dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Veeteede Amet
Sissetulev kiriAvalik

Metocean-related risks

Veeteede Amet · 27. mai 2020
Viit
1-3-6/1348
Registreeritud
27. mai 2020
Dokumendi liik
Sissetulev kiri
Adressaat
PIANC
Saabumis/saatmisviis
e-post
Funktsioon
1-3 Avalikkussuhted
Sari
1-3-6 Kirjavahetus rahvusvaheliste merendusorganisatsioonidega (IMO, PIANC, IALA, IHO)
Toimik
1-3-6/2020
Vastutaja
Kaidi Katus (Veeteede Amet, Kasutajad, Hüdrograafia ja navigatsioonimärgistuse teenistus)

Failid

  • 📎E-kiri.pdf672 KB
  • 📎LETTER 232docx.pdf249 KB
  • 📎LETTER 232docx.pdf249 KB
  • 📎ToR 232 - Metocean related risk during the construction of Marine works.pdf170 KB
  • 📎ToR 232 - Metocean related risk during the construction of Marine works.pdf170 KB

Sisu (failidest)

Saatja: Kaidi Katus <[email protected]> Saadetud: 27.05.2020 12:17 Adressaat: Signe Paevere <[email protected]> Teema: Fwd: setting-up new PIANC MarCom WG 232 on Metocean-related risks during the construction of marine works Manused: image009.jpg; image010.jpg; image011.jpg; image012.jpg; image009.jpg; image010.jpg; image011.jpg; image012.jpg; LETTER 232docx.pdf; ToR 232 - Metocean related risk during the construction of Marine works.pdf; LETTER 232docx.pdf; ToR 232 - Metocean related risk during the construction of Marine works.pdf From: Sabine Vandevelde <[email protected]> Sent: Wednesday, May 27, 2020 12:10:26 PM To: An Van Schel <[email protected]>; andythomaspianc <[email protected]>; A.Pahl <[email protected]>; Akula Rao <[email protected]>; Bridges, Todd S ERDC-EL- MS (Bridges, Todd S ERDC-EL-MS) <[email protected]>; CHABRIER Valérie <[email protected]>; Ed Schmeltz <[email protected]>; Wal, Egbert van der <[email protected]>; Eric Van den Eede <[email protected]>; Eslie Vrolijk <[email protected]>; Biondi, Esteban <[email protected]>; Esteban Lefler, Francisco <[email protected]>; geert vancappellen ([email protected]) <[email protected]>; 菜穂子 林田 <[email protected]>; hayashida work ([email protected]) <[email protected]>; Ian White <[email protected]>; hirasawa-k852a <[email protected]>; Leen Weltens <[email protected]>; Neil Lawson <[email protected]>; Pansic, Nicholas <[email protected]>; m-okada <[email protected]>; Philippe Rigo (Philippe Rigo) <[email protected]>; Matthew Prumm <[email protected]>; A Zaburtov ([email protected]) <[email protected]>; anna-karin norlin <anna-karin.norling- [email protected]>; A. Antunes <[email protected]>; Gema Vázquez Sánchez <[email protected]>; 'Ban Hop tac Quoc te' ([email protected]) <[email protected]>; benjelloun m <'[email protected]'>; Beom-koo ([email protected]) <[email protected]>; Bergthora Thorkelsdottir <[email protected]>; Chan Dara <[email protected]>; Bruno Georges <[email protected]>; Yuan Peng <[email protected]>; Mario Germ�n Rodr�guez Viera <[email protected]>; cwtca <[email protected]>; Dinar C. Istiyanto <[email protected]>; Nybø, Elin Orø <[email protected]>; Escalante Raul <[email protected]>; Fannar Gíslason <[email protected]>; Francisco Esteban Lefler <[email protected]>; AERTS Freddy <[email protected]>; Geert Van Cappellen <[email protected]>; Maria Graça Neves <[email protected]>; gucma l <[email protected]>; gucma m <[email protected]>; Hector Estrella Miole <[email protected]>; indonesia 1 ([email protected]) <[email protected]>; indonesia 2 ([email protected]) <[email protected]>; indonesia FD3 - Ridwan Djamaluddin ([email protected]) <[email protected]>; iraanse sectie <[email protected]>; Mohammad Reza Allahyar <[email protected]>; James R.D. <[email protected]>; Jaroslav Bimka <[email protected]>; Jens Kirkegaard <[email protected]>; Jos� Badia <[email protected]>; José jairo estrada daza ([email protected]) <[email protected]>; Jurong Port <[email protected]>; Jurong Port <[email protected]>; Kaidi Katus <[email protected]>; Katrin.Haselbauer <[email protected]>; Khanzadi <[email protected]>; Ljubisa Mihajlovic <[email protected]>; Luis Eduardo Luvizotto Lolli <[email protected]>; Luisa Ottolenghi <[email protected]>; Magenthran Ruthenavelu <[email protected]>; masaki yoneyama ([email protected]) <[email protected]>; Michael Behrendt <[email protected]>; Wolters, Milou (WVL) <[email protected]>; Nadia Laraki ([email protected]) <[email protected]>; Natalia Suarez <[email protected]>; Olle Lewis ([email protected]) <[email protected]>; olli.holm <[email protected]>; Delgado <[email protected]>; pianc USA ([email protected]) <[email protected]>; Poolse FD <[email protected]>; Rogelio Gordon <[email protected]>; Romeo Ciortan <[email protected]>; Paul Scherrer <[email protected]>; Esa Sirkiä <[email protected]>; Steve Kwok <[email protected]>; s.atanasova <[email protected]>; Tran <[email protected]>; urs.maurer <[email protected]>; Kayla Waltemire <[email protected]>; Velly Indonesia <[email protected]>; vietnam fd2 <[email protected]>; Wangsvik Fridtjof <[email protected]>; Xu Weijia <[email protected]>; Vandevoorde Carine <[email protected]>; Ana Lope Carvajal <[email protected]>; [email protected] <[email protected]>; chaves <[email protected]>; Fabio Zapata <[email protected]>; fabrice.daly <[email protected]>; Buffel Frederik <[email protected]>; Gabriele.Peschken <[email protected]>; William Glamore <[email protected]>; Higashiyama S. <[email protected]>; Hyun Dong Kim <[email protected]>; yoneda <[email protected]>; jmuskatirovic <[email protected]>; joe manous ([email protected]) <[email protected]>; Johan Boon <[email protected]>; Johan en Remi - sec ned sectie <[email protected]>; laurent.luchez <[email protected]>; liina <[email protected]>; Marisa Ackhurst <[email protected]>; Moira Doherty <[email protected]>; raul oberrauter <[email protected]>; sebastian garcia <[email protected]>; tero sikio <[email protected]>; Tore Lundestad <[email protected]>; Francisco Javier Zapata <[email protected]>; Zi Qian Yang <[email protected]> Cc: González Patiño, Noelia <[email protected]> Subject: setting-up new PIANC MarCom WG 232 on Metocean-related risks during the construction of marine works Dear All, See attached files, Kind regards, Sabine Van de Velde PIANC GENERAL SECRETARIAT Graaf de Ferraris - 8th Floor 20, Boulevard du Roi Albert II B3 - 1000 Brussels - BELGIUM Tel: + 32 2 553 71 61 E-mail: [email protected] Web: www.pianc.org PIANC MarCom WG 232 METOCEAN-RELATED RISKS DURING THE CONSTRUCTION OF MARINE WORKS Terms of Reference 1. Historical Background Waterborne Transport Infrastructure is frequently subject to the effect of maritime climate action both in service and during construction. This is typically the case for dredging works, breakwaters, open sea jetties and dolphins, as well as undersea pipelines and cables, offshore wind farms and other offshore elements. The many aspects of sea-soil-structure interaction in this hostile environment add specific risks to those usual in civil construction. Marine climate is primarily defined by winds, tides, waves and sometimes ice. Sea climate actions in service are usually analysed in detail at the design stage both for ultimate and serviceability limit states as well as for operational performance. However, conditions during construction have a great impact on cost and construction schedule and can be the source of major delays and cost overruns with complex contractual implications. These affect risk sharing between the different agents and to the definition and application of downtime and force majeure clauses. Other natural hazards such as earthquakes and tsunamis are less likely to be determinant during construction although in areas with high seismic activity need to be considered, taking into consideration the duration of the construction stage. 2. Objectives of the Working Group This Working Group will provide a guidance document on marine climate risks and risk management directly related to the construction stage of projects in the marine environment. 3. Scope The Working Group is expected to cover the following topics: • Sources of uncertainty • Risk analysis: climate analysis, risks of damage or failure of the works in progress, impact on construction tolerance and downtime and on Safety and Health. • Tools for assessment: o Available data on sea climate o Hazard analysis related to the construction period o Climate forecast for the construction stage TOR Met-ocean related risks during the construction of Marine Works 1 26-05-2020 oSea-soil structure interaction analytic, numerical and physical models. o Simulations of construction processes for analysis • Design strategies: consideration of construction risks at the design stage. Resilient design facing construction risks. • Mitigation strategies at the construction stage: o Implementation of accurate sea climate forecast procedures during construction o Digitization: connected sites with sensors related to wave climate, equipment and soil and structure response including temporary elements and during all construction stages. Real time data analysis is required for achieving efficiency, safety and reliability o Review of design improving resilience and reducing damage probability o Selection of appropriate equipment o Selection of best available construction technologies, seasonal construction, etc. o Use of statistical simulation techniques in advance to real construction in order to support the best technical options and assess the impact of different scenarios on potential cost and delays as well as the efficiency of mitigation measures. Scenarios can cover variable climate scenarios and alternatives for construction schedule, equipment and technologies • Contractual framework based on appropriate and transparent risk sharing and a reliable risk management program • Impact on insurance • Integrated management of marine climate risk during construction through the implementation of specific operational integrated systems • Case studies 4. Existing documents to be reviewed PIANC MarCom Reports to be reviewed include: • WG 31-2001 Life-Cycle Management of Port Structures - General Principles • WG 103-2008: Life Cycle Management of Port Structures, Recommended Practice for Implementation • WG 196-2016: Criteria for the selection of Breakwater types and their related optimum safe levels • Finished and ongoing WGs on specialized and multipurpose terminals • Ongoing WG 194 A Framework for Early Contractor Involvement in Infrastructure Projects Other bibliography and Congress papers related to the topic should also be analysed, including • Construction Risk in Coastal Engineering, published by Thomas Telford, London, 1988. • Construction Health and Safety in Coastal and Maritime Engineering, Thomas Telford, London, 2005. TOR Met-ocean related risks during the construction of Marine Works 2 26-05-2020 5. Suggested product of the Working Group The suggested product of the Working Group will be a guidance document with recommendations for best practice for construction risk management and case studies related to sea climate, for owners, designers, contractors and insurance companies. 6. Desirable Disciplines of the Members of the Working Group The WG should ideally include owners and concessionaries, engineering consultants, contractors and dredging companies, insurers, and experts in risk analysis. 7. Relevance for Countries in Transition The report will be valuable for the development of port infrastructure in countries in transition helping in mitigation of construction risks and their undesired effects. 8. Climate Change Considerations The probability and magnitude of extreme events during the construction stage cannot be estimated only on the basis of conditions during previous decades, and should allow for the tendency for future extreme events to be more severe even in the short term. Nevertheless major relevant features of climate change such as sea level rise, increased storminess, more severe precipitation events and higher temperatures are generally related to a much longer time frame than the construction stage and will not necessarily be relevant. 9. Relevance to UN Sustainable Development Guidelines The guideline will contribute to the Sustainable Development Goals (SDGs) approved by the United Nations in 2015, particularly the development of quality, reliable, sustainable and resilient infrastructure (SDG9). TOR Met-ocean related risks during the construction of Marine Works 3 26-05-2020 PIANC MarCom WG 232 METOCEAN-RELATED RISKS DURING THE CONSTRUCTION OF MARINE WORKS Terms of Reference 1. Historical Background Waterborne Transport Infrastructure is frequently subject to the effect of maritime climate action both in service and during construction. This is typically the case for dredging works, breakwaters, open sea jetties and dolphins, as well as undersea pipelines and cables, offshore wind farms and other offshore elements. The many aspects of sea-soil-structure interaction in this hostile environment add specific risks to those usual in civil construction. Marine climate is primarily defined by winds, tides, waves and sometimes ice. Sea climate actions in service are usually analysed in detail at the design stage both for ultimate and serviceability limit states as well as for operational performance. However, conditions during construction have a great impact on cost and construction schedule and can be the source of major delays and cost overruns with complex contractual implications. These affect risk sharing between the different agents and to the definition and application of downtime and force majeure clauses. Other natural hazards such as earthquakes and tsunamis are less likely to be determinant during construction although in areas with high seismic activity need to be considered, taking into consideration the duration of the construction stage. 2. Objectives of the Working Group This Working Group will provide a guidance document on marine climate risks and risk management directly related to the construction stage of projects in the marine environment. 3. Scope The Working Group is expected to cover the following topics: • Sources of uncertainty • Risk analysis: climate analysis, risks of damage or failure of the works in progress, impact on construction tolerance and downtime and on Safety and Health. • Tools for assessment: o Available data on sea climate o Hazard analysis related to the construction period o Climate forecast for the construction stage TOR Met-ocean related risks during the construction of Marine Works 1 26-05-2020 oSea-soil structure interaction analytic, numerical and physical models. o Simulations of construction processes for analysis • Design strategies: consideration of construction risks at the design stage. Resilient design facing construction risks. • Mitigation strategies at the construction stage: o Implementation of accurate sea climate forecast procedures during construction o Digitization: connected sites with sensors related to wave climate, equipment and soil and structure response including temporary elements and during all construction stages. Real time data analysis is required for achieving efficiency, safety and reliability o Review of design improving resilience and reducing damage probability o Selection of appropriate equipment o Selection of best available construction technologies, seasonal construction, etc. o Use of statistical simulation techniques in advance to real construction in order to support the best technical options and assess the impact of different scenarios on potential cost and delays as well as the efficiency of mitigation measures. Scenarios can cover variable climate scenarios and alternatives for construction schedule, equipment and technologies • Contractual framework based on appropriate and transparent risk sharing and a reliable risk management program • Impact on insurance • Integrated management of marine climate risk during construction through the implementation of specific operational integrated systems • Case studies 4. Existing documents to be reviewed PIANC MarCom Reports to be reviewed include: • WG 31-2001 Life-Cycle Management of Port Structures - General Principles • WG 103-2008: Life Cycle Management of Port Structures, Recommended Practice for Implementation • WG 196-2016: Criteria for the selection of Breakwater types and their related optimum safe levels • Finished and ongoing WGs on specialized and multipurpose terminals • Ongoing WG 194 A Framework for Early Contractor Involvement in Infrastructure Projects Other bibliography and Congress papers related to the topic should also be analysed, including • Construction Risk in Coastal Engineering, published by Thomas Telford, London, 1988. • Construction Health and Safety in Coastal and Maritime Engineering, Thomas Telford, London, 2005. TOR Met-ocean related risks during the construction of Marine Works 2 26-05-2020 5. Suggested product of the Working Group The suggested product of the Working Group will be a guidance document with recommendations for best practice for construction risk management and case studies related to sea climate, for owners, designers, contractors and insurance companies. 6. Desirable Disciplines of the Members of the Working Group The WG should ideally include owners and concessionaries, engineering consultants, contractors and dredging companies, insurers, and experts in risk analysis. 7. Relevance for Countries in Transition The report will be valuable for the development of port infrastructure in countries in transition helping in mitigation of construction risks and their undesired effects. 8. Climate Change Considerations The probability and magnitude of extreme events during the construction stage cannot be estimated only on the basis of conditions during previous decades, and should allow for the tendency for future extreme events to be more severe even in the short term. Nevertheless major relevant features of climate change such as sea level rise, increased storminess, more severe precipitation events and higher temperatures are generally related to a much longer time frame than the construction stage and will not necessarily be relevant. 9. Relevance to UN Sustainable Development Guidelines The guideline will contribute to the Sustainable Development Goals (SDGs) approved by the United Nations in 2015, particularly the development of quality, reliable, sustainable and resilient infrastructure (SDG9). TOR Met-ocean related risks during the construction of Marine Works 3 26-05-2020 PIANC The World Association for Brussels, 27 May 2020. Waterborne Transport Infrastructure To the First Delegates of the Qualifying Members of PIANC To the National Sections’ Secretaries of PIANC To the Platinum Partners of PIANC To The Sister Associations of PIANC Subject: Setting up of a new PIANC Working Group 232 on “Metocean-related risks during the construction of marine works” Dear Madam, Dear Sir, The setting up of a Joint PIANC MarCom Working Group 232 on “Metocean-related risks during the construction of marine works”, has duly been approved as well as its terms of reference, which are herewith enclosed. We kindly ask you to inform the secretariat of MarCom by 1 August 2020 (copy to the General Secretariat) about the name, qualification and (e-mail-) address of the expert, proposed by your country/organisation. Please enclose a brief curriculum vitae of the proposed expert together with some details about her/his professional experiences. An additional expert per country/organisation, being a young professional, can participate in the Working Group activities. Further I would like to remind you that Working Group Members should either be Individual Member of PIANC, working for a Corporate Member or Platinum Partner, be an invited expert or a be a member of a Sister Organisation. We remind you that in accordance with PIANC rules, the costs incurred in taking part in Working Group activities are borne by the member countries/organizations. We thank you beforehand for your collaboration. Yours sincerely, Geert Van Cappellen, Secretary-General. Reply to: Ms Noelia Gonzalez [email protected] PIANC The World Association for Brussels, 27 May 2020. Waterborne Transport Infrastructure To the First Delegates of the Qualifying Members of PIANC To the National Sections’ Secretaries of PIANC To the Platinum Partners of PIANC To The Sister Associations of PIANC Subject: Setting up of a new PIANC Working Group 232 on “Metocean-related risks during the construction of marine works” Dear Madam, Dear Sir, The setting up of a Joint PIANC MarCom Working Group 232 on “Metocean-related risks during the construction of marine works”, has duly been approved as well as its terms of reference, which are herewith enclosed. We kindly ask you to inform the secretariat of MarCom by 1 August 2020 (copy to the General Secretariat) about the name, qualification and (e-mail-) address of the expert, proposed by your country/organisation. Please enclose a brief curriculum vitae of the proposed expert together with some details about her/his professional experiences. An additional expert per country/organisation, being a young professional, can participate in the Working Group activities. Further I would like to remind you that Working Group Members should either be Individual Member of PIANC, working for a Corporate Member or Platinum Partner, be an invited expert or a be a member of a Sister Organisation. We remind you that in accordance with PIANC rules, the costs incurred in taking part in Working Group activities are borne by the member countries/organizations. We thank you beforehand for your collaboration. Yours sincerely, Geert Van Cappellen, Secretary-General. Reply to: Ms Noelia Gonzalez [email protected]
Allikas: Veeteede Amet dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel