FB 5C 33 30 CE D0 A3 1 3 57 DA 3A C1 F1 F2 99 68 20 1C 14 73 F8 AE 65 4A D2 64 F7 09 4D 85 50 F8 49 4D E6 C1 0C B5 C9 16 64 61 DC The print out of files listed in the section "Signed Files" are inseparable part of this Validity Confirmation Sheet. NOTES Presented print summary is informative to confirm existence of signed file with given hash value. The print summary itself does not have independent verification value. Declaration of signers’ signature can be verified only through digitally signed file. Christoph Liechti Embassy of Switzerland to Latvia, Lithuania and Estonia [email protected] Ours 16.03.2026 no 11.1-5/26/642-1 Smilšu iela 8 Riga LATVIA Reimbursement Request No 2, Support Measure "Biodiversity Programme" Dear Mr Liechti, Hereby the Paying Authority of the Swiss-Estonian Cooperation Programme submits the Reimbursement Request No 2 of the Ministry of Climate for the Support Measure "Biodiversity Programme" covering the period from 01 July 2025 to 31 December 2025. Yours sincerely, (signed digitally) Karin Viikmaa Head of the Grants Payment Department Annex: 1. Reimbursement Request RR 2 Biodiversity 7F-10768.01 Helena Musthallik +372 56466003 [email protected] Lõkke 4 / 10122 Tallinn / 663 8200 / [email protected] / www.rtk.ee / Registrikood 70007340
Allikas: Riigi Tugiteenuste Keskus dokumendiregister →