dokumendiregister.ee
OtsingAsutusedMCP
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Kiri

Majandus- ja Kommunikatsiooniministeerium · 12. märts 2026
Viit
3-4/916-1
Registreeritud
12. märts 2026
Dokumendi liik
Sissetulev kiri
Adressaat
Integra Clean Energy
Saabumis/saatmisviis
e-post
Funktsioon
3 Teabehalduse korraldamine
Sari
3-4 Teabenõuded, märgukirjad, selgitustaotlused
Toimik
3-4/2026
Vastutaja
Peeter Kadarik (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Majanduse ja innovatsiooni valdkond, Ettevõtluskeskkonna ja tööstuse osakond)
Lahendamise tähtaeg
27. märts 2026

Failid

  • 📎E-kiri.eml31 KB

Sisu (failidest)

Saatja: "Michael See" <[email protected]> Saaja: "Sekretär - VPK" <[email protected]>, "press - RK" <[email protected]>, "Risto Kaljurand - RK" <[email protected]>, "Info - RAM" <[email protected]>, "info - MKM" <[email protected]>, [email protected], [email protected] Teema: Renewable energy, Estonia Kuupäev: 2026-03-12 11:41 Tähelepanu! Tegemist on välisvõrgust saabunud kirjaga. Tundmatu saatja korral palume linke ja faile mitte avada. Proposal for 600 MW 24/7 Firm Renewable Energy Hybrid Project in Tartu Your Excellencies, We are pleased to submit this strategic proposal for a state-of-the-art Wind, Solar, and Pumped Hydro Hybrid power plant in Tartu. This project is engineered to provide 600 MW of continuous, 24/7 firm power to the national grid, eliminating the intermittency typically associated with renewables. By maximizing high-altitude wind resources and utilizing advanced energy storage, this hybrid system ensures zero curtailment and provides a sustainable, unsubsidized alternative to fossil fuel generation. This investment represents a transformative shift for the national economy, involving a minimum 90% local workforce and a commitment to distribute 20% of annual profits toward health, education, and digital infrastructure. The project utilizes a strategy to prioritize storage during peak production, ensuring the lowest possible LCOE and long-term energy security. Period MW TIC $b LCOE Capital Profit ROI IRR 2030-2060 600 1.85 10.0 25.5 155% 12.5% 18.2% 2060-2090 600 1.15 7.0 22.0 214% 15.8% 22.4% LCOE = LCOE/GTD = Generation+transmission+distribution cost to the capital city in US c/kWh; Capital = Capital All-In Tariff in the capital city in US c/kWh which may include carbon taxes; TIC = Total Investment Cost wind solar pump hydro hybrid. The project offers flexible investment structures including BOT (Build-Operate-Transfer), BOOT (Build-Own-Operate-Transfer), BOO-1 (Build-Own-Operate, Private Investor 100% Owner, Government as Off-Taker), and BOO-2 (Build-Own-Operate, Private Investor 100% Owner, Private Sector and Government as Off-Takers). Deployment Schedule: June 2026: Proposal Agreement July 2026-June 2027: Energy Resource Evaluation July 2027: FID on resource confirmation August 2027-November 2029: Procurement, Construction, Commissioning, COD December 2029: Official Inauguration We request an early discussion to review the technical specifications and the significant economic benefits this 600 MW hybrid facility will bring to the country. Sincerely, Mr. Michael See Principal, Integra Clean Energy Pavilion Tower 16th Floor Jalan Raja Chulan 50200 Kuala Lumpur Malaysia Tel +603 2182 9776 Cell +65 9734 8618 Fax +603 2182 9797 Email <mailto:[email protected]> [email protected] Web <https://www.integracleanenergy.com/> https://www.integracleanenergy.com/
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →