EMP kliimaprogrammi lõpparuande esitamine 2025
Austatud härra Rannap
Edastame EMP toetuste 2014–2021 programmi „Kliimamuutuste leevendamine ja nendega
kohanemine“ lõpparuande.
Lugupidamisega
(allkirjastatud digitaalselt)
Tanel Ross
finantsosakonna juhataja
Lisad: Programmi „Kliimamuutuste leevendamine ja nendega kohanemise“ lõpparuanne
Lisaadressaadid:
[email protected],
[email protected]
Eleri Seer, 605 0298
[email protected]
Suur-Ameerika 1 / Tallinn 10122 / 626 2802/
[email protected] / www.kliimaministeerium.ee/
Registrikood 70001231
FINAL PROGRAMME REPORT
FM14-21
Estonia
Climate Change Mitigation and Adaptation
Programme short name EE-CLIMATE
Programme Operator Ministry of Climate - Estonia (EE)
Host Programme Area PA13 Climate Change Mitigation and Adaptation
Financial Mechanisms EEA Grants
Programme grant in EUR € 6,000,000.00
Programme co-financing in EUR € 1,058,823.53
Final incurred amount in EUR € 6,784,488.57
Final incurred rate % 96.11 %
PROGRAMME RESULTS
Programme Objective: Climate change mitigated and vulnerability to climate
change reduced
Eligible expenditure: € 7,058,823.53 Amount incurred: € 6,784,488.57
Issues the programme aimed to address
The main objective of the Programme was to mitigate climate change and reduce the vulnerability to
climate change in Estonia. The Programme aimed to contribute substantially to the transition to a low-
carbon circular economy in Estonia in a smooth, inclusive and informed manner. The resolution of the Estonian
Parliament “General Principles of Climate Policy until 2050“states that Estonia needs a transition to a low-
carbon economy. The long-term target (which also follows EU common aim) of Estonia is to reduce greenhouse
gas emission by 80% by 2050 compared to the emission levels of 1990. The framework and long-term goal for
the environment is set by the Estonian Environmental Strategy 2030 where one of the main objectives is the
sustainable use of natural resources and reduction of waste generation. It can be reached inter alia through the
successful implementation of circular economy. The policy framework consists of many international,
European and national strategies and policies.
The programme “Climate Change Mitigation and Adaption” was implemented in cooperation with the
donor Programme partner Norwegian Environment Agency. The grants were aimed at projects that
promote economic growth, innovation and sustainable development and strengthen capacities in
various fields such as education, environment, culture and social inclusion. Two projects were also
implemented to increase the resilience of ecosystems.
The implementation of climate change adaptation activities has had social, environmental, and
economic impacts on various target groups and contributed to broader awareness-raising. One of the
most significant impacts already observed is the public attention these activities have garnered.
Several project promoters share their experiences regarding the maintenance, establishment, and
management of green areas, wind and solar parks, and the overall application of nature-based
solutions. This influence will persist for years to come, as knowledge-sharing is not a one-time
activity.
Programme contribution to overall objectives
The Programme contributes to the overall objective of the relevant Programme area, which is to
mitigate climate change and reduce the vulnerability to climate change. The Programme achieved its
aim. The Programme established some important measures and pilots that were needed to mitigate
climate change and reduce the vulnerability to climate change at local level and made an important
contribution to raising awareness about climate change. For example, as a result of the Programme
Keila City Government developed green roof for public song festival ground, which helps to increase
biodiversity and Tartu City Government developed reuse material bank, which helps to reduce
2 Version 4.0 as of 17/04/2025 17:53:40 CEST
construction material waste. Both examples help to raise public awareness about climate change.
Viljandi and Tallinn Cities developed public water taps around the cities, that help adapting to reduce
the effects of climate change, such as heat waves.
The Programme contributed to the overall objectives of the EEA Financial Mechanism. First, it
promoted the social and economic cohesion in the EEA. As Estonia had some insufficiencies in the
field of climate change in the EEA (e.g. public awareness and involving local level, etc.), some of these
areas were addressed in the Programme, for example development local level energy and climate
plans and development of educational materials for school students were part of the Programme.
Before the Programme those areas weren`t enough important in Estonia, for example, since the
Programme started, only two biggest cities (Tallinn and Tartu) had adopted their energy and climate
plans. Also, all the built green areas are accessible to people with mobility impairment.
The Programme also contributed to the second important overall objective – bilateral cooperation.
Cooperation with the donor states took place at all levels – at programme and projects preparation
level as well as at implementation level. The Programme has significantly contributed into encouraging
cooperation between Estonia and Donor states. Cooperation between Estonia and Donor states has
been successful and there are many new ideas about how to continue the cooperation in the future.
For example, Tallinn City Government continues good cooperation with Oslo City Government.
At the Programme level, there was a fruitful and effective bilateral cooperation with Donor Programme
Partner (DPP) Norwegian Environment Agency from Norway. The close cooperation has been a key
factor for achieving the goals of the Programme. The Programme would have not been as successful
without the cooperation with DPP. They helped to search partners and organise cooperation
committee meetings, evaluate the projects etc. Close communication with DPP was particularly
important during the Programme preparation and implementation phase. DPP is very skilled and has a
long experience with international cooperation. The help provided by DPP was extremely valuable,
relevant and appreciated.
Sustainability
In Outcome 1 public awareness and stakeholder engagement were significantly increased, ensuring a
broader societal impact and supporting long-term sustainability goals. Key outcomes include the use
of developed materials, methodologies, and research in education and public awareness efforts.
Additionally, a maritime impact assessment framework is being created using and leveraging project-
acquired knowledge. Output 1 contributed with of high-quality scientific data and methodologies to
Estonia's strategic documents, plans, and methodologies. A significant focus is also placed on
analyzing the pathways of 10 alien species and mapping these pathways, which serves as the
foundation for Estonia's forthcoming invasive alien species pathways action plan.
The use of eDNA methods in broader monitoring is relatively expensive, but in this regard too, the
Estonian Environmental Agency, which is responsible for national monitoring, plans to further develop
the methods and analyze in which situations eDNA methods should be used more, which could
replace repeated visits by several experts to the same areas and save experts' working time.
The sustainability of Outcome 2 climate change mitigation and adaptation project activities is best
ensured. These are mainly ensured by long-term maintenance contracts and cooperation partners,
maintenance plans or the position of urban gardening coordinator. In terms of cooperation and
networks, several donor partners pointed out that contacts with Estonian partners have been
maintained and several donor partners also have ongoing projects with Estonian partners, some even
with new partners.
In Outcome 2, 34 of 79 Estonian local municipalities got climate change mitigation and adaptation
plans thanks to EEA Grants. A lot of municipalities are not able to implement their action plan, as they
3 Version 4.0 as of 17/04/2025 17:53:40 CEST
don’t have enough finances in their municipalities budget. In case of suitable financing instrument,
they are most interested in implementing the climate and energy action plans.
In Outcome 3 The sustainability of pilot projects is ensured by the further implementation of the expert
knowledge gained during the projects, the maintenance of contact networks established with the donor
country, and the ongoing management and maintenance of the pilot project outputs. The sustainability
of the majority of the outputs created within the framework of the pilot projects (repair workshops,
circular economy centres, circular renovation banks) requires a functioning business model, which
ensures the profitability of the output over a longer period.
Outcome 1: Ecosystem resilience increased
Amount incurred: € 748,266.67
Results
Invasive alien species are a major driver of biodiversity loss. An analysis of the IUCN Red List shows
that invasive alien species are the second most common threat associated with species that have
gone completely extinct and are the most common threat associated with extinctions of amphibians,
reptiles and mammals worldwide. There is a strong link between invasive alien species and climate
change, which have ecological and economic implications. Invasive alien species enter new areas
both through intentional and unintentional releases, both can have detrimental effects on the
ecosystem health and functioning. Where possible, invasive species should be controlled, contained
or eradicated in the affected areas. In aquatic ecosystems interception or removal of pathways are
probably the most effective strategies for reducing their future impacts.
The programme delivered substantial progress in managing invasive alien species and enhancing
ecosystem resilience. It strengthened understanding of the spread, impacts, and control of these
species, contributing to the development of preventive and mitigation strategies. The integration of
project findings into national systems and methodologies supports improved decision-making in
environmental management. Innovations in monitoring and biocontrol provided practical tools for
efficient species management, reducing resource intensity. Public awareness and stakeholder
engagement were significantly increased, ensuring a broader societal impact and supporting long-term
sustainability goals.
The projects achieved all output-level results, significantly contributing to knowledge and management
of invasive species in freshwater and marine ecosystems.
Key results include the analysis of entry routes for 10 invasive alien species, enabling preventive
measures to protect Estonia's environment. The potential for spread in Estonia’s climate was
assessed, and control methods for three invasive crayfish species (signal, spiny cheek, and marbled
crayfish) were developed and implemented across multiple freshwater locations. Over 20,000 non-
native crayfish were removed from 20 water bodies, while indigenous waterweed (Elodea nuttallii)
presence was analysed from 27 lakes.
A workshop and training sessions for environmental protection officials improved skills in identifying
non-native crayfish and waterweed, supporting long-term species management. Public outreach
included booklets, articles, ferry advertisements, and appearances on widely watched Estonian TV
shows. Two academic theses advanced research on the role of European eels as biocontrol agents
and the impact of fisheries on signal crayfish populations.
An innovative eDNA method, developed with a Norwegian partner, was tested to detect species in
water bodies via water samples. A children's book on invasive species further enhanced public
4 Version 4.0 as of 17/04/2025 17:53:40 CEST
awareness. Collaboration with donor state partners facilitated joint results and ongoing knowledge
exchange.
Public engagement ensured knowledge dissemination and fostering community involvement in
environmental protection
The project on marine invasive species evaluated the carbon sequestration potential of coastal
habitats, adapted vegetation restoration methods to Estonian conditions, and tested them on Prangli
Island’s southern coast. It assessed the environmental and ecosystem service impacts of 14 invasive
species, modeled their spread, and conducted eDNA-based monitoring in three major ports. An online
tool on non-indigenous indigenous species and their impacts onto amrine environment is made
publicly available. eDNA and new monitoring methods will be used for long-term in national marine
monitoring programme. The findings expanded data on invasive species impacts and led to a 5-step
impact assessment guide developed together with Norwegian Institute of Marine Research.
Together, these achievements have improved knowledge, raised awareness, and advanced the
management of invasive species, benefiting municipalities, environmental experts, and the public. The
projects’ legacy continues through national and international collaborations, innovative tools, and
public resources.
Performance of projects was rated very high: all objectives were fully achieved.
High quality scientific data and methodologies are base for and contribute to Estonias strategic
documents, plans and methodologies "Estonia 2035", "Climate Policy 2050", example seagrass
restoration plan under EU Nature Restoration Law, and incorporating invasive species impact
assessments into Estonian Marine Strategy updates. Analysis of the income pathways of 10 alien
species and mapping the main income pathways is bases for the preparation of the next income
pathways action plan.
Key sustainability outputs are wide use of knowledge and materials:
teaching in general education and higher education institutions,
raising public awareness on environmental issues and non-ingenous species,
a uniform methodology for assessing the effects of non-ingenous species to marine
ecosystems is being created, based on the knowledge gained during the project.
The specific knowledge of the donor country partner Norwegian Veterinary Institute on eDNA topics
helped to achieve the goals set by the project teams in Estonia and to develop eDNA-based
monitoring methodologies for new alien species at both, the University of Tartu and the Estonian
University of Life Sciences. Cooperation between research institutions in similar projects is of great
importance, as it increases the capacity of research institutions to develop new methodologies and
create new knowledge that did not previously exist in the research institution.
Challenges and Lessons Learned
For publishing scientific articles, the implementation period was too short. It takes approximately 6
months to get an article published after all the implementation activities are completed. Fortunately, it
was possible to publish the article with the help of PO, as the article was published using program
management costs.
Public procurements are still an issue and needs more clarification, possibly even a training, as there
were a few smaller irregularities related to that. Especially framework agreements and different
eradication services ordered from private fishermen as they are not considered as employment
5 Version 4.0 as of 17/04/2025 17:53:40 CEST
agreement but as providing a service, therefore should be done as a procurement when the estimated
cost exceed the threshold of public procurement.
Evaluation report brough out some challenges bureaucracy and administrative burden (such as
applying for chemical licences and reporting complexity). A challenge was also non-fulfilment of partners'
obligations and change of project manager in the Norwegian partner institution.
Outcome 2: Increased ability at the local level to reduce emissions and adapt to
a changing climate
Amount incurred: € 3,814,611.34
Results
To achieve GHG emissions reduction goals by 2050, it is important to raise awareness on climate
change. Awareness on climate change is not as widespread and understood as more general
environmental awareness. A study from 2024 about the environmental awareness of Estonian citizens
indicates that awareness of climate change is relatively low compared to other environmental issues.
At the local level it is important to raise awareness how climate is changing and how to adapt to it. We
had three different objectives to achieve Outcome 2. The first objective was to raise awareness
starting from kindergarten. Collaboration of universities have redesigned the curricula upto the end of
gymnasium.
The small grant scheme (Call 1 of SGS) of ‘Climate change mitigation and adaptation plans’ exceeded
the PO-s expectations as it was very popular among local municipalities. With 10 implemented
projects (Keila, Narva, Pärnu, Rakvere cities and Tartu, Pärnu, Jõgeva, Võru, Lääne and Lääne-Viru
counties (6 county level and 4 municipality level plans)) 34 local municipalities received input to their
local strategical documents with the compilation of a climate change mitigation and adaptation plan
and to be in compliant with national and EU strategies. This plan made the local municipalities think
about the actions necessary to take in the near future to adapt to and mitigate the effects of climate
change.
With the implementation of Call 2 ‘Climate change mitigation and adaption measures’ 8 municipalities
with 9 projects all together had the chance to implement activities that are necessary to take in order
to adapt to and/or mitigate the effects of climate change.
Within 6 different projects’ demonstration areas for climate education and/or community gardens were
built to raise awareness of the importance of soil, plants, biodiversity and harvesting, even of
pollinators. These activities were implemented in kindergartens (Kohtla-Järve EE0023), schools
(Viljandi EE0026), educational centres (Pernova EE0025) and public areas (Keila EE0022, Tori
EE0021, Tallinn EE0024). That raises the awareness of people from a very young age to the elderlies.
Pernova education centre developed 4 climate change learning programs for schools and other target
groups
Restoring ruined alleyways in Põltsamaa (EE0019) or planting trees in big, mowed areas, like in
Kohtla-Järve city (EE0023), is participating in mitigating the heat island effect in cities, also acting as a
rainwater collectors when the trees are bigger, and preventing flooding. Together with other
constructed nature-based solutions a whole public area of the singing ground in Keila City (EE0022)
has been transformed into a green area with biodiverse flower beds, flower meadows, scent gardens
and rain-beds, and unites the nearby areas smoothly with nature. Setting an example by the local
municipality the residents can also start to implement these activities on their own land, making
biodiversity more popular and common. These activities have also been implemented in other cities
like Tori, Kohtla-Järve, Põltsamaa and Viljandi.
6 Version 4.0 as of 17/04/2025 17:53:40 CEST
Three projects installed rainwater recovery systems to reduce flooding in the urban areas of Märjamaa
(EE0018), Keila and Pernova. Using rainwater to store it and using it when draught hits, is a great
example of giving back to nature what it provides.
Drinking water was made available by constructing public drinking water taps in Tallinn (15) and
Viljandi (6).
With the help of renewable energy solutions two project promotors are now more energy efficient and
have reduced their CO2 emissions which also has an impact on achieving our 2030 renewable energy
goals – in Kohtla-Järve installed 8 solar stations on the roofs of public buildings, in Pernova center
solution using wind and solar energy with storage capacity.
The implementation of climate change adaptation activities has had a social, environmental and
economic impact on various target groups and has contributed to a wider awareness. In the case of
these activities, one of the biggest impacts that has already been seen is public attention. Several
project implementers are sharing experiences on the maintenance of green areas, the maintenance
and construction of wind and solar parks, and the implementation of general nature-based solutions. A
similar impact will be seen in the years to come, as sharing experiences is not a one-off activity.
Green solutions (such as flower fields and gardens in city parks) have made urban spaces more
natural and visually attractive. Project implementers have refuted the perception that natural solutions
are complex and high-maintenance. Biodiversity has also been increased in urban environments by
supporting insect and plant habitats. The installation of water taps in cities has received positive
feedback, providing people and pets with access to drinking water, which is especially important from
a climate change adaptation perspective, as extreme weather events become more frequent.
Challenges and Lessons Learned
The small grant scheme of ‘Climate change mitigation and adaptation plans’ was supposed to be a
quick drafting of the plans, but in reality covid pandemic had a big effect and the war in Ukraine, both
which delayed the implementing of the plans. So, for strategic documents, more time than a year
would be needed to make a good, thorough and feasible plan.
The ‘Climate change mitigation and adaption measures’ call was an example of doing big things in a
relevantly relatively small amount of time. Although all activities were implemented within the eligibility
period it was a big challenge and took more effort from Project Promoters. As a take-away from this,
calls with construction activities or those which activities are affected by climate should be announced
some months earlier. That would give the promoters reassurance that if a procurement fails or is
disputed, they have a buffer time to publish it again.
In evaluation report it was brought out that for projects main challenges for local governments’
energy and climate plans and climate change mitigation activities were short implementation time,
high construction prices and seasonal problems, bureaucratic obstacles and administrative
burden and complexities in the preparation of local governments’ energy and climate plans;
also monitoring of indicators: outdated data and complex monitoring capacity in local
governments.
Public procurements for local municipalities are still a struggle, as there was at least one irregularity.
For the upcoming period a training for granted projects about how to conduct procurements, should be
highly recommended.
The involvement of donor partners helped to somewhat extence increase the effectiveness of the
projects. In the broad sense, the role of donor partners was to share experiences and knowledge with
the Estonian project teams, and this purpose was fulfilled by the donor partners excellently. Project
7 Version 4.0 as of 17/04/2025 17:53:40 CEST
partners and implementers agreed that the donors were an excellent addition to the project with their
knowledge and experience. Even those implementers who did not directly involve donor partners in
their projects had the opportunity to visit Norway and participate in the sharing of experiences. Thus,
the sharing of experiences was not hindered by the fact that the donor partner was not a direct project
partner.
Regarding donor partners, the biggest challenge for Estonian implementers was finding them. Since
there was not much time to write the project, many did not include a donor partner because the donors
did not have time to respond to the Estonian partners or to sort out the affairs in their institutions.
Example of good practice on programme level is overbooking in the funds by supporting additional
project in reserve list – this gave one more project opportunity to implement their activities. Overall
effect to programme finances – was reducing the leftovers.
Outcome 3: Framework for Circular Economy strengthened
Amount incurred: € 1,559,251.67
Results
Outcome 3 focused on increasing capacity for the circular economy.
Within the framework of the project “Increasing the capacity of the circular economy”, a circular
economy strategy “Circular Economy White Paper” was prepared; officials, environmental specialists,
and general education schoolteachers were trained; contributions were made to raising awareness in
the sector more broadly, and proposals were developed for local governments to improve the circular
economy. The project was implemented in cooperation with the Norwegian research institute SINTEF,
which contributed to the project with its own analysis and research capacity.
The pre-defined project (EE0013) of enhanced capacity on circular economy made it possible for all
municipalities in Estonia to start with the circular economy as personal circular economy roadmaps
with action plans were developed. Municipality officials were also trained with a circular economy
training plan and an electronic manual created within this project. Criteria for five new categories of
green public procurement were developed, which can be used by public sector procurers in their
procurement process: textile products and services, design and construction of office buildings, design
and construction of roads, food products and services, food vending machines, and electricity. We
now have environmental criteria for public procurement in 10 categories. Practical training sessions on
green public procurement were held, and guidance materials along with short instructional videos were
developed.
For children, two environmental educational games were created along with tools for general
education schoolteachers to address circular economy topics in schools. For the general public in
Estonia, numerous awareness-raising activities took place, such as conferences, fairs, media
campaigns, electronic materials, and the development of a dedicated webpage. The sub-activities of
the project were diverse, contributing to various areas, including municipalities, schools, the public
sector, awareness-raising, guidelines, study trips, and different events and training programs.
With the call 4 “Circular economy pilot projects” the purpose of the grant was to contribute to the
development of the circular economy and the introduction of more environmentally sustainable
solutions by the public sector. In the frame of this call projects, there are implemented innovative pilot
projects that use circular principles and identify the effect of implementation it.
With an open call, three projects were granted to pilot circular economy ideas in local municipalities.
One of the most useful solutions for the public were created by the capital city of Tallinn (EE0014),
8 Version 4.0 as of 17/04/2025 17:53:40 CEST
which concentrated on the creation of a reuse and repair society with 2 reuse rooms (for people to
give/take reusable goods for free), 4 repair workshops (to mend different items, such as furniture,
textile, wooden items and bicycles) and 2 sewing workshops, which are open for public usage.
Tartu city government (EE0017) piloted methods to prove building materials circularity usage – they
developed methods for the usage of leftover materials from renovation and demolition projects. And to
demonstrate it, they used circular usage building materials to construct public bicycle pavilions in four
locations in the city. Also, a circular usage bank was opened for reusable construction materials. The
most important goal of the project was that the principles of the circular economy are now integrated
into the process of the renovation wave taking place in the city of Tartu.
The third municipality who piloted the circular economy was Rae (EE0015) with the aim to reduce the
environmental footprint of Rae municipality and to lay the foundation for the municipality to achieve
zero emissions, thereby contributing to the mitigation of climate change both in Rae municipality and in
Estonia in general. They measured the carbon footprint and circular economy potential of the public
sector in their municipality and amongst the enterprises in Rae also. With an awareness-raising
campaign, they conducted a competition for schools and kindergartens to implement innovation plans
as an example for others. The innovative ideas were an installed food-sharing cabinet/fridge, an off-
grid outdoor kitchen with a rainwater collection system and solar panels, a cargo bike for commuting
and field trips to reduce fossil fuel transportation, a composter for biowaste, and a learning and DIY art
and crafts material cabinet for sharing and waste reduction.
With the PO mid-term and final events, all municipalities had a chance to get acquainted with these
solutions and get ideas on how to implement their own circular economy solutions in the future.
The results of all three projects raised the awareness of these municipalities about circular
economy issues and helped to launch additional activities outside the performance framework,
which have a wider benefit for local residents. The creation of circular economy points in
Tallinn, the preparation of the opening of the Lilleküla circular economy center and the opening
of Estonia's first circular economy bank in Tartu can be considered separate success stories
of the pilot projects
The implementers of all three projects assessed the greatest value of involving a foreign partner as the
opportunity to learn from Norwegian good practices on how to effectively implement activities that
promote the circular economy.
Challenges and Lessons Learned
There is interest in the circular solutions, but economic restrictions, including the ban on earning
income, limit the sustainability of pilot solutions. When planning the next programming period, the
economic sustainability of project outputs and the need for a functioning business model should be
considered more thoroughly than before. Including, if the applicant's project output requires a
functioning business model due to sustainability, then direct them to prepare the application in such a
way that profit-making from the output is permitted.
The implementing agency organized seminars for project promotors where all projects presented their
activities and achievements was warmly welcomed by the PPs. All projects had the opportunity to hear
and see what other pilot projects are implementing. The suggestion from PPs was that for a possible
collaboration or to learn from each other, the meetings should have started from the beginning, not
halfway through the implementation period.
In evaluation report it was brought out that the management of the outputs of the pilot projects (Tartu,
Tallinn) are still under risk as the bussiness model and the operator's motivation are of decisive
importance. Also some of the impacts of works done appear only over a longer lifespan, eg system of
9 Version 4.0 as of 17/04/2025 17:53:40 CEST
environmentally friendly public procurements. This should promote sustainable materials and products
with a longer lifespan. The potential positive impact is both economic and environmentally friendly, but
it is still too early to assess.
Bilateral Outcome: Enhanced collaboration between beneficiary and donor
state entities involved in the programme
Results
The Climate program in general had good results with bilateral relations, more than half of the projects
implemented had a donor state partner, so 14 out of 26 projects, which considering the pandemic was
a good result.
In outcome 1 both projects are continuing their cooperation with their donor state partners from
Norway (Norwegian Institute of Marine Research and Norwegian Veterinary Institute). The knowledge
gained from the project has helped both countries’ specialists.
Some local municipalities had contacts from Norway before the implementation of EEA grants
projects, for example Tartumaa Association of Local Authorities (EE0002) or Association of Local
Governments of Lääne County (EE0006) and their cooperation will also continue after the
implementation of the project.
The most satisfied PPs were the municipalities who implemented circular economy pilot projects
(Tallinn, Tartu). With their visits to donor state partners, they gained valuable information and saw
opportunities to implement similar activities in Estonia. Tallinn’s project visited Oslo in November 2022
and Tartu’s project visited Oslo in May 2023, all project partners were present. The circular usage
bank idea in Tartu’s project came from this study-visit.
Nordic countries’ experience was used in the preparation of the circular use points and center and the
goals for the promotion of the field. This is from the practices of the project's partner city Oslo as well
as Oslo's own cooperation partner. Experts from the project partners were also involved, who helped
to evaluate how to create the most sustainable and widely used circular use points. ¡ Involvement of
partners is effective if expectations are clear for all parties and cooperation agreements are specific.
Communication with the representatives of the city of Oslo has continued both in relation to project
activities and non-project topics. For example, Tallinn also plans to add reuse rooms in containers to
other existing waste stations. Oslo has provided input from its own mobile container specification to
procure the containers.
Pernova project also had a donor partner from Norway, they visited Kongsberg kommunale eiendom.
The PP and partners received valuable information about the construction of energy-efficient buildings
in Norway, the introduction of hydrogen production, and energy-efficient management of municipal
facilities. The donor partner also gained knowledge from Pernova - in Pärnu, the organization of more
integrated education in Pernova Loodusmaja, the new SMARTPARK classroom, the Gren combined
station, whose district heating and cooling system which is the backbone of the energy system (heat,
electricity and cooling, local renewable fuels and modern production equipment are produced) of the
city of Pärnu, attracted the attention of Norwegians.
Other climate change awareness rising project by University of Tartu was also a great example of
positive cooperation – their donor partner University of Bergen supported the latest developments in
climate science and helped bring complex information to the wider society.
10 Version 4.0 as of 17/04/2025 17:53:40 CEST
The cooperation with the Donor Programme Partner has been very good. DPP has helped to organize
the mid-term event and consulted throughout the implementation of Programme. Direct
communication has been abled in events and meetings.
Challenges and Lessons Learned
Covid pandemic influenced bilateral relations, but even with that challenge more than half of the
projects had a donor state partner who contributed to the implementation of the project. During next
implementing period, study trips or meet & greet events should be organized possibly before opening
the calls, to make it easier for PPs to get contacts from donor states.
Before starting the project activities, it is necessary to agree with the external partner what the project
implementer's expectations are and what the external partner will receive. It will also help to
encourage further cooperation if we think about what the longer-term goal is for the involvement of a
foreign partner and how the cooperation could continue after the end of the project.
Some projects have faced unforeseen challenges in their activities. In Call 1 “Ecosystem resilience
increased” both projects had some challenges with their bilateral activities. One of the projects
planned to use chemicals for the first time in Estonia to control freshwater invasive species – similar to
Norway. Their partner, the Norwegian Veterinary Institute consulted them in choosing the correct
method and chemicals for eradication, but there was an unexpected obstacle – the Estonian
Environmental Board didn’t give permission for conducting the chemical control in water bodies. So,
the analysis was done, but it was not possible to implement the activity in this manner. This obstacle
was hard to prevent as the concrete measures and chemicals were selected during the project so it
would have been difficult for the Estonian Environmental Board to give their opinion about chemical
eradication in advance. Project pivoted and used trapping and biocontrol instead.
Another Call 1 “Ecosystem resilience increased” project had a great cooperation with their Norwegian
partner, but the contact person decided to retire and as there wasn’t enough human resources, no one
took over the management of project and therefore no reports were submitted. The Norwegian
Institute of Marine Research therefore resigned from the project and claimed no costs.
This was also an unforeseen obstacle and when the institution signed the partnership agreement it
was impossible to foresee.
The most important overarching recommendations from evaluation report are:
▪ In the future, the program operator and the implementation unit could communicate more (in
advance) about the opening of rounds, so that applicants can prepare in time; encourage information
exchange and cooperation between projects in order to motivate participants and share experiences;
to offer substantive and personal advice to project implementers to ensure the quality of the results.
▪ Continue to support cooperation with an external partner to encourage the adoption of best practices.
At the same time, the process of applying and implementing projects should be structured in such a
way that the cooperation is bilateral and meaningful. In this way, the partner of the donor country
would be more interested in participating in the project, and there is a greater probability that the
cooperation will continue even after the end of the project.
▪ If possible, reduce the administrative burden associated with application and project reporting and
the detail of reporting, which increases the motivation of applicants and leaves more time to deal with
the content activities of the project
11 Version 4.0 as of 17/04/2025 17:53:40 CEST
IRREGULARITIES
Amount of
Reporting Case Estimated final input to the
Case Id Nature of irregularity Status Decision financial
level opened FMO for cases not closed
correction
EE- Project grant amount reduced.
Deviation from public 07/02/202
IR 183 CLIMATE- Closed - Amount linked to irregularity paid € 448.32
procurement rules/principles 3
0009 back/deducted from payment.
EE-
Deviation from public 09/12/202 Ongoin
IR 184 CLIMATE- 08.2024 - € 1,296.36
procurement rules/principles 2 g
0011
EE-
Deviation from public 27/09/202 Ongoin
IR 207 CLIMATE- 08.2024 - € 1,044.90
procurement rules/principles 2 g
0011
EE- Project grant amount reduced.
Deviation from public 14/11/202
IR 300 CLIMATE- Closed - Amount linked to irregularity paid € 39,450.00
procurement rules/principles 3
0023 back/deducted from payment.
EE-
Deviation from public 10/04/202 Ongoin
IR 326 CLIMATE- 05.2024 - € 3,060.72
procurement rules/principles 4 g
0019
EE-
Deviation from public 07/02/202 Ongoin
IR 327 CLIMATE- 08.2024 - € 1,746.72
procurement rules/principles 4 g
0011
12 Version 4.0 as of 17/04/2025 17:53:40 CEST
SUMMARY OF PROJECTS
Number of Number of Project grant Project grant
Project Eligible Project Eligible
projects projects contracted incurred
Expenditure contracted Expenditure incurred
(EEA Grant + national co- (EEA Grant + national co-
contracted completed financing) financing)
(Includes project co-financing) (Includes project co-financing)
Pre-
0 0 € 0.00 € 0.00 € 0.00 € 0.00
defined
Contracte
d through 2 2 € 799,245.14 € 748,266.67 € 880,313.75 € 880,313.73
open calls
Contracte
Outcome 1: Ecosystem resilience
d through
increased
small 0 0 € 0.00 € 0.00 € 0.00 € 0.00
grants
scheme
Total
Outcome 2 2 € 799,245.14 € 748,266.67 € 880,313.75 € 880,313.73
1
Pre-
0 0 € 0.00 € 0.00 € 0.00 € 0.00
defined
Contracte
d through 10 10 € 3,524,679.99 € 3,473,580.32 € 4,021,451.62 € 4,086,565.08
open calls
Outcome 2: Increased ability at the Contracte
local level to reduce emissions and d through
adapt to a changing climate small 10 10 € 400,000.00 € 341,031.02 € 401,687.60 € 391,663.25
grants
scheme
Total
Outcome 20 20 € 3,924,679.99 € 3,814,611.34 € 4,423,139.22 € 4,478,228.33
2
Pre-
1 1 € 900,000.00 € 783,843.36 € 922,169.07 € 922,168.66
defined
Contracte
Outcome 3: Framework for Circular d through 3 3 € 900,000.00 € 775,408.31 € 912,245.07 € 912,245.07
Economy strengthened open calls
Contracte
d through 0 0 € 0.00 € 0.00 € 0.00 € 0.00
small
13 Version 4.0 as of 17/04/2025 17:53:40 CEST
grants
scheme
Total
Outcome 4 4 € 1,800,000.00 € 1,559,251.67 € 1,834,414.14 € 1,834,413.73
3
Total programme costs
26 26 € 6,523,925.13 € 6,122,129.68 € 7,137,867.11 € 7,192,955.79
(Excluding programme management costs)
14 Version 4.0 as of 17/04/2025 17:53:40 CEST
FINAL BALANCE
Overview of programme expenditure
Programme EEA Grants Total grant Programme Total eligible
Programm EEA
Budget Heading Total grant eligible contribution contribution co-financing expenditure
e area (PA) Grants
expenditure incurred incurred incurred incurred
€ €
PA13 Programme management € 705,823.53 € 563,005.06 € 563,005.06 € 99,353.83 € 662,358.89
599,950.00 599,950.00
Outcome 1: Ecosystem resilience increased (EEA € €
PA11 € 800,000.00 € 636,026.67 € 636,026.67 € 112,240.00 € 748,266.67
Grants) 680,000.00 680,000.00
Outcome 2: Increased ability at the local level to reduce € €
€ €
PA13 emissions and adapt to a changing climate (EEA 3,242,419.6 3,242,419.6 € 3,242,419.64 € 572,191.70 € 3,814,611.34
3,814,611.34 3,242,419.64
Grants) 4 4
€ €
Outcome 3: Framework for Circular Economy € €
PA13 1,477,630.3 1,477,630.3 € 1,325,363.92 € 233,887.75 € 1,559,251.67
strengthened (EEA Grants) 1,738,388.66 1,325,363.92
6 6
€ €
€ € €
Total 6,000,000.0 6,000,000.0 € 5,766,815.29 € 6,784,488.57
7,058,823.53 5,766,815.29 1,017,673.28
0 0
Description of budget spending
Programme management
Promotional and information activities to share experiences, expenditures related to the strengthening of bilateral relations and to foster the changes driven by
climate education projects and share their results: 1) Environmental education conference was co-organized - incl. guest speker from Bergen University
Museum and two climate awareness projects introduced their materials in the the workshops of conference. Oct 2024 2) Higher climate courses to decision
makers by climate awareness project. Oct 2024 3) Introduction of climate projects and materials to environment education institutions under Ministry of
Climate. Aug 2024 4) Introduction of climate education project to officers in ministries of Climate and Education and Research onsite with workshops in Tartu
and Tallinn. Nov 2024 5) Pernova project sharing the best practice to environment education institutions for compiling a climate education teaching
programme - video and onsite training. Dec 2024. 6) Additional printing of Pernova climate education project's climate education books for teachers.
Implementing agencies expenditures were related to the approval and transfer of payments and transfer of payments to Project Promoters, also projects’
monitoring and onsite checks and Communication activities (articles, photographer service - best results were photographed). Expenditures were also related
to bilateral activities, such as visiting other beneficiary countries and exchanging experiences.
15 Version 4.0 as of 17/04/2025 17:53:40 CEST
Outcome 1: Ecosystem resilience increased (EEA Grants)
Projects’ expenditures in the second half of 2024 were related to donor partner expenditures, invasive species eradication costs that were on hold because of
irregularities, project management and expert’s costs, analysis of invasive species, writing reports, business trip costs, etc
Outcome 2: Increased ability at the local level to reduce emissions and adapt to a changing climate (EEA Grants)
Projects’ expenditures in the second half of 2024 were related to different construction works that were done before 30th of April, 2024, but the disbursement
claims were put on hold before the final report of the project was accepted. The works included final landscaping, planting, etc; communication costs,
workshops, sowing native seeds, also project’s final events (publicity) and project management costs.
Outcome 3: Framework for Circular Economy strengthened (EEA Grants)
Expenditures incurred were related to project management costs, project’s final events; studies; communication costs; equipment for re-use centres.
Calculation of the final balance
EEA Grants
Total reported eligible expenditure of the programme
Total eligible expenditure incurred € 6,784,488.57
(-) Total (national) programme co-financing incurred (15.00 % rate) € 1,017,673.28
(=) Total grant contribution incurred (85.00 % grant rate) € 5,766,815.29
Amounts to be deducted from the total grant contribution1
(-) Total advance and interim payments to the programme from the Donors € 5,772,167.36
(-) Any co-financing from sources other than the Donors/national2 € 0.00
(-) Total interest earned reported € 48,950.18
Final balance
1 Any funds reimbursed from Project Promoters to the Programme Operator, not paid to other projects or reimbursed to the FMO (ref. Article 9.4.1(b)(iv) of the Regulation should be
reported as negative adjustments in the Financial report for the last reporting period (Annex 1). In this case, such funds will be subtracted from the "Total eligible expenditure incurred" of
the programme.
2 For example, financing from EU structural funds or other EU sources, from the Swiss contribution, etc. This row includes only the financing incurred during the programme eligibility
period.
16 Version 4.0 as of 17/04/2025 17:53:40 CEST
(=) Final balance payable to the Programme Operator € 0.00
(=) Final balance payable to the Donors € 54,302.25
17 Version 4.0 as of 17/04/2025 17:53:40 CEST
ANNEXES
The Annexes are intended for internal use only and will not be published.
18 Version 4.0 as of 17/04/2025 17:53:40 CEST
Annex 1: Financial report for the last reporting period
Programme eligible
Programme eligible
expenditure after the
expenditure as per
flexibility measures have
Programme Agreement
been applied
Programme management € 705,823.53 € 705,823.53
Outcome 1: Ecosystem resilience
€ 800,000.00 € 800,000.00
increased (EEA Grants)
Outcome 2: Increased ability at the
local level to reduce emissions and
€ 3,753,000.00 € 3,814,611.34
adapt to a changing climate (EEA
Grants)
Outcome 3: Framework for Circular
Economy strengthened (EEA € 1,800,000.00 € 1,738,388.66
Grants)
Total € 7,058,823.53 € 7,058,823.53
Part A - Statement of actual expenditure incurred and interest earned
Incurred expenditure - summary
Start date of incurred expenditure period 01/07/2024
End date of incurred expenditure period 30/04/2025
Previously
Incurred this Available
incurred Total to date Total Budget
period balance
expenditure
Eligible
€ 5,977,625.03 € 806,863.54 € 6,784,488.57 € 7,058,823.53 € 274,334.96
expenditure
EEA Grants € 5,080,981.27 € 685,834.02 € 5,766,815.29 € 6,000,000.00 € 233,184.71
Co-financing € 896,643.76 € 121,029.52 € 1,017,673.28 € 1,058,823.53 € 41,150.25
Incurred expenditure - details
Title: Programme management
Previously
Incurred this Available
incurred Total to date Budget
period balance
expenditure
Eligible
€ 438,190.13 € 224,168.76 € 662,358.89 € 705,823.53 € 43,464.64
expenditure
Brief description of actual expenditure incurred
Several EE-CLIMATE programme results and awareness rising activities were done on this period.
Implementing agencies expenditures were related to the approval and transfer of payments and transfer of
payments to Project Promoters, also projects’ monitoring and onsite checks and Communication activities
(articles, photographer service - best results were photographed). Expenditures were also related to bilateral
activities, such as visiting other beneficiary countries and exchanging experiences.
Eligible expenditures
Eligible expenditure - EUR
€ 224,168.76
Total
€ 224,168.76
Title: Outcome 1: Ecosystem resilience increased (EEA Grants)
19 Version 4.0 as of 17/04/2025 17:53:40 CEST
Previously
Incurred this Available
incurred Total to date Budget
period balance
expenditure
Eligible
€ 610,701.04 € 137,565.63 € 748,266.67 € 800,000.00 € 51,733.33
expenditure
Brief description of actual expenditure incurred for the outcome
Projects are closed. Projects’ expenditures in the second half of 2024 were related to donor partner
expenditures, invasive species eradication costs that were on hold because of irregularities, project
management and expert’s costs, analysis of invasive species, writing reports, business trip costs, etc
Eligible expenditures
Eligible
Project expenditure -
EUR
EE-CLIMATE-0011 € 57,559.69
EE-CLIMATE-0012 € 80,005.94
Total
€ 137,565.63
Title: Outcome 2: Increased ability at the local level to reduce emissions and adapt to a changing
climate (EEA Grants)
Previously
Incurred this Available
incurred Total to date Budget
period balance
expenditure
Eligible
€ 3,553,270.28 € 261,341.06 € 3,814,611.34 € 3,814,611.34 € 0.00
expenditure
Brief description of actual expenditure incurred for the outcome
Projects are closed. Projects’ expenditures in the second half of 2024 were related to different construction
works that were done before 30th of April, 2024, but the disbursement claims were put on hold before the
final report of the project was accepted. The works included final landscaping, planting, etc; communication
costs, workshops, sowing native seeds, also project’s final events (publicity) and project management costs.
Eligible expenditures
Eligible
Project expenditure -
EUR
EE-CLIMATE-0016 € 119,125.56
EE-CLIMATE-0026 € 30,002.11
EE-CLIMATE-0025 € 48,554.95
EE-CLIMATE-0019 € 63,658.44
Total
€ 261,341.06
Title: Outcome 3: Framework for Circular Economy strengthened (EEA Grants)
Previously
Incurred this Available
incurred Total to date Budget
period balance
expenditure
Eligible
€ 1,375,463.58 € 183,788.09 € 1,559,251.67 € 1,738,388.66 € 179,136.99
expenditure
Brief description of actual expenditure incurred for the outcome
Projects are ended. Expenditures incurred were related to project management costs, project’s final events;
studies; communication costs; equipment for re-use centres.
Eligible expenditures
Eligible
Project expenditure -
EUR
20 Version 4.0 as of 17/04/2025 17:53:40 CEST
EE-CLIMATE-0014 € 91,342.37
EE-CLIMATE-0015 € 24,073.72
EE-CLIMATE-0017 € 68,372.00
Total
€ 183,788.09
Interest Earned
Interest generated on accounts established by the Programme Operator for funds intended for
regranting for 2024
EEA Grants Total
€ 0.00 € 0.00
Interest generated on accounts established by the Programme Operator for funds intended for
regranting for 2025 (from 1 January until the submission of the Final Programme Report or until
an earlier date if reporting until the Final Programme Report date is not possible)3
The date until which the interest is reported for 2025: 31/01/2025
EEA Grants Total
€ 0.00 € 0.00
Cumulative Interest generated on accounts established by the Programme Operator for funds
intended for regranting
EEA Grants Total
€ 48,950.18 € 48,950.18
Comments
No interest was earned.
3 In line with Article 9.4.5 of the Regulations, any interest earned on the bank account of the Programme Operator
between the date of the Final Programme Report and the reimbursement date (i.e. final balance payment either to the
Donors or to the Beneficiary State) will also be included in the reimbursement. The FMO will contact the Certifying
Authority before making the payment or issuing a debit note to request information on the remaining amount of the
accumulated interest.
21 Version 4.0 as of 17/04/2025 17:53:40 CEST
Programme Operator
Full legal name: Ministry of Climate - Estonia (EE)
Programme Operator signature
I certify that I am duly authorised to sign this financial report for the last reporting period and the final
balance of the programme. I have thoroughly reviewed the actual expenditure incurred declared in Part
A and the calculation of the final balance of the programme, and confirm that the information provided
is accurate. I confirm that this programme is carried out as described in the Programme Agreement and
that the incurred expenditure is correctly represented.
Overall implementation status (including milestones):
Projects were finished on the first half of 2024. Programme management were used for awareness
activities that supported and maintained the programme and its projects' aims.
Question Answer Comment
The setup of management and control system
Management and control systems of
for the programme started in 2019. The
the Programme Operator set up fulfilling
compliance audit of the management and
the general principles set out in the Yes
control system of the EE-Climate programme
Regulation and approved by the
has started in April 2020 and finished 13 July
National Focal Point (Art 5.7)
2020.
Separate interest-bearing bank
accounts dedicated to the funds
Yes Responsibility of CA.
intended for regranting established and
maintained (Art 5.6.1 (m))
EE-CLIMATE Programme webpage is
operated by the webpage of Ministry of the
Information and publicity obligations
Yes Climate. Information about the open calls can
fulfilled (Art 3.3)
be found on the webpage of Implementing
Agency.
Monitoring and verifications conducted Monitoring has been carried out with every
to ensure quality and/or regularity of payment claim for every project and on-site
Yes
implementation (Art 5.6.1 (g) and Art monitoring visits (check-ups) have been done
5.6.2) for 13 projects.
All projects have reported their final project
Annual monitoring of a sample of
Yes reports and these were checked by
projects conducted (Art 5.6.1 (i))
Impementing Agency.
Project-specific statistical data is
Both E-toetus and Grace have been updated
entered and up to date in the reporting Yes
with the latest information.
database (Art 5.6.1 (s))
Special conditions and Programme-
There are no programme-specific rules set out
specific rules set out in the programme N/A
in the programme agreement.
agreement fulfilled (Art 5.6.1 (x))
22 Version 4.0 as of 17/04/2025 17:53:40 CEST
All irregularities, their investigation and
any remedies taken reported (Art 5.6.1 Yes All occurred irregularities are reported
(v))
For the Programme Operator
Signed in ................................. on ................
......................................................................
23 Version 4.0 as of 17/04/2025 17:53:40 CEST
Certification of actual expenditure incurred and co-financing
Start date of incurred expenditure period 01/07/2024
End date of incurred expenditure period 30/04/2025
Actual expenditure incurred this period € 806,863.54
Co-financing committed to date € 1,017,673.28
Co-financing for incurred expenditure paid € 1,017,673.28
Interest earned 2024 € 0.00
Interest earned 2025 € 0.00
In relation to the Financial report for the last reporting period and the calculation of the final balance of
the programme, the Certifying Authority hereby certifies that:
(i) the summary of eligible expenditure submitted by the Programme Operator is in full conformity with
the supporting documents;
(ii) the supporting documents have been examined and found to be authentic, correct and accurate;
(iii) the summary of eligible expenditure is based on verifiable accounting which complies with generally
accepted accounting principles and methods;
(iv) the summary of eligible expenditure falls within eligible expenditure under the Regulation for the
implementation of the EEA / Norwegian Financial Mechanisms 2014-2021;
(v) the summary of expenditure is incurred as part of the implementation of the Programme in
accordance with the Programme Agreement;
(vi) sufficient audit trail exists;
(vii) co-financing committed to date has been made available;
(viii) co-financing in relation to incurred expenditure has been paid;
(ix) when relevant, that the interest earned at Programme Operator account is correct.
For the Certifying Authority
Signed in ................................. on ................
......................................................................
24 Version 4.0 as of 17/04/2025 17:53:40 CEST
Annex 2: Communications
Best projects
Confirm the PLI
Project
Project title Project promoter is updated in
code
GrACE
EE-
Creation of pilot areas for nature-based solutions to increase Tori Municipality
CLIMATE Yes
biodiversity in Tori Municipality (EE)
-0021
EE- Strategic Centre of
The transition of civic amenity sites into reuse and repair centres CLIMATE Tallinn (Tallinn City Yes
-0014 EE)
Creating a Pernova Climate Education demonstration area EE- Pernova
"Smart Park" /Pernova kliimahariduse näidisala "" SMART CLIMATE Educational Centre Yes
PARK" loomine -0025 (EE)
EE-
Close-to-nature solutions at Keila Song Festival Grounds / Keila City
CLIMATE Yes
Looduslähedased lahendused Keila lauluväljakul Government (EE)
-0022
EE- Estonian University
Eradication of aquatic invasive species in Estonian freshwaters /
CLIMATE of Life Sciences Yes
Invasiivsete võõrliikide tõrje Eesti magevetes
-0011 (EE)
Communication activities
To foster the changes driven by climate education projects and share their results, several
communication activities were organized by the Ministry:
1) Environmental education conference was co-organized - incl. guest speker from Bergen University
Museum and two climate awareness projects introduced their materials in the the workshops of
conference. Oct 2024
2) Higher climate courses to decision makers by climate awareness project. Oct 2024
3) Introduction of climate projects and materials to environment education institutions under Ministry of
Climate. Aug 2024
4) Introduction of climate education project to officers in ministries of Climate and Education and
Research onsite with workshops in Tartu and Tallinn. Nov 2024
5) Pernova project sharing the best practice to environment education institutions for compiling a
climate education teaching programme - video and onsite training. Dec 2024.
6) Additional printing of Pernova climate education project's climate education books for teachers.
Alltogether 4 television shows presented 6 EEA grants projects.
Proffessional photos were made from all physical infrastructure projects.
5 new articles about project results in online media on 2024.
18 social media coverage in 2024 (FB and Instagram).
2 #OurStories videoclips were published on Programme website and FB-page
25 Version 4.0 as of 17/04/2025 17:53:40 CEST
European Economic Area (EEA) Grants 2014-2021 | Ministry of Climate
Project stories
2
Media coverage
Television show - Summer TV “Elamusi täis Eesti” (Estonia full of emotions) has presented 3 of our
Call II projects:
Close-to-nature solutions at Keila Song Festival Grounds
Restoration and renovation of the green infrastructure alleys of the town of Põltsamaa to
alleviate the urban heat island (video streaming from 8:20)
Creating a Pernova Climate Education demonstration area "Smart Park"
Television show "Jälg" (environmental television show) has presented 2 of our Call I projects and 1 of
our Call II projects:
Eradication of aquatic invasive species in Estonian freshwaters
Impacts of invasive alien species and climate change on marine ecosystems in Estonia
Close-to-nature solutions at Keila Song Festival Grounds
Published articles about some of the best examples of implemented projects for a wider public with
simple wording so that everybody could understand the benefit of the actions taken with these
projects:
1. All press-releases and articles are published on EIC website www.kik.ee:
1. January 10th, 2022 – an advertisement by EIC in the newspaper Eesti Päevaleht about the
opening of the Call III “Raising awareness on climate change”.
1. January 10th, 2022 – a press release by EIC about the opening of the Call III – “Universities
and research institutions have an opportunity to raise awareness on climate change among
children”.
1. April 18th, 2022 – an article by EIC in the newspaper Postimees “Why is it important to
preserve biological biodiversity in the city?”.
1. April 18th, 2022 - a press release by EIC about the opening of the Call II – “EIC supports local
municipalities to cope with Climate change”.
1. June 16th, 2022 - a press release by EIC about the results of the Call III – “University of Tartu
will raise awareness on climate change”.
1. October 19th, 2022 - a press release by EIC about the results of the Call IV “Circular Economy
pilot projects” – “An example for everybody! Local municipalities are heading towards circular
economy with bold solutions”.
1. November 7th, 2022 - a press release by EIC about the results of the Call II – “Green roofs,
community gardens and harvesting rainwater – seven local municipalities are going to mitigate
climate change”.
26 Version 4.0 as of 17/04/2025 17:53:40 CEST
1. 3 articles in papers (Postimees, 30.05.2023):
1. https://roheline.postimees.ee/7782153/poltsamaa-linn-leevendab-rohelusega-linnasudame-
kuumasaari (The city of Põltsamaa alleviates heat island effects with greenery)
1. https://roheline.postimees.ee/7782150/pelgu-uhisaiaga-luuakse-linnaelanikele-roheline-
linnaruum (A green urban space is created for the citizens with the Pelgu allotment garden)
1. https://roheline.postimees.ee/7782129/tori-valla-elurikkuse-suurendamine-on-kogukonna-
kokkukasvamise-lugu (Increasing biodiversity in Tori municipal is a story of growing together
as a community)
1. 3 Articles in papers (Postimees, 5.06.2023):
“Keila lauluväljak saab looduslähedase kuue nii välimuselt kui ka olemuselt” (Keila song-
festival ground shall have a nature-based outfit both in appearance and in nature);
“Kohtla-Järve suurendab linnaruumis elurikkust” (Kohtla-Järve is increasing biodiversity in
urban areas);
“Pärnusse tuleb Eesti esimene kliimahariduse näidisala ja taastuvenergial toimiv
õuesõppeklass” (The first model area for climate education and renewable energy outdoor
study-class in Estonia will be created in Pärnu).
1. 5 articles in Delfi online media, November 2024:
1. Renewed Keila songfestival grounds with nature-based solutions is well adapted:
Looduslähedaste lahendustega uuenenud Keila lauluväljak on hästi omaks võetud - Delfi
1. Pernova SmartPark teaches everything concerning climate change: Pernova SmartPark
õpetab kõike kliimamuutustega seonduvat - Delfi
1. Circular economy centres are inviting to restore repair and reuse with the help of a master:
Ringmajanduskeskused kutsuvad meistrite käe all parandama, restaureerima ja
korduskasutama - Delfi
1. Tori municipality is looking for solutions for climate change together with the community: Tori
valla elurikkuse projekt otsib koos kogukonnaga lahendusi kliimamuutuste mõjudele - Delfi
1. The city of Põltsamaa is continuing the restoration of alleys and renewal of green
infrastructure: Põltsamaa linn jätkab alleede taastamist ja rohetaristu uuendamist - Delfi
Social media coverage 2024:
Instagram
14.03.2024: 10% of waste in Estonia comes from the Construction sector:
https://www.instagram.com/p/C4fyUK_tjS9/?fbclid=IwY2xjawHHtXxleHRuA2FlbQIxMAABHQft
5pbY9xnUo02KS-PvUwiuHkx7FxRpMhNdcNYczSojSmsxhHHKt76LEg_aem_TC-
Cqbq0GLxjJCWArW7s6A (Reach 261)
24.05.2024 the new Singing festival ground in Keila is ready:
https://www.instagram.com/p/C7WWP7wNudd/?fbclid=IwY2xjawHHr_xleHRuA2FlbQIxMAAB
HS96Xk37Or8T08a0aLgctKJOBvJzpzmwYmQny9B9ZtfUl8ZRTAoVRGVz_w_aem_afrnvJa-
8lidrW36N8XX6w (Reach 286)
27 Version 4.0 as of 17/04/2025 17:53:40 CEST
Facebook
1.04.2024 Circular Economy in everyday life means practical things:
https://www.facebook.com/KeskkonnainvesteeringuteKeskus/posts/pfbid0BTheDUZuUG6YkH
KAFmV1vkJitUom9nNekCq6hMWssVF2aY9NTnYaaHGXVp6fW6JGl (Reach 476)
8.04.2024 Restored windows are beautiful and last for a long time:
https://www.facebook.com/KeskkonnainvesteeringuteKeskus/posts/pfbid02eqiz7FGbTnQnqD
vGyy51skcQm7DYL7Y1NBcC6cRVeZC5vUypcsFJBQKCYPVczcacl (Reach – 504)
15.05.2024 EEA grants implemented projects:
https://www.facebook.com/KeskkonnainvesteeringuteKeskus/posts/pfbid02FJVJETgt5MzEnn
Do7rhU29EFVSw4co7shHcCjJbGSEgMQrLFqb35VSx1TvXhsK57l (Reach 932)
15.05.2024 EEA grants implemented projects:
https://www.facebook.com/reel/738021881744471 (Reach 247)
22.05.2024 the new Singing festival ground in Keila is ready:
https://www.facebook.com/KeskkonnainvesteeringuteKeskus/posts/pfbid0hsE4JvPUwrxY5KW
ixTpYJCkYbWFzNpWzz7xVB2jb1bdE71PNpmAnqp5zBhSW9W1nl (Reach 1155)
14.06.2024 We went to visit the outdoor learning class in Pernova Nature
house: https://www.facebook.com/KeskkonnainvesteeringuteKeskus/posts/pfbid02w7jfdsZNT
4Jjgq2w5rg9LSdow18aBDCWmRA2G6TLzgCRxgQSpqDeDSwE1niJGAJQl (Reach – 800)
16.10.2024 Public announcement for getting new ideas for EEA grants new period:
https://www.facebook.com/KeskkonnainvesteeringuteKeskus/posts/pfbid0b13cbzdC7Dot6u7h
GHCMiRB2ZEk4t1cnKXP2u7FihapLh9hmuLJE9EGTeEAn1gkQl (Reach 397)
23.10.2024 The Circular Usage Centre in Lilleküla:
https://www.facebook.com/KeskkonnainvesteeringuteKeskus/posts/pfbid02GyUtryGtNu2zxak
4jUR8gVzDeX8m6njeionhEnHdYHjeQpd8bfscuUAa2bFzSAvl (Reach 1578)
24.10.2024 The bicycle pavilions in Tartu (Wooden architecture competition):
https://www.facebook.com/KeskkonnainvesteeringuteKeskus/posts/pfbid0268k9MftDqvFfSoH
wARKsswJwJRxpg6zvnxMfTspEMxz3MrhZkym5H5cJvJmGveMol (Reach 587)
8.11.2024 The bicycle pavilions in Tartu (Wooden architecture competition):
https://www.facebook.com/KeskkonnainvesteeringuteKeskus/posts/pfbid0pJizwHDoouAHLz5
A8X4UbmuStwqSrcUCeGhVN6Cjia1vU4PkjeDGZVKCkjJMoJWVl (Reach 440)
7.11.2024 Introduction of TV Show - Keila Signing festival ground nature based
solutions and ecosystem resilience
projects https://www.facebook.com/kliimaministeerium/posts/pfbid09ECrcvkYKWVtG4
mUbN8i8m9bujw9P3ruKYNV5AH1tLPzpskA9fJAMCvaZGyEKcnSl (Reach 527)
6.09.2024 Invitation to Pelguaia
opening https://www.facebook.com/kliimaministeerium/posts/pfbid0316CPCYzH3H2Y
S5BxoeHDyqPbXCCLwiZR5bcnzQF67jNkMr7XBXXDcyuXuCMX6JeQl (Reach 1049)
7.05.2024 Live! Participating link to Climate seminar to Local Governments
https://www.facebook.com/kliimaministeerium/posts/pfbid03sijsWQB87PDkX4L5Wdncwh4rtLj
BTiBeKFEeikZ4rswmxzdVhma6ERbgNYo1Sd7l (Reach 1995)
28 Version 4.0 as of 17/04/2025 17:53:40 CEST
7.05.2024 FB event Climate seminar to Local
Governments https://www.facebook.com/events/426036930159610 (Reach not
available)
31.01.2025 #Ourstories videoclip about Keila singing festival grounds restoration with nature-
based solutions
https://www.facebook.com/kliimaministeerium/posts/pfbid02d99F7XCMzHoA5YwtGDYYGMP
ApuoBF7PnFJWjp5BAekSr1sYDLAuWHS2iKKPAT83zl (Reach 2360)
30.01.2025 #Ourstories videoclip about work with indigenous species
https://www.facebook.com/kliimaministeerium/posts/pfbid02AmDby7UWctuzPwgbhxfH9vj2vW
287UDVv7R2Zuomj56ybCLJwXoWRfaTMYfh5WJAl (Reach 1382)
Website and social media
Total number of page views in the reporting
Link to programme website
year 2024
https://kliimaministeerium.ee/en/mini... 670
Number of posts published in the Number of
Platform Specific link or handle for the account
reporting year 2024 followers
Facebook https://www.facebook.com/kliimaministeerium 8 11000
Visuals
All the EE-CLIMATE photos and videos can be found on EEA
Library https://eealibrary.org/menu/100-2014-
2021?Country=109&page=1&Programmes=Climate%20Change%20Mitigation%20and%20A
daptation
EE0025 – Creating a Pernova Climate Education demonstration area "Smart Park" - All assets - EEA
& Norway Grants media library
EE0019- Restoration and renovation of the green infrastructure alleys of the town of Põltsamaa to
alleviate the urban heat island – All assets - EEA & Norway Grants media library
EE0021 - Creation of pilot areas for nature-based solutions to increase biodiversity in Tori Municipality
- All assets - EEA & Norway Grants media library and All assets - EEA & Norway Grants media library
and All assets - EEA & Norway Grants media library
EE0024 - The Pelgu allotment garden construction and follow-up activities in urban gardening - All
assets - EEA & Norway Grants media library
EE0014 - The transition of civic amenity sites into reuse and repair centres - All assets - EEA &
Norway Grants media library
EE0022 - Close-to-nature solutions at Keila Song Festival Grounds - All assets - EEA & Norway
Grants media library
EE0026 - Climate change mitigation and adaptation activities in Viljandi town - All assets - EEA &
Norway Grants media library
EE0017 - CIRCULAR RENOVATION IN TARTU - All assets - EEA & Norway Grants media library
29 Version 4.0 as of 17/04/2025 17:53:40 CEST
Annex 3: Evaluation report
Date of
Title Website link to the evaluation Upload a copy of the report
report
EE-CLIMATE programme
EE-CLIMATE 30/10/2024 https://kliimaministeerium.ee/en/mini...
evaluation Executive summary.pdf
30 Version 4.0 as of 17/04/2025 17:53:40 CEST
Annex 4: Final results
Objective: Climate change mitigated and vulnerability to climate change reduced € 7,058,823.53 € 6,784,488.57
Outcome 1: Ecosystem resilience increased
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
Number of regions with pressure on Cumulative
20 0 (APR 2023) - - 0 0 -
indigenous species number
Number of marine regions with
Cumulative
climate regulation services 0 1 (APR 2023) - - 3 3 -
number
improved
Output 1.1: Invasive alien species impact and pathways analysed
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
Target value changed –
Number of invasive alien species Cumulative University of Tartu (UT)
0 37 (IFR 2024) - - 37 10
whose pathways are analysed number 27, Estonian University of
Life Sciences (EULS) 10
Number of invasive species Cumulative Achievement from marine
0 14 (IFR 2024) - - 14 8
analysed for impact number ecosystem (UT)
Output 1.2: Measures to reduce invasive species implemented
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
Number of localities where alien Cumulative
0 20 (IFR 2024) - - 20 20 -
species have been targeted number
Elodea nutatalli was not
Number of invasive species Cumulative
0 3 (IFR 2024) - - 3 4 confirmed present in EST,
combated number
therefore not combated
31 Version 4.0 as of 17/04/2025 17:53:40 CEST
Cumulative
Number of professional staff trained 0 40 (IFR 2024) - - 40 30 EULS 30, UT 10
number
Gender
Female - - 0 - - 0 - -
Male - - 0 - - 0 - -
Not specified - - 40 - - 40 - -
Output 1.3: Restoration of carbon-sequestering marine habitats piloted
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
Number of habitats that sequester Cumulative
0 1 (IFR 2024) - - 1 1 -
and store blue carbon restored number
Outcome 2: Increased ability at the local level to reduce emissions and adapt to a changing climate
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
2% more from Estonian
population (from 81% to
83% in 2 years) consider
Number of people self-reporting
Cumulative them-selves as more
increased awareness on climate 0 0 (APR 2022) - - 20,500 10,000
number aware on climate adaption
adaptation and mitigation
and mitigation. The survey
was made amongst people
from 15-74 years.
Number of municipalities supported
6 county level and 4
to come into compliance with Cumulative
0 34 (IFR 2024) - - 34 6 municipality level plans =
national or EU mitigation/adaptation number
34 municipalities
strategies
Output 2.1: Local level climate change mitigation and adaptation plans developed
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
32 Version 4.0 as of 17/04/2025 17:53:40 CEST
Instead of the initially
Number of local level energy and
Cumulative planned 6 projects the
climate change mitigation and 0 10 (IFR 2024) - - 10 6
number budget allowed to finance
adaptation plans developed
10 smaller projects.
Output 2.2: Mitigation and adaptation measures implemented
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
Number of climate change
Cumulative 6 county level and 4
mitigation and adaptation measures 0 21 (IFR 2024) - - 21 6
number municipality level plans
implemented
Output 2.3: Increased public awareness on climate change
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
All project's activities
reached at least 303903
Number of people reached by Cumulative 303,903 (IFR people. Target was
0 - - 303,903 10,000
general awareness-raising activities number 2024) exceeded multiple times
with large information
campaignes.
Number of schools taking part in 143 Schools took part in
climate change education Cumulative the education programmes
0 94 (IFR 2024) - - 143 30
programmes supported by the number (143 out of total 501
programme. schools in EST)
Outcome 3: Framework for Circular Economy strengthened
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
Estonian Government is in
Yes (IFR
compliance with the EU strategy for Binary No - - Yes Yes -
2024)
Circular Economy
33 Version 4.0 as of 17/04/2025 17:53:40 CEST
Output 3.1: Enhanced capacity on Circular Economy
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
Strategy on Circular Economy Yes (IFR
Binary No - - Yes Yes -
completed 2024)
Pre-defined project carried
Number of professionals trained on Cumulative 100 (IFR out 5 trainings in different
0 - - 100 100
Circular Economy number 2024) regions, where 100
professionals were trained
Gender
Female - - 0 - - 0 - -
Male - - 0 - - 0 - -
Not specified - - 100 - - 100 - -
5 categories were
Number of categories for Green Cumulative developed before the
0 5 (IFR 2024) - - 5 10
Public Procurement developed number project implementation and
5 with the project
The media campaign
included TV, radio, social
media, outdoor
Number of people reached by Cumulative 200,000 (IFR
0 - - 200,000 10,000 advertising, screens in
awareness raising campaigns number 2024)
public transportation and it
reached at least 200 000
different people.
36 schools registered, 20
Number of schools participating in Cumulative
0 36 (IFR 2024) - - 36 30 submitted their video for
Green Schools Competition number
the competition
Output 3.2: Measures for Circular Economy implemented
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
34 Version 4.0 as of 17/04/2025 17:53:40 CEST
The budget was limited
Number of circular economy pilot Cumulative and only 3 projects were
0 2 (IFR 2024) - - 3 4
measures implemented number granted and all 3 of them
were implemented.
Bilateral Outcome: Enhanced collaboration between beneficiary and donor state entities involved in the programme
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
6.63, 4.50,
Based Target is
on the ≥4.5,
Level of trust between cooperating
survey 6.94 (APR and an
entities in beneficiary states and Scale 1-7 - - 6.32 -
carried 2023) increase
donor states
out on on the
behalf of baseline
the FMO value
6.61, 4.50,
Based Target is
on the ≥4.5,
Level of satisfaction with the survey 6.75 (APR and an
Scale 1-7 - - 5.94 -
partnerships carried 2023) increase
out on on the
behalf of baseline
the FMO value
Share of cooperating organisations The bilateral partnerships
75.00 %
that apply the knowledge acquired Percentage N/A 4 5 80.00 % 50.00 % were evaluated very
(APR 2023)
from bilateral partnerships effective.
Bilateral Output 1: Cooperation between beneficiary and donor state entities supported
Achievements until end of the Briefly comment on
Unit of Previous
Baselin programme Target significant differences
Indicator measureme achievement
e value Numerato Denominato Achieveme value between achievement
nt value
r r nt value values and target values
Number of training courses
Cumulative Projects had all together
organised by donor state and 0 26 (IFR 2024) - - 26 10
number 26 training courses,
beneficiary state entities
35 Version 4.0 as of 17/04/2025 17:53:40 CEST
including PO organized
trainings
Number of projects involving
Cumulative All together 14 projects
cooperation with a donor state 0 14 (IFR 2024) - - 14 5
number had donor state partners
partner
36 Version 4.0 as of 17/04/2025 17:53:40 CEST
Annex 5: Contracted projects
Number Project grant Project grant
contracted incurred Project
Project Implementatio Outcom of donor
Project title Project Promoter (EEA Grant + (EEA Grant + contract
code n modality e project
national co- national co- status
partners financing) financing)
EE- Eradication of aquatic invasive species in Estonian
Estonian University of Call / Small Outcome Complete
CLIMATE freshwaters / Invasiivsete võõrliikide tõrje Eesti 1 € 399,745.14 € 350,456.70
Life Sciences (EE) Grants Scheme 1 d
-0011 magevetes
EE- Impacts of invasive alien species and climate change on
Call / Small Outcome Complete
CLIMATE marine ecosystems in Estonia / Invasiivsete võõrliikide ja Tartu University (EE) 1 € 399,500.00 € 397,809.97
Grants Scheme 1 d
-0012 kliimamuutuste mõju Eesti mereökosüsteemidele
EE-
Close-to-nature solutions at Keila Song Festival Grounds / Keila City Government Call / Small Outcome Complete
CLIMATE 0 € 606,829.17 € 606,829.17
Looduslähedased lahendused Keila lauluväljakul (EE) Grants Scheme 2 d
-0022
EE-
Call / Small Outcome Complete
CLIMATE Climate change education to promote climate action Tartu University (EE) 1 € 499,800.00 € 497,061.64
Grants Scheme 2 d
-0016
EE- Restoration and renovation of the green infrastructure
Municipality of Call / Small Outcome Complete
CLIMATE alleys of the town of Põltsamaa to alleviate the urban heat 0 € 378,420.00 € 370,044.97
Põltsamaa (EE) Grants Scheme 2 d
-0019 island
Tallinn Urban
EE-
The Pelgu allotment garden construction and follow-up Environment and Call / Small Outcome Complete
CLIMATE 0 € 368,976.33 € 368,976.24
activities in urban gardening Public Works Grants Scheme 2 d
-0024
Department (EE)
EE- Creating a Pernova Climate Education demonstration
Pernova Educational Call / Small Outcome Complete
CLIMATE area "Smart Park" /Pernova kliimahariduse näidisala "" 1 € 351,172.49 € 351,172.49
Centre (EE) Grants Scheme 2 d
-0025 SMART PARK" loomine
EE-
Kohtla-Järve City Call / Small Outcome Complete
CLIMATE Climate change adaptation activities in Kohtla-Järve 0 € 306,297.50 € 266,311.74
Government (EE) Grants Scheme 2 d
-0023
Tallinn Urban
EE-
Environment and Call / Small Outcome Complete
CLIMATE Construction of Drinking Water Taps 0 € 299,464.56 € 299,464.56
Public Works Grants Scheme 2 d
-0020
Department (EE)
EE- Establishment of a rainwater recovery system in the
Märjamaa Municipality Call / Small Outcome Complete
CLIMATE Metsanurga area / Metsanurga piirkonna sademevee 0 € 298,379.75 € 298,379.32
(EE) Grants Scheme 2 d
-0018 taaskasutussüsteemi rajamine
37 Version 4.0 as of 17/04/2025 17:53:40 CEST
EE-
Creation of pilot areas for nature-based solutions to Call / Small Outcome Complete
CLIMATE Tori Municipality (EE) 0 € 215,339.44 € 215,339.44
increase biodiversity in Tori Municipality Grants Scheme 2 d
-0021
EE-
Climate change mitigation and adaptation activities in Viljandi city Call / Small Outcome Complete
CLIMATE 0 € 200,000.75 € 200,000.75
Viljandi town government (EE) Grants Scheme 2 d
-0026
EE- Narva City
Climate change mitigation and adaptation plan in Narva Call / Small Outcome Complete
CLIMATE Government City 1 € 50,000.00 € 48,903.94
City Grants Scheme 2 d
-0004 Economic Board (EE)
EE-
Rakvere Climate change mitigation and adaptation plan Rakvere City Call / Small Outcome Complete
CLIMATE 0 € 50,000.00 € 16,867.96
"Climate Neutral Rakvere 2035" Government (EE) Grants Scheme 2 d
-0009
EE- Tartumaa Association
Tartu County Climate change mitigation and adaptation Call / Small Outcome Complete
CLIMATE of Local Authorities 2 € 45,000.00 € 44,854.59
plan Grants Scheme 2 d
-0002 (EE)
EE- The Association of
Pärnumaa Local Municipalities' common Climate change Call / Small Outcome Complete
CLIMATE Local Authorities of 1 € 44,595.00 € 41,855.24
mitigation and adaptation plan Grants Scheme 2 d
-0003 Pärnu County (EE)
EE- Lääne-Viru
Lääne-Virumaa Climate change mitigation and adaptation Call / Small Outcome Complete
CLIMATE Association of Local 1 € 44,235.00 € 42,747.26
plan Grants Scheme 2 d
-0007 Authorities (EE)
EE-
Climate change mitigation and adaptation plan in Pärnu Pärnu City Call / Small Outcome Complete
CLIMATE 1 € 43,744.32 € 42,183.70
City 2030 Municipality (EE) Grants Scheme 2 d
-0005
EE- Võrumaa Association
Võru County Climate change mitigation and adaptation Call / Small Outcome Complete
CLIMATE of Local Authorities 1 € 39,951.00 € 31,469.31
plan Grants Scheme 2 d
-0008 (EE)
EE-
Jõgevamaa Climate change mitigation and adaptation Jõgeva Municipality Call / Small Outcome Complete
CLIMATE 0 € 36,450.08 € 36,071.79
plan (EE) Grants Scheme 2 d
-0010
EE- Association of Local
Läänemaa Local Municipalities' Climate change mitigation Call / Small Outcome Complete
CLIMATE Governments of 1 € 31,404.60 € 25,120.24
and adaptation plan Grants Scheme 2 d
-0006 Lääne County (EE)
EE-
Climate change mitigation and adaptation plan in Keila Keila City Government Call / Small Outcome Complete
CLIMATE 0 € 14,620.00 € 10,956.99
City (EE) Grants Scheme 2 d
-0001
EE-
Keskkonnaagentuur Pre-defined Outcome Complete
CLIMATE Enhanced capacity on Circular Economy 1 € 900,000.00 € 783,843.36
(EE) project 3 d
-0013
38 Version 4.0 as of 17/04/2025 17:53:40 CEST
EE- Strategic Centre of
The transition of civic amenity sites into reuse and repair Call / Small Outcome Complete
CLIMATE Tallinn (Tallinn City 1 € 357,942.53 € 246,460.26
centres Grants Scheme 3 d
-0014 EE)
EE-
Tartu city government Call / Small Outcome Complete
CLIMATE CIRCULAR RENOVATION IN TARTU 1 € 336,684.15 € 328,481.02
(EE) Grants Scheme 3 d
-0017
EE-
Rae Rural Municipality Call / Small Outcome Complete
CLIMATE Circular Economy project in Rae Municipality 0 € 205,373.32 € 200,467.03
Government (Rae EE) Grants Scheme 3 d
-0015
39 Version 4.0 as of 17/04/2025 17:53:40 CEST
Annex 6: Partially completed projects
For partially completed pre-defined projects or other projects receiving a grant equal to or greater than EUR 2,000,000 (including national co-financing but
excluding project co-financing)
No entries found.
For partially completed non-predefined projects receiving a grant of less than EUR 2,000,000 (including national co-financing but excluding project co-
financing)
No entries found.
40 Version 4.0 as of 17/04/2025 17:53:40 CEST
Annex 7: Conditions and special concerns
Marked
as Date of
Description Tracking fulfilled fulfilmen Briefly describe the measures taken
in t
GrACE
1. The National Focal Point shall ensure that the Programme Operator ensures that
project promoters:
o Keep any buildings purchased, constructed, renovated or reconstructed
under the project in their ownership for a period of at least 5 years
following the completion of the project and continue to use such buildings
for the benefit of the overall objectives of the project for the same period;
Project sustainability checks, or follow-up checks, are
o Keep any buildings purchased, constructed, renovated or reconstructed carried out within three to five years after the approval
under the project properly insured against losses such as fire, theft and Continuousl
N/A - of the final project report to ensure that the support is
other normally insurable incidents both during project implementation and y tracking
used as intended, assets are preserved, and the
for at least 5 years following the completion of the project; and project objectives are achieved.
o Set aside appropriate resources for the maintenance of any buildings
purchased, constructed, renovated or reconstructed under the project for
at least 5 years following the completion of the project. The specific
means for implementation of this obligation shall be specified in the
project contract.