dokumendiregister.ee
OtsingAsutusedMCP
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel
Otsing›Veeteede Amet
Sissetulev kiriAvalik

Assessment of Icebreakers

Veeteede Amet · 5. juuli 2017
Viit
1-1-6/1966
Registreeritud
5. juuli 2017
Dokumendi liik
Sissetulev kiri
Adressaat
DNV GL Oy Ab
Saabumis/saatmisviis
e-post
Funktsioon
1-1 Üldjuhtimine
Sari
1-1-6 Kirjavahetus ameti töövaldkondade üldistes küsimustes
Toimik
1-1-6/2017
Vastutaja
Martin Kaarjärv (Veeteede Amet, Kasutajad, Hüdrograafia ja navigatsioonimärgistuse teenistus, Laevastiku osakond, Jäämurdja Tarmo)

Failid

  • 📎E-kiri.pdf296 KB
  • 📎image001.gif
  • 📎Proposal to ESA on assessment of Ice-breaker -draft for discussion-v1.pdf1906 KB
  • 📎Proposal to ESA on assessment of Ice-breaker -draft for discussion-v1.pptx

Sisu (failidest)

As s e s s me nt o f Ic e bre ake rs 2017.06.16 This proposal is business sensitive to DNV GL and is being transmitted to Estonian Maritime Administration as confidential. No part of the proposal may be duplicated or used, or disclosed for any other purpose than to evaluate this proposal. DNV GL © 2014 Safer, smarter, greener DNV GL © 2014 Proposal title DNV GL AS P.O. Box 300 Assessment of Icebreakers 1322 Høvik, Norway Tel: +47 67 57 99 00 http://www.dnvgl.com Org. No: NO 945 748 931 MVA Customer Estonian Maritime Administration Customer Address Customer Reference Contact Person Rene Arikas, Director of the Estonian Maritime Administration (EMA). DNV GL Legal Entity DNV GL AS DNV GL Reference Date of Issue: 16 June 2017 Validity of Proposal 4 weeks from date of issue Terms and Conditions DNV GL standard terms & conditions for technical due diligence services Prepared by / Contact Person Position Signature Richard Tao Discipline Leader, DNV GL Maritime Approved by Position Signature Ellen Olsvik BDL, DNV GL Maritime DNV GL © 2014 Background and Purpose § Estonian Maritime Administration (EMA) is in charge of the government owned vessels which include two icebreakers. – “Tarmo” was built in 1963 – “Eva­316” was built in 1980 § All countries in the Baltics have icebreaker capacity to ensure open waterways during cold winters, and the EU are supporting the smallest countries with special funding if proven necessary to maintain or further develop their local services. § The two icebreakers managed by EMA are getting older, the oldest close to 65 years. It is a challenge to get spares and qualified support for old systems. The vessels are not classed, and inspection , maintenance and operation are handled by EMA internally. § Ice breaker “Botnica” which was built in 1998 to DNVGL class and currently still in Class has been excluded in this proposal. § EMA is looking to bring more competence into its organization and finding a better balance between “in house vs hired” capabilities. It is the intention of EMA to work on a specific program to change this in the future. § The remainder of this presentation outlines how Maritime Advisory in DNV GL (the consultant, DNV GL) plan to undertake such a project and detail the scope of such a project. DNV GL © 2014 Click icon to add picture DNVGL Support Click icon to add table DNV GL © 2014 Working method – frame work A: B: C: D: Technical condition Vessel management Fleet replacement Docking support assessment audit and decision support What benchmarking Step 1: Step 2: Step 3: Step 4: Step 5: Preparations and Document review Condition Life extension, Docking and planning assessment and fleet replacement upgrade support audit How Perform Agree on Review vessel and Life extension Verification of boundaries of relevant company analysis, repair in study documents audits assessment docking yard Plan Prepare Perform Docking upcoming Recommenda checklist and technical Project workshops / tions audit program inspections Management site visits Fleet replacement decision support DNV GL © 2014 Work scope – step 1 ­ Preparations and planning – Establish relationship between Client and Consultant organisation/teams. – Meeting with key stakeholders to clarify expectations – Introduction of DNV GL Life Extension Program principal and methodology, collecting key documents for the project – Clarifications on Project Details, Method, Approach – Discuss Schedule and Deliverables – Set up system for virtual database for exchange of documents, drawings etc. – Identify relevant documentation – Establish timelines for various activities DNV GL © 2014 Work scope – step 2 ­ Document review § Document Review – Review of vessel drawings – Hull and machinery drawings – Layout and safety drawings – Reports – Docking reports – UTM reports – Inspection reports – Records/Data – Vessel trading history and performance data – Marine machinery system performance data – Vessel damage and repair – Maintenance history, Other reports as deemed necessary – This phase focuses on establishing the existing condition of the vessel by review the relevant documentation. DNV GL © 2014 Typical resource requirement § A classification of required systems evaluation as below: Hull Integrity DNV GL © 2014 Work scope – step 3 ­ Condition assessment § Technical condition assessment – A condition assessment survey indicates actual condition of the vessel and its suitability for operations. The inspection may also reveal areas of attention and minor improvements required to operate the ship further. The templates developed during the preparation stage shall be used to document the condition on board. – In cooperation with the client clearly define what should be inspected and generate an inspection plan – Carry out the inspection, document the inspection including evaluation of findings and rating of various items on board – Survey of special systems § Reporting – A rating system for evaluation of different items and for future use shall be separately – Following all the different phases as developed. outlined above, a draft report to be presented to the client. The draft report shall underline all the relevant findings and recommendations. – The draft report shall indicate corrective actions that needs to be attended to immediately and actions that need attention in due course and general recommendations over the extended life time of the vessel. – Once the key recommendations from the final reports are addressed or if actions for carrying out the key recommendations are outlined, DNV GL MA may issue a final report with closing of findings and handling of recommendations or actions in place to handle the recommendations. – A reporting system for future use shall be separately developed. DNV GL © 2014 Work scope – step 3 – Management/Vessel Audit § Management audit – A safety management manual shall be developed if not in existence. – Manual shall identify the procedures and systematics to be followed during the vessel inspections, on board operations and maintenance from ashore as well as onboard. – An audit plan shall be developed – Interview with onboard and shore personnel shall be carried out. – A system shall be developed separately for logging in the various activities, records, procedures and actions followed for maintenance of the vessel on shore as well as on board. § Reporting – Following the audit, a report shall be presented to the Client. – The report shall highlight key areas for improvement and immediate actions to be taken. – A reporting system for future use shall be separately developed. DNV GL © 2014 Vessel management audit (1) Vessel management audit scope: Review (documents & interviews) based on the DNV GL Fleet Management Benchmark Tool with focus on the following functions: § Maintenance management § Docking management § Project management § QHSE (including Safety Management System and Risk Management) DNV GL © 2014 Vessel management audit (2) Each function will be reviewed with regards to the following sub­functions: 2 Maintenance management & asset integrity 5 QHSE 2.1 Goals & requirements 5.1 Safe operations (Safety Management System) 2.2 Maintenance plan 5.2 Emergency preparedness 2.3 Planning & execution 5.3 Continuous improvement 2.4 Inventory management 5.4 Risk management 2.5 Reporting & analysis 5.5 Environmental Protection 3 Docking Management 9 Project management 3.1 Management & organisation 9.1 Project coordination 3.2 Pre-planning phase 9.2 Project planning 3.3 Detailed planning & preparation phase 9.3 Project execution 3.4 Drydocking execution phase 9.4 Project control 3.5 Closing phase 9.5 Project close out 3.6 Drydocking performance 9.6 Project management performance 9.7 New building projects Reporting: A report will be supplied with observations and recommendations with regards to the selected management functions. DNV GL © 2014 Work scope – step 4 – Life extension assessment § Analysis & benchmarking – Regulatory framework applicable for similar ship types. – Findings analysis to identify survey findings (damages)of similar type of the vessel in DNVGL fleet and give an input to critical areas in the study. – Benchmarking of various systems and components on board with risk levels. – A typical example is given on the next slide. The final parameters shall be agreed together with the client. – The key focus areas could be availability, maintainability and efficiency. – Based on the results from benchmarking and the corresponding risk levels, a maintenance plan shall be developed for future as well as identify immediate actions. – This step would also reveal the need for replacement, modification or continued maintenance for various systems § and components Decision supporton board. – The results from Step 1 –Step 4 should give an indication on the feasibility to run the vessels as is and approximate costs required to continue running the vessels. – If not feasible to maintain, the possibility to procure used vessels shall be considered with possible candidates for conversion into ice breakers. – Possibility for new builds shall also be considered following steps 1­4. DNV GL © 2014 Proposed Methodology Analysis and Benchmarking A high level example of such a framework, reflecting the key parameters would look like : Functions Availability Efficiency Maintainability Rating Comment Type Code Name Function group xxx Main electric power Function group xxy Main electric power generation xxy.1 Generator driver Definition for the parameters: xxy.2 Coupling Availability – Is the system “available” as required? Focuses on functionality and operability of systems and components with a focus on utilisation xxy.3 Gear Maintainability – Can the system be maintained easily? xxy.4 Shafting The ease with which a system component can be maintained, including supply of spare parts and supportability. Related to downtime in xxy.5 Generator maintenance as well. xxy.6 Supporting structure Efficiency – Is this fit for purpose & performing as expected? The effectiveness with which a system performs, with respect to the designed performance, or with respect to the performance needed for the purpose. … Function group xxx Safety, other Function group xxy Helicopter safety arrangements § xxy.1 Helicopter pickshall The parameters for benchmarking up area be concluded together with client. § The weighting of parameters shall follow client inputs i.e. Safety, Maintenance etc. xxy.2 Obstacle­free sector § DNVGL would ideally like client to follow the project during its entire duration and be available for clarifications xxy.3 Rescue equipment xxy.4 Wind direction indicator DNV GL © 2014 xxy.5 Marking Work scope – step 4 ­ Fleet replacement decision support § Newbuilding specification defining support § Operational assessment § Workshop for defining ships operational profile § Defining operational conditions for the basis of design and specification § Support for selecting class notation § Ice class selection support § Winterization requirements defining and winterization options planning § Polar Code assessment for newbuilding (eventually other vessels as well) § Specification of the relevant national and international regulations that might have effect on vessel’s design § Mapping of other relevant functions for the vessel e.g. DNV GL © 2014 Work scope – step 5 ­ Docking and upgrade support Docking project management support B.) During drydocking phase: A.) Preparation and tender phase: § Project management and supervision during DD § Cost and progress follow up § Follow up of sub­suppliers § Review current docking management process and § Field reporting during DD performance and establish GAP with industry best § Inspection of work performed by yard and sub­ practice suppliers § Safety audits during DD § Provide recommendations for DD performance § Testing and sea­trials prior to departure from yard improvement activities § Settling of final yard bill § Assist with creation of: ­ DD procedures including DD process description C.) DD Closure and evaluation phase: with timeline (including yard safety) ­ Project risk assessment and management § Drydocking report: ­ Planning of long lead spares and services ­ technical (scope performed) ­ DD specification ­ financial ­ DD budget ­ service & test reports ­ DD tender invitation ­ certificates ­ Pre DD Yard QHSE Audit § DD performance evaluation ­ Tender evaluation review and yard selection (process/cost/time/quality/safety) ­ Repair agreement with selected yard § Yard performance evaluation ­ DD Field report template (progress, cost, time, § Archiving of DD documentation QHSE, etc.) ­ Variation order template (for additional work during yard stay) DNV GL © 2014 Value delivered Support on technical competence on all disciplines Independent Recommendation for assessment of future areas of effectiveness of improvement technical integrity Benchmarking of results against industry best practice DNV GL © 2014 Safeguarding life, property and the environment www.dnvgl.com Safer, smarter, greener DNV GL © 2014 Dsse From: Flagstad-Andersen, Tuva Kristine [mailto:[email protected]] Sent: Wednesday, June 28, 2017 1:30 PM To: Rene Arikas <[email protected]> Cc: Eknes, Arnstein <[email protected]>; Tao, Xiao Gang Richard <[email protected]>; Peetsalu, Jaanus <[email protected]> Subject: Assessment of Icebreakers Dear Rene, It was nice seeing you in Oslo in connection with Nor-Shipping! With reference to your discussion with Arnstein, our advisory unit has put together a proposal for scope related to the assessment of icebreakers. Please have a look and give us your comments/ feedback if this is in line with your thoughts, and we can tune accordingly (add/ remove/ change scope). Have a nice day, and talk to you later! -tuva- Best regards for DNV GL Oy Ab Tuva K. Flagstad-Andersen Area Manager Area Finland, Russia & Baltics E-mail [email protected] Mobile +358 504120191 | +47 911 09 669 www.dnvgl.com | LinkedIn ************************************************************************************** This e-mail and any attachments thereto may contain confidential information and/or information protected by intellectual property rights for the exclusive attention of the intended addressees named above. If you have received this transmission in error, please immediately notify the sender by return e-mail and delete this message and its attachments. Unauthorized use, copying or further full or partial distribution of this e-mail or its contents is prohibited. **************************************************************************************
Allikas: Veeteede Amet dokumendiregister →