General Information on the Article 2 and 5 in the Draft
Amendment of Technical Specifications for Mobile
Broadband Base Station Radio Frequency Equipment
In response to the amendment of "Regulations Governing the Operating Items
and Scope, the Timetable for Deregulation and the Number of Operators to Be
Allowed for Type I Telecommunication Enterprises" published on 18 April 2017,
which released 1800 MHz and 2100 MHz frequency bands for mobile broadband
services, NCC proposes to revise the "Technical Specifications for Mobile
Broadband Base Station Radio Frequency Equipment" by making references to
relevant international standards. Amendment points are described as below:
1. Scope (revision to Paragraph 2)
2. Test Regulation (revision to Paragraph 5)
1
Comparison Table of the Article 2 and 5 in the Draft Amendment of Technical Specifications
for Mobile Broadband Base Station Radio Frequency Equipment
Amended Title Current Title Descriptions
Technical Specifications for Mobile Technical Specifications for Mobile To make consistent terms mentioned
Broadband Business Base Station Radio Broadband Base Station Radio Frequency in technical specifications for
Frequency Equipment Equipment radio frequency equipment and
terminal equipment of mobile
broadband services, the title of
technical specifications are
amended to the "Technical
Specifications for Mobile Broadband
Business Base Station Radio
Frequency Equipment."
Amended Provisions Current Provisions Descriptions
2. Scope 2. Scope 1. In line with the release of the
This specifications are applicable to the This specifications are applicable to the 1800 MHz and 2100 MHz bands for
the use of mobile broadband
certification of the frequency bands for certification of the frequency bands for
services by the Executive Yuan in
mobile broadband services such as the mobile broadband services such as the
2017, the applicable scope of the
frequency equipment of Base Stations, frequency equipment of Base Stations, specifications is amended.
Repeaters, Micro Base Stations, Pico Repeaters, Micro Base Stations, Pico 2. Article 2.3~2.1 and 2.2 are
Cells and Femto Cells. Cells and Femto Cells. integrated.
Based on multiplexing properties, they Based on multiplexing properties, they
can be classified as frequency division can be classified as frequency division
duplex (FDD) and time division duplex duplex (FDD) and time division duplex
1
(TDD) with relevant frequency sections (TDD) with relevant frequency sections
are identified as below: are identified as below:
2.1 Frequency Division Duplex (FDD): 2.1 Frequency Division Duplex (FDD):
700 MHz (uplink 703 MHz-748 MHz\ 700 MHz (uplink 703 MHz-748 MHz\
downlink 758 MHz-803 MHz), 900 MHz downlink 758 MHz-803 MHz), 900 MHz
(uplink 885 MHz-915 MHz\downlink 930 (uplink 885 MHz-915 MHz\downlink 930
MHz-960 MHz), 1800 MHz (uplink 1710 MHz-960 MHz), and 1800 MHz (uplink 1710
MHz-1785 MHz\downlink 1805 MHz-1880 MHz-1770 MHz\downlink 1805 MHz-1865
MHz), 2100 MHz (uplink 1920 MHz-1980 MHz) bands.
MHz\downlink 2110 MHz-2170 MHz), 2500 2.2 Time Division Duplex(TDD):
MHz and 2600 MHz (uplink 2500 MHz-2570 2500 MHz and 2600 MHz bands (2570
MHz\downlink 2620 MHz-2690 MHz) bands. MHz-2620 MHz, including guard bands
2.2 Time Division Duplex(TDD): 2570 MHz-2575 MHz and 2615 MHz-2620
2500 MHz and 2600 MHz bands (2500 MHz).
MHz-2570 MHz, 2570 MHz-2620 MHz and 2620 2.3 Frequency Division Duplex (FDD) and
MHz-2690 MHz). Time Division Duplex(TDD):
2500 MHz and 2600 MHz bands (2500
MHz-2570 MHz and 2620 MHz-2690 MHz;
either one may be used in these
frequency bands; if FDD is adopted then
the uplink 2500 MHz-2570 MHz, downlink
2620 MHz-2690 MHz).
2
5. Test Requirement 5. Test Requirement 1. In response to the amendment of
Except as otherwise provided in these 5.1 Except as otherwise provided in these the "Low-power Radio-frequency
Devices Technical Regulations"
technical specifications, testing technical specifications, testing
and the existing regulations for
methods for examining emission power and methods for examining emission power
measuring in 3GPP TS 36.512-3,
out-of-band radiation emission shall all and out-of-band radiation emission current Article 5.2 is deleted.
be processed based on the inspection shall all be processed based on the 2. The item sequences in Article 5.1
requirements stated in Point 5 of the inspection requirements stated in Point are adjusted.
Low-power Radio-frequency Devices 5 of the Low-power Radio-frequency
Technical Specifications (LPRFD Devices Technical Specifications
Technical Requirements). The inspection (LPRFD Technical Requirements). The
procedures shall be processed in inspection procedures shall be
accordance of the Appendix 1 "Referential processed in accordance of the Appendix
Procedures of Inspecting Transmitters" 1 "Referential Procedures of Inspecting
of the Low-power Radio-frequency Devices Transmitters" of the Low-power
Technical Specifications (LPRFD Radio-frequency Devices Technical
Technical Requirements). Specifications (LPRFD Technical
Requirements).
5.2 The carrier emission bandwidth stated
in Section 4.2.2.2.2 of the
specifications shall be carried out
based on regulations stated in
"Emission Bandwidth" of Section 1.12(3)
of the Lower Radio-frequency Devices
Technical Specifications (LPRFD
Technical Requirements).
3
4
NOTIFICATION The following notification is being circulated in accordance with Article 10.6 1. Notifying Member: The Separate Customs Territory of Taiwan, Penghu, Kinmen and Matsu If applicable, name of local government involved (Article 3.2 and 7.2): 2. Agency responsible: National Communications Commission (NCC) 5th floor, No.16, Sec. 2, Ji-Nan Road Taipei City 10054, Taiwan Tel: +886-2-3343-8243 Fax: +886-2-2343-3636 Email:
[email protected] Name and address (including telephone and fax numbers, email and website addresses, if available) of agency or authority designated to handle comments regarding the notification shall be indicated if different from above: 3. Notified under Article 2.9.2 [ X ], 2.10.1 [ ], 5.6.2 [ X ], 5.7.1 [ ], other: 4. Products covered (HS or CCCN where applicable, otherwise national tariff heading. ICS numbers may be provided in addition, where applicable): Mobile Broadband Base Station Radio Frequency Equipment 5. Title, number of pages and language(s) of the notified document: Draft Amendment of Technical Specifications for Mobile Broadband Base Station Radio Frequency Equipment (5 page(s), in English; 3 page(s), in Chinese) 6. Description of content: In response to the amendment of "Regulations Governing the Operating Items and Scope, the Timetable for Deregulation and the Number of Operators to Be Allowed for Type I Telecommunication Enterprises" published on 18 April 2017, which released 1800 MHz and 2100 MHz frequency bands for mobile broadband services, NCC proposes to revise the "Technical Specifications for Mobile Broadband Base Station Radio Frequency Equipment" by making references to relevant international standards. Amendment points are described as below: Scope (revision to Paragraph 2) Test Regulation (revision to Paragraph 5) 7. Objective and rationale, including the nature of urgent problems where applicable: Streamlining administrative procedures and consumer protection. 8. Relevant documents: Telecommunications Act. 9. Proposed date of adoption: 15 January 2018 Proposed date of entry into force: 15 January 2018 10. Final date for comments: 11 December 2017 11. Texts available from: National enquiry point [ X ] or address, telephone and fax numbers and email and website addresses, if available, of other body: WTO / TBT Enquiry Point The Bureau of Standards, Metrology and Inspection Ministry of Economic Affairs 4 Chinan Road, Section 1 Taipei City 100, Taiwan Tel.:(+886 2) 2343 1916 Fax:(+886 2) 2343 1804 E-mail:
[email protected] https://members.wto.org/crnattachments/2017/TBT/TPKM/17_4811_00_e.pdf https://members.wto.org/crnattachments/2017/TBT/TPKM/17_4811_00_x.pdf
Saatja: WTO Teabekeskus/WTO Enquiry Point (Estonia) <
[email protected]>
Saaja:
[email protected], Meeli Lindsaar,
[email protected],
[email protected], Priit Laaniste,
[email protected], Heddi Lutterus, Kristiina Tammeraid, Ivo Jaanisoo, Kertu Martšenkov, Laura Kask, Mart Laas, Maret Ots, Thea Palm, Triinu Sillamaa, Riina Piliste,
[email protected], Pavel Karev, Indrek Laineveer, Ain Tatter, Aigi Kasvand, el teavitamine
Teema: WTO liikmetelt saabunud TBT ja SPS uued teatised EVS kodulehel
Lugupeetud kontaktisikud
Vastavalt VV määruse nr. 140 „Kavandatavast tehnilisest normist,
infoühiskonna teenusele kehtestatavast nõudest ja teenuse osutamise
nõudest teavitamise kord ning teavitamist koordineeriva asutuse
määramine <https://www.riigiteataja.ee/akt/112082014009> “ §-le 9
teavitab määruses nimetatud teabekeskusena tegutsev Eesti
Standardikeskus vähemalt 2 korda kuus asjaomaseid ministeeriume Maailma
Kaubandusorganisatsiooni (WTO) osapooltelt tehnilisi norme ja sanitaar-
ja fütosanitaarmeetmeid sisaldavate õigusaktide kohta saabunud
teatistest.
Käesolevaga teavitame, et detsembrikuu jooksul on praeguseks avaldatud
41 uut TBT (tehnilised kaubandustõkked) teatist, millega on võimalik
tutvuda:
TBT Teatised - Eesti Standardikeskus
<https://www.evs.ee/Tootedjateenused/WTOteatised/TBTTeatised/tabid/119/D
efault.aspx>
Ja 27 uut SPS (sanitaar- ja fütosanitaarmeetmed) teatist, millega on
võimalik tutvuda:
SPS Teatised - Eesti Standardikeskus
<https://www.evs.ee/Tootedjateenused/WTOteatised/SPSTeatised/tabid/120/D
efault.aspx>
Eesti Standardikeskuses asuv Teabekeskus:
* avaldab info uute teatiste kohta 3 päeva jooksul pärast
teatise saamist WTO osapoolelt;
* säilitab uued teatised oma kodulehel 60 päeva,
* huvi korral hangib teatises viidatud eelnõu tervikteksti;
* võtab vastu asjast huvitatud osapooltelt kommentaare teatises
esitatud eelnõude kohta 40 päeva jooksul teatise avaldamise kuupäevast.
Lugupidamisega
Signe Ruut
WTO Teabekeskus
Eesti Standardikeskus
Tel: 605 5062
E-post:
[email protected] <mailto:
[email protected]>
www.evs.ee <http://www.evs.ee>