Maret Ots
Saatja: Maret Ots
Saatmisaeg: esmaspäev, 8. juuni 2020 11:23
Adressaat: 'Komppa, Jarmo'
Koopia: 'Margus Sirel'; Meelis Kärt; Taavi Lentso; Erko Kulu
Teema: RE: PLC G3-500
Dear Jarmo and Margus,
Thank you for the hard work and the Declaration of Conformity for DC450, we accept it.
The equipment can be used for testing purposes in the beginning only.
The information about test sites and results of the tests should be sent to Consumer Protection and Technical Regulatory
Authority.
We appreciate the good collaboration with you.
Best regards
Maret
Maret Ots
Chief Specialist of Frequency Management Division
+372 667 2092|
[email protected] | www.ttja.ee
Consumer Protection and Technical Regulatory Authority
Endla 10a, 10142 Tallinn, Estonia
From: Komppa, Jarmo [mailto:
[email protected]]
Sent: Friday, June 5, 2020 9:12 AM
To: Maret Ots <
[email protected]>
Cc: 'Margus Sirel' <
[email protected]>; Meelis Kärt <
[email protected]>; Taavi Lentso
<
[email protected]>; Erko Kulu <
[email protected]>
Subject: RE: PLC G3-500
Dear Maret,
I hope you are doing fine.
Please find attached updated version for Declaration of Conformity for DC450,
“D000062806c_Certificat_CE_DC450v2G3_402883863_949”.
This took on our side once again unacceptable long time.
1
Looking forward for your feedback.
Best regards,
Jarmo
From: Komppa, Jarmo
Sent: keskiviikko 11. maaliskuuta 2020 15.39
To: Maret Ots <
[email protected]>
Cc: Margus Sirel <
[email protected]>; Meelis Kärt <
[email protected]>; Taavi Lentso
<
[email protected]>; Erko Kulu <
[email protected]>
Subject: RE: PLC G3-500
Dear Maret,
I have been in contact to our PM. I don’t know what went wrong in our clarification; it has been clear for us that also
150-500 kHz PLC band will be used.
Thank you for your feedback, apologize our mistake – I will come back to you.
Best regards,
Jarmo
______________________________________________________________________________________________________
Jarmo Komppa | Landis+Gyr Oy | Sales Manager
Phone: +358 40 715 9689 |Switchboard: +358 14 660 100
Email:
[email protected] | Site: www.landisgyr.com/europe | Address: Salvesenintie 6, 40420 Jyskä, Finland
manage energy better
From: Maret Ots <
[email protected]>
Sent: keskiviikko 11. maaliskuuta 2020 13.28
To: Komppa, Jarmo <
[email protected]>
Cc: Margus Sirel <
[email protected]>; Meelis Kärt <
[email protected]>; Taavi Lentso
<
[email protected]>; Erko Kulu <
[email protected]>
Subject: RE: PLC G3-500
Dear Jarmo,
Unfortunately the updated Declaration of Conformity for DC450 is correct only for data concentrators which are
using frequency range 3 kHz to 148,5 kHz.
We are looking for Declaration of Conformity for data concentrator which is using the 150-500 kHz PLC band.
Please have a look to our e-mail conversation below.
Best regards,
2
Maret Ots
Chief Specialist of Frequency Management Division
+372 667 2092|
[email protected] | www.ttja.ee
Consumer Protection and Technical Regulatory Authority
Endla 10a, 10142 Tallinn, Estonia
From: Komppa, Jarmo [mailto:
[email protected]]
Sent: Friday, February 21, 2020 10:24 AM
To: Maret Ots <
[email protected]>
Cc: Margus Sirel <
[email protected]>
Subject: RE: PLC G3-500
Dear Maret,
Finally (I don’t know what to say.) – please find attached updated Declaration of Conformity for DC450.
DoC_DC450_D000062806_b
With any questions, just come back to me.
Kind regards,
Jarmo
______________________________________________________________________________________________________
Jarmo Komppa | Landis+Gyr Oy | Sales Manager
Phone: +358 40 715 9689 |Switchboard: +358 14 660 100
Email:
[email protected] | Site: www.landisgyr.com/europe | Address: Salvesenintie 6, 40420 Jyskä, Finland
manage energy better
From: Maret Ots <
[email protected]>
Sent: perjantai 5. huhtikuuta 2019 8.39
To: Komppa, Jarmo <
[email protected]>
Cc: Margus Sirel <
[email protected]>
Subject: RE: PLC G3-500
Dear Jarmo,
Thank you for this information.
The Declarations of Conformities for 1-ph (E450-1 G3 PLC) and 3-ph (E450-3 G3 PLC) meters are correct.
We are still waiting for the document for data concentrator (DC450).
Best regards
3
Maret Ots
Chief Specialist of Frequency Management Division
+372 667 2092|
[email protected] | www.ttja.ee
Consumer Protection and Technical Regulatory Authority
Sõle 23A, 10614 Tallinn, Estonia
From: Komppa, Jarmo <
[email protected]>
Sent: Friday, March 29, 2019 8:09 AM
To: Maret Ots <
[email protected]>
Subject: RE: PLC G3-500
Dear Maret,
I apology slow progress on our side, and it is still ongoing.
Please find attached updated Declaration of Conformities for 1-ph (E450-1 G3 PLC) and 3-ph (E450-3 G3 PLC)
meters; the document for data concentrator (DC450) is still in process.
DoC_E450-1_G3-PLC_D000062776_EXT141-3
DoC_E450-3_G3-PLC_D000062777_EXT142-3
I will come back to you later with documents for DC450.
Best regards,
Jarmo
From: Komppa, Jarmo
Sent: 2. tammikuuta 2019 15:33
To: 'Maret Ots' <
[email protected]>
Subject: RE: PLC G3-500
Dear Maret,
thank you for your feedback. I will provide this to my colleagues.
Best regards and Happy New Year!
Jarmo
From: Maret Ots <
[email protected]>
Sent: 2. tammikuuta 2019 15:17
To: Komppa, Jarmo <
[email protected]>
Cc: Margus Sirel <
[email protected]>; Margus Krupp <
[email protected]>
Subject: RE: PLC G3-500
Dear Jarmo,
Thank you for this explanation.
4
In the ETSI EG 203 367 we can find recommendations for use of harmonised standards and conformity assessment
of combined radio and non-radio equipment. This guidance is very good usable in nowadays also. In the subclause
6.1 of the guidance you can find clear explanations, in which conditions the manufacturer must re-access the
equipment for radio requirements and on which conditions it is not mandatory.
You are correct that in June 2016 there was no clear explanation for conformity assessment of combined radio and
non-radio equipment from Commission yet. But the Directive 2014/53/EU (RED) was already in force and usable.
Anyway if the combined radio and non-radio equipment includes radio modem then the Declaration of Conformity
must include information about conformity assessment of the combined equipment against article 3.2 of the RED
notwithstanding that the tests were provided by manufacturer of the combined product or by manufacturer of the
radio modem. The producer of the combined equipment is responsible for the final product.
Best regards and Happy New Year!
Maret Ots
From: Komppa, Jarmo <
[email protected]>
Sent: Friday, December 14, 2018 4:18 PM
To: Maret Ots <
[email protected]>
Subject: RE: PLC G3-500
Dear Maret Ots,
Thank you for your sincere commitment to follow up what is required for proper DoC. We understand our DoC for
DC450 v2 G3 PLC is not fully compliant with current EU recommendations for DoC. The DoC was done already in
June 2016 and at that time it was considered to meet all valid requirements for DoC.
Landis+Gyr Declaration of Conformity documents for products DC450 v2 G3 PLC, Webdyn 2G/3G and Webdyn
2G/3G/4G modem module are based on guidance given in ETSI EG 203 367 (Guide to the application of harmonised
standards covering articles 3.1b and 3.2 of the Directive 2014/53/EU (RED) to multi-radio and combined radio and
non-radio equipment). ETSI EG 203 367 describes concept of combined radio and non-radio equipment and
applicable requirements for each of them. This concept applies to DC450 product concept as well.
Best regards,
Jarmo
______________________________________________________________________________________________________
Jarmo Komppa | Landis+Gyr Oy | Sales Manager
Phone: +358 40 715 9689 |Switchboard: +358 14 660 100
Email:
[email protected] | Site: www.landisgyr.com/europe | Address: Salvesenintie 6, 40420 Jyskä, Finland
manage energy better
From: Maret Ots <
[email protected]>
Sent: 28. marraskuuta 2018 15:25
To: Komppa, Jarmo <
[email protected]>
Cc: Taavi Lentso <
[email protected]>; Margus Krupp <
[email protected]>; Margus Sirel
<
[email protected]>
Subject: RE: PLC G3-500
5
Dear Jarmo Komppa,
Thank for this information.
As you have no used harmonised standards for EMC testing it is highly recommended to include the additional
information about testing the equipment in Notified Body number: 0680 for EMC directive requirements into the
Declaration of Conformity.
The Guide for the EMCD (Directive 2014/30/EU) is available on European Commission website. You can find
recommendations for an EMC assessment where no harmonised standards were applied from subsection 4.3.3 and
for EU Declaration of Conformity frpm subsection 4.2.2.
Please give this information to the manufacturer.
Best regards,
Maret Ots
Chief Specialist of Frequency Management Department
+372 667 2092|
[email protected] | www.tja.ee
Technical Regulatory Authority
Sõle 23A, 10614 Tallinn, Estonia
From: Komppa, Jarmo <
[email protected]>
Sent: Tuesday, November 27, 2018 6:11 PM
To: Maret Ots <
[email protected]>
Cc: Taavi Lentso <
[email protected]>; Margus Krupp <
[email protected]>; Margus Sirel
<
[email protected]>
Subject: RE: PLC G3-500
Dear Maret Ots,
as there is no harmonized standard for 150-500kHz PLC inside EU at the moment, IEEE P1901.2a:2015 was selected
for test standard together with Notified Body (CETECOM).
G3 PLC device Declaration of Conformities are referring to;
Please find attached two additional DoCs
DoC_E450-3_G3-PLC_D000062777_EXT142-2 for 3-phase meter (Production in Greece)
DoC_E450-1_G3-PLC_D000062776_EXT141-2 for 1-phase meter (Production in Greece)
6
EMCD 2014/30/EU
Function Document E450 3ph G3-PLC
Harmonised Standard
EN 50470-1 CoC-16200411-01b
EN 62052-11 T10690R11
Metrology (static meters)
EN 62053-21
EN 62053-23
EN 50065-1 Test Certificate TRA-026623-35-
CENELEC A PLC band Test Certificate TRA-026623-35-
EN 50065-2-3
EN 55022 CETECOM certificate NB16002
150-500 kHz PLC band EN 50065-1
IEEE 1901.2 NOTE
Test Report TRA-035965-44-01A
ETSI EN 301 489-1 (V2.1.1)
LPR (Wireless MBUS)
ETSI EN 301 489-3 (V2.1.0)
NOTE: There is no generally accepted regulation for 150-500 kHz PLC band in EU. This needs to be assessed
case-by-case, EN 55022 + EN 50065-1 + IEEE 1901.2 is one possibility. See IEEE 1901.2 Table 7-2 for further
information.
Best regards,
Jarmo
From: Komppa, Jarmo
Sent: 26. marraskuuta 2018 17:49
To: 'Maret Ots' <
[email protected]>
Cc: Taavi Lentso <
[email protected]>; Margus Krupp <
[email protected]>; Margus Sirel
<
[email protected]>
Subject: RE: PLC G3-500
Dear Maret Ots,
thank you for your notices.
Both declarations are correct,
DoC_E450-3_G3-PLC_D000055292 is for 3-phase meter (Production in UK, Northfields)
DoC_E450-1_G3-PLC_D000055293 is for 1-phase meter (Production in UK, Northfields)
I will be in contact to our Product Manager to clarify the issue.
Best regards,
Jarmo
______________________________________________________________________________________________________
Jarmo Komppa | Landis+Gyr Oy | Sales Manager
Phone: +358 40 715 9689 |Switchboard: +358 14 660 100
Email:
[email protected] | Site: www.landisgyr.com/europe | Address: Salvesenintie 6, 40420 Jyskä, Finland
manage energy better
From: Maret Ots <
[email protected]>
Sent: 26. marraskuuta 2018 9:24
7
To: Komppa, Jarmo <
[email protected]>
Cc: Taavi Lentso <
[email protected]>; Margus Krupp <
[email protected]>; Margus Sirel
<
[email protected]>
Subject: RE: PLC G3-500
Dear Jarmo Komppa,
Thank you for this information.
We carefully checked the documents you have sent.
There are two slightly different DoC-s for product E450 IDIS. Which is the correct one?
Anyway on the both documents are mentioned two notified bodies one for MID and the second one for
the qualified system.
The notified body for EMC directive is missing on the both DoC’s. The manufacturer can use the standards EVS-EN
50065-1:2011 “Signalling on low-voltage electrical installations in the frequency range 3 kHz to 148,5 kHz - Part 1:
General requirements, frequency bands and electromagnetic disturbances” and
EVS-EN 50065-2-3:2003 “Signalling on low-voltage electrical installations in the frequency range 3 kHz to 148,5 kHz
Part 2-3: Immunity requirements for mains communications equipment and systems operating in the range of
frequencies 3 kHz to 95 kHz and intended for use by electricity suppliers and distributors” for conformity assessment
to EMC Directive without using the appropriate notified body only for frequency ranges mentioned in the standards.
Otherwise they have to use the EMC Directive notified body.
The both DoC-s are not correct for conformity assessment for smart meters using frequencies in frequency range
148,5 kHz to 500 kHz.
Best regards,
Maret Ots
Chief Specialist of Frequency Management Department
+372 667 2092|
[email protected] | www.tja.ee
Technical Regulatory Authority
Sõle 23A, 10614 Tallinn, Estonia
From: Komppa, Jarmo <
[email protected]>
Sent: Tuesday, November 13, 2018 2:46 PM
To: Maret Ots <
[email protected]>
Cc: Taavi Lentso <
[email protected]>; Margus Krupp <
[email protected]>; Margus Sirel
<
[email protected]>
Subject: RE: PLC G3-500
Dear Mrs Maret Ots,
thank you for the clarification. I will discuss with our Product Manager and come back to you.
8
Please find attached the DoC’s for the meters, DoC_E450-3_G3-PLC_D000055292 and DoC_E450-1_G3-
PLC_D000055293.
Best regards,
Jarmo
From: Maret Ots <
[email protected]>
Sent: 13. marraskuuta 2018 14:32
To: Komppa, Jarmo <
[email protected]>
Cc: Taavi Lentso <
[email protected]>; Margus Krupp <
[email protected]>; Margus Sirel
<
[email protected]>
Subject: RE: PLC G3-500
Dear Mr Jarmo Kompa,
Thank you for the DoC for the Data concentrator DC450 FCC. It is not correct. On the DoC is missing EC identification
number of Notified Body and information for RED.
We need also DoC for smart meter.
Best regards
Maret Ots
Chief Specialist of Frequency Management Department
+372 667 2092|
[email protected] | www.tja.ee
Technical Regulatory Authority
Sõle 23A, 10614 Tallinn, Estonia
From: Komppa, Jarmo <
[email protected]>
Sent: Tuesday, November 13, 2018 12:02 PM
To: Maret Ots <
[email protected]>
Cc: Taavi Lentso <
[email protected]>; Margus Krupp <
[email protected]>; Margus Sirel
<
[email protected]>
Subject: RE: PLC G3-500
Dear Maret Ots,
Please find attached the EC Declaration of Conformity for Data Concentrator DC450 PLC G3-500;
“DoC_DC450_FCC_D000057181_c”. That is the document we have sent earlier, included with the other documents. I
am not sure if there is misunderstanding; we have understood that your point is that this document is not in
accordance Annex III to European Decision 768/2008 / EC; now I understand that you haven’t received it at all (?).
Best regards,
Jarmo
______________________________________________________________________________________________________
Jarmo Komppa | Landis+Gyr Oy | Sales Manager, Baltics and Norway
9
Phone: +358 40 715 9689 |Switchboard: +358 14 660 100
Email:
[email protected] | Site: www.landisgyr.com/europe | Address: Salvesenintie 6, 40420 Jyskä, Finland
manage energy better
From: Maret Ots <
[email protected]>
Sent: 12. marraskuuta 2018 13:35
To: Komppa, Jarmo <
[email protected]>
Cc: Taavi Lentso <
[email protected]>; Margus Krupp <
[email protected]>; Margus Sirel
<
[email protected]>
Subject: RE: PLC G3-500
Dear Mr Jarmo Kompa,
We have got lot of documents from you for different PLC equipment produced by Landis Gyr. We are still waiting
for the EC Declaration of Conformity for PLC G3-500 in accordance Annex III to European Decision 768/2008 / EC.
Technical Regulatory Authority cannot accept the documents you have sent before you we will get the EC
Declaration of Conformity for PLC G3-500 in accordance European regulation.
Best regards,
Maret Ots
Chief Specialist of Frequency Management Department
+372 667 2092|
[email protected] | www.tja.ee
Technical Regulatory Authority
Sõle 23A, 10614 Tallinn, Estonia
From: Komppa, Jarmo <
[email protected]>
Sent: Thursday, November 08, 2018 12:00 PM
To: Maret Ots <
[email protected]>
Subject: FW: PLC G3-500
Dear Mrs Ots,
I tried to reach you by phone this morning. We are contacting you regarding PLC G3-500 topic, on which Margus
Sirel has discussed with you. I agreed with Margus, that I shall be directly in contact with you to clarify the open
topic on this matter.
In your mail you mentioned that there has been provided lot of documents, just in case please find attached two
additional documents made by Cetecom (Test Report No.: 1-0711/15-01-04, Certificate NB16003).
You are mentioning, that our DoC is not compliant;
“I sent an e-mail to EVS today asking for information on CNELEC's plans for extending the frequency range
(we talked about it at the EVS event with Martin). If I get the answer, then I will forward it to you.
10
The manufacturer has sent a lot of documents, but there are no compliant declarations of conformity. On the
basis of the documents sent, we would soon be able to put together the declaration.
The requirements of the Declaration of Conformity are set out in the Product Conformity Act (§ 19).
Annex III of European Decision 768/2008 / EC, referred to by law, contains the information that must at least
include a declaration of conformity.
The manufacturer must place this document in order to enter the European market. Only when we have
received the correct declaration of conformity we can assume that the equipment is not interrupted and
suitable for use in the European electricity grids.
Therefore, please ask the manufacturer for the EC Declaration of Conformity and refer to Annex III to
European Decision 768/2008 / EC.”
We thought that all needed information is provided;
Could you please some back to us with your notices which part we are missing or to propose some time slots for a
telco.
Best regards,
Jarmo
______________________________________________________________________________________________________
Jarmo Komppa | Landis+Gyr Oy | Sales Manager, Baltics and Norway
Phone: +358 40 715 9689 |Switchboard: +358 14 660 100
Email:
[email protected] | Site: www.landisgyr.com/europe | Address: Salvesenintie 6, 40420 Jyskä, Finland
manage energy better
From: Maret Ots [mailto:
[email protected]]
Sent: Tuesday, October 23, 2018 9:12 AM
To: Margus Sirel <
[email protected]>
Subject: RE: PLC G3-500
Tere
Saatsin täna EVS-ile kirja, milles palusin infot CNELEC-i plaanide kohta sagedusala laiendamise osas (sellest rääkisime
EVS-i üritusel Martiniga). Kui vastuse saan, siis edastan selle sullegi.
Tootja on saatnud palju dokumente, kuid nõuetele vastavat vastavusdeklaratsiooni nende hulgas pole. Saadetud
dokumentide põhjal saaksime juba ise varsti deklaratsiooni kokku panna.
11
Nõuded vastavusdeklaratsioonile on sätestatud Toote nõuetele vastavuse seaduses (§19).
Seaduses viidatud Euroopa otsuse 768/2008/EÜ lisa III on toodud info, mida peab vastavusdeklaratsioon vähemalt
sisaldama.
Tootja peab selle dokumendi kokku panema selleks et tulla Euroopa turule. Alles siis, kui oleme saanud korrektse
vastavusdeklaratsiooni saame me eeldada, et seadmed ei tekita häireid ja sobivad Euroopa elektrivõrkudes
kasutusevõtuks.
Seega, palun küsi tootjalt EC vastavusdeklaratsiooni ja saada talle sealjuures viide Euroopa otsuse 768/2008/EÜ
lisale III.
Tervitades
Maret
From: Margus Sirel <
[email protected]>
Sent: Monday, October 22, 2018 9:45 AM
To: Maret Ots <
[email protected]>
Subject: FW: PLC G3-500
Tere
Saadan edasi nüüd viimased dokumendid.
Ootan Teie tagasisidet algselt püstitatud küsimusele – kas antud kõrgema sagedusega elekterliinside 3GPLC
tehnoloogia kasutamine Eesti võrguettevõtja(te) elektrivõrgus (ka tarbijate elektrivõrgus – arvestid korter;-
eramajades nt) on TJA poolt aktsepteeritav?
Tervitades
Margus
PLEASE CONSIDER OUR ENVIRONMENT BEFORE PRINTING THIS EMAIL.
This e-mail (including any attachments) is confidential and may be legally privileged. If you are not an intended recipient or an authorized
representative of an intended recipient, you are prohibited from using, copying or distributing the information in this e-mail or its attachments. If
you have received this e-mail in error, please notify the sender immediately by return e-mail and delete all copies of this message and any
attachments. Thank you.
12