dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Tarbijakaitse ja Tehnilise Järelevalve Amet
Sissetulev kiriAvalik

CHRISTINE meeting minutes / EU benchmark / presentations

Tarbijakaitse ja Tehnilise Järelevalve Amet · 9. oktoober 2017
Viit
17-0236-011
Registreeritud
9. oktoober 2017
Dokumendi liik
Sissetulev kiri
Saabumis/saatmisviis
e-post
Funktsioon
6S Transpordi valdkonna arendustegevus ja standardimine (2014-2017) (Suletud)
Sari
6-11 Raudteeinfrastruktuuri kasutustasu määramisega seonduvad dokumendid
Toimik
17-0236
Vastutaja
TJA Migratsioon (Transpordi investeeringute osakond)
Lahendamise tähtaeg
8. november 2017

Failid

  • 📎11th_CHRISTINE_2017_ALL_PRESENTATIONS.pdf13377 KB
  • 📎11th CHRISTINE minutes.docx20 KB
  • 📎Minutes and prezentations of 11th CHRISTINE conference..msg13730 KB

Sisu (failidest)

Opening of the CHRISTINE 11th meeting in Riga, Latvia Maris Andins JSC LatRailNet Facts and numbers about Latvia to warm up 1/3 of the total population (0,65 of 2 million) live in capital (Riga) One of the oldest languages in Europe still spoken Consumer prices approx. 35-42% lower than in Brussels, London, Rome and Paris More than 1/3 of Latvia is covered by forest 500 km of white sand beaches, 12 000 rivers and over 2 000 lakes Collection of over 300 000 traditional folk songs 7th fastest internet speed 78 liters of beer per capita consumed yearly High rate of fashion models per capita, average women are taller than ladies of any other nation 7th highest percentage (45,7%) of women in managerial positions of business companies Welcome to Riga Amazing Art Nouveau and other architecture from various times and political regimes reflecting history of 800 years Must see places in Riga House of Blackheads, Monument of Freedom, Dome square, TV Tower, churches and golden roosters on top, riverfront of Daugava and more… … and more … massive Central Market of Riga … open-air etnographic museum of traditional Latvian lifestyle We love to sing and dance Riga is the host of traditional song and dance festival with 40 000 participants Taste Riga Riga Black Balsam, black (rye) bread and local Latvian beer Railway sector in Latvia Facts (2016): • 1859 km operational length of all lines (248 km suburban electrified) • 16.5 million total train-kilometres • 47.8 million tonnes annual freight volume (-14%) • 17.2 million passengers carried (+1%) • 3 freight and 2 passenger operators • highest freight transport modal split in EU Freight volumes 2016 total freight volume – 47,8 million tonnes (14,0% decrease) 21,8 21,3 20,1 19,1 16,6 15,9 1,8 1,8 1,7 1,13 1,3 1,4 1,1 0,3 2014 2015 2016 Oil and oil products Coal Minerals Black metals Chemicals Organisational structure • infrastructure manager (Latvian Railway - LDZ) and freight / international passenger operator (LDZ CARGO) both inside the state-owned railway concern • independent charging and allocation body (AS LatRailNet) - subsidiary of the concern (LDZ) About the organizer • Part of SJSC Latvian Railway holding, separated independent company • Established in 2010 • 29 employees • Performer of essential functions of the IM: - Decision-making on train path allocation - Determination and collection of the charges • Independency requirements set out in Railway Law About the meeting • CHRISTINE + PRIME • significant TAC related railway industry event • 20+ countries represented Meeting venue WiFi network access WiFi hotspot: RadissonBlu Daugava Free access (without password) Meeting agenda September 20 (day one) September 21 (day two) Working session Introduction part Other topics and conclusions of CHRISTINE Working session CHRISTINE & PRIME joint session Direct costs, charging systems and current TAC Differentiation tools status of legal framework Working session PRIME session 1 Market segmentation and mark-ups Working session PRIME session 2 Factors affecting track maintenance costs Agenda: September 20 (part 1) 9:00 – 9:30 Welcome coffee, Hotel Radisson Blu Daugava 9:30 – 11:40 Introduction part - Presentation of participants - Organizational instructions - Latvian Railway presentation Discussions on agenda 11.40 – 12.00 Coffee break 12:00 – 14:00 Working session: TAC Differentiation tools - Benchmark TAC 2018 [presented by ÖBB] - Changes in TAC system [presented by HŽ Infrastruktura] - Noise differentiated TAC [presented by BAV] Discussions: Does differentiation of the infrastructure charge give incentives to RUs? 14:00 – 15:00 Lunch, Hotel Radisson Blu Daugava restaurant Agenda: September 20 (part 2) 15:00 – 16:40 Working session: Market segmentation and mark-ups - Ramsey-Pricing and price elasticities [presented by ÖBB] - Market segmentation and mark-ups in freight [moderated by BAV] Discussions: Has IM to meet maintenance requirements or to meet user needs? 16:40 – 17:00 Coffee break 17:00 – 18:30 Working session: Factors affecting track maintenance costs - UIC documents usage in cost allocation [presented by ProRail] - Comparative analysis of factors affecting track maintenance costs [presented by LatRailNet] Discussions: Who or what incurs costs that are not directly incurred as a result of operating the train? 18:30 – 19:30 Logistics for the evening 19:30 Dinner, Fazenda Bazārs restaurant Logistics for the evening Meeting point: RadissonBlu lobby at 18:45! Agenda: September 21 (part 1) 9:00 – 9:30 Welcome coffee, Hotel Radisson Blu Daugava 9:30 – 11:40 Working session: Other topics and conclusions of CHRISTINE - German TAC system and experience with the regulatory body [presented by DB-Netz] - Network area [presented by LatRailNet] - Conclusions of the CHRISTINE session and next venue Discussions: Information exchange between CHRISTINE, PRIME and Commission [moderated by ADIF] 11:40 – 12:00 Coffee break 12:00 – 14:00 CHRISTINE & PRIME JOINT SESSION: Direct costs, charging systems and current status of legal framework - Presentation of Estonian railway and Charging scheme [presented by TJA] - Presentation of Lithuanian railway and Charging scheme [presented by LG] - Presentation of Serbian railway and Charging scheme [presented by DR] Discussions: Does common rules means endogenous results? 14:00 – 15:00 Lunch, Hotel Radisson Blu Daugava restaurant Agenda: September 21 (part 2) 15:00 – 16:40 PRIME session I - Introduction, expectations and plans [presented by Alain Quinet, Maria Álvarez and Sian Prout] - Implementation of the rules (EU Law) on direct costs and related problems [presented by Frank Jost] 16:40 – 17:00 Coffee break 17:00 – 18:30 PRIME session II - Compatibility with EU laws [state of play and discussion] - Conclusions of the PRIME session 18:30 – 19:00 Logistics to the museum 19:00 – 20:00 Excursion to the Latvian Railway Museum (Optional) 20:00 Farewell Logistics for the railway museum Meeting point: RadissonBlu lobby at 18:45! Meeting coordinator Feel free to contact in case of any questions: Eriks Pjatkins Event head coordinator JSC LatRailNet Assistant manager phone: +371 20394650 e-mail: [email protected] or find on web: www.lrn.lv/christine/contact/ Thank you for your attention! for more info visit www.lrn.lv/christine Distinctions meet! Justina HUDENKO JSC LatRailNet TAC Differentiation tools Time frame: 12:00-14:00 Presentations: • Benchmark TAC 2018 [ÖBB] • Changes in TAC system [HŽ Infrastruktura] • Noise differentiated TAC [BAV] Discussions: Does differentiation of the infrastructure charge give incentives to RUs? Differentiation tools • Most popular: reservation charges; performance scheme; ETCS/ERTMS • Not in use: investment projects based • 6 countries use only 1 or 2 differentiation tools • 7 countries use 3 or more differentiation tools Does differentiation of the infrastructure charge give incentives to RUs? Market segmentation and mark-ups Time frame: 15:00-16:40 Presentations: • Ramsey-Pricing and price elasticities [ÖBB] Discussions: • Market segmentation and mark-ups in freight [BAV] • Has IM to meet maintenance requirements or to meet user needs? Regulation on segmentation • Full IM/AB responsibilty in 7 countries • Regulator’s or state’s approval required in 3 countries • 1 country has clear provision in the legal framework • 3 countries are in the development process Segmentation pairs used or expected • Most popular outside mandatory one: • combined transport vs direct trains; • urban vs regional; • block train vs SWL • Almost all segment pairs are in use! • 4 countries use only 1 or 2 segments • 9 countries use 3 or more segments Regulation on mark-up level • Full IM/AB responsibilty in 8 countries • Regulator’s or state’s approval required in 3 countries • 1 country has clear provision of target revenue in the legal framework • 1 country is in the development process Market segmentation and mark-ups in freight Factors that have impact on MCB in freight: • Political relations • Market activities of other transport corridors • Cooperation among logistic chain members and internal competition • Transportation time and other competitiveness factors • Industries competition and world demand on transported cargo Institutions involved in rail financing (1) state state state Forwa Conse Forwa Conse Forwa Conse rder gnee rder gnee rder gnee a) b) c) state state state state state Forwa Conse Forwa Conse Forwa Conse rder gnee rder gnee rder gnee d) e) f) Institutions involved in rail financing and financing instruments (2) • Government in 6 countries • Ministries in 6 countries Has IM to meet MS maintenance requirements or to meet user needs? The progress of indicative strategy and multiannual contract EXPECTED CHANGES Multiannual contract IN PROCESS Indicative strategy IN FORCE An approach used for the incentive regulation of the costs base level? other 15% stimulation stimulation of IM of IM 39% regulation regulation other 46% Factors affecting track maintenance costs Time frame: 17:00-18:30 Presentations: • UIC documents usage in cost allocation [ProRail] • Comparative analysis of legal frame and other factors affecting TAC benchmark [LatRailNet] Discussions: • Who or what incurs costs that are not directly incurred as a result of operating the train? Implementation of the Directive 2012/34/ES and the related Regulas other transposed 8% into the national legislation, but the Schemes are transposed not in force into the yet national 38% legislation and are in force 54% TACs based on new Schemes are going to be introduced: Assets and renewals Progress of assets register Assets evaluation method current values is developed 38% in progress 46% 54% historical values 62% Renewal costs calculations: econometric marginal cost analysis forecasted depreciation costs direct allocation to track lines renewals are not included in the direct costs laid down by government depreciation multiplied by CATRIN elasticity modulations Direct costs 20% of full cost appr. 1 EUR per train-km 1,315 EUR per train kilometre 2.84 (with noise bonus EUR -0.82/km) approx. 30% for maintenance and renewal 15% of full costs 2,435 € per train kilometre Not yet known 55% of the total cost Borders of minimal access package and charging parameters product specifics gross weight train km curves number of wagons axle load type of train gross tkm ticket revenues train path specifics neto tkm speed line parameters Service facilities No common position on who is responsible for access conditions to service facilities Responsible entity IM RU OSF other Cross-border information exchange 38% 54% - 8% Cargo clearance, delivery of cargo - 92% - 8% to customers Customs clearance of freight 8% 69% - 23% transport Commercial examination of wagons 23% 69% - - Train designation 23% 62% 8% - Assembling or disassembling of Almost all agree that charging of trains 8% 69% 15% - service facilities owned or managed by Transferring of rolling stock for loading/ unloading or to the related - 85% 8% - IM is responsibility of IM or ChB sidings Wagons maintenance and renewal - 77% 23% - Wagons preparation for loading - 85% 15% - Other issues No common position on reasonable Collection of charges is mostly profit calculations or no profit responsible to IM, some calculations at all exceptions in case of ChB Almost all have contractual agreements No common practice on RMMS between IM and RU conduction: Regulatory body, Ministries, IM, RUs and unknown persons J Logistics for the evening Start from lobby 18:45! Other topics and conclusions of CHRISTINE XI Time frame: 9:30-11:40 Presentations: • German TAC system and experience with the regulatory body [DB-Netz] • Network area [LatRailNet] • Next venue Discussions: • Information exchange among CHRISTINE, PRIME and Commission [moderated by Adif] Who should be the holder of the CHRISTINE website? Opinions on administrative rights are divided equally: only one administrator vs each country has rights! volunteer for several years don't support the idea at all other 25% LatRailNet as a successful creator J CHRISTINE community 41% Holder rights change annually with hosting organization 17% CHRISTINE most countries agree to share expenses: non-profit organization in easy way and not expensive 17% Restrictions benchmarking objects are sensible depending on the source and content not relating to TAC-issues joining organizations is a complex process can only publish on internet information that is already published Voting on name and structure christinegroup (christine-group) 6 votes 6 countries gave one vote per different name No common position on extension Brief well structured participant's profile and TAC system description Both topical & chronological CHRISTINE meetings’ material storage; topical storage of external publications on the TAC issue No forum and galleries simple and practical common platform to share and store information Conclusion holder a community → christinegroup.notcom → fees on voluntary basis → one administrator volunteer per webpage + possible to post announces for registered users → simple structure States participants CHRISTINE Current mailing list TAC related Participants posts as •Common structure meetings •State information a main page •Brief legal position •Chronological order •Company •Topical order (indexed •No storage •Link to TAC, network •Links to .ppt and •Names by participants) •RSS or subscription if statement and other minutes protected if •Mails •Scientific publications necessary relevant documents necessary •Possibility to send and deliveries •Next venue (non common e-mail •Legal documents editable or link) •.ppt of CHRISTINE and other working groups or conferences CHRISTINE & PRIME Time frame: 12:00 – 14:00 Presentations: • Presentation of Estonian railway and Charging scheme [TJA] • Presentation of Lithuanian railway and Charging scheme [LG] • Presentation of Serbian railway and Charging scheme [DR] Discussions: • Does common rules means endogenous results? Deliveries of CHRISTINE to PRIME and Commission Thank you for your attention! for more info visit www.lrn.lv/christine LATVIAN RAILWAY GROUP OF COMPANIES 20.09.2017 Two infrastructure spaces 2 Latvian Railway Group 3 Latvian Railway at a glance 4 Freight Transportation Volumes (million tons) 5 Passenger Transportation (million people) 6 Awards and Rankings 7 Industry Impact on the Economy 8 Latvian railway map 9 Major Investments (EU 2007-2013) 10 Projects: 2014 - 2020 Railway network electrification (stage I) Modernisation of Section Sarkandaugava – Mangali – Ziemelblazma in Riga Railway Network Reconstruction of Daugavpils Marshalling Yard Construction of Daugavpils Reception Yard and Access Lines Implementation of Railway Traffic Operation and Control Center Modernization of Railway Passenger Service Infrastructure 11 Latvian Railway Electrification – 1st stage Electrification of railway lines Daugavpils, Rezekne – Krustpils; Krustpils – Riga 12 Three more infrastructure development projects in Riga and Daugavpils 13 Integration in Global Logistics Networks 14 THANK YOU! 15 Track Access Charges 2018 Results of international benchmark by ÖBB-Infrastruktur AG Katja Skodacsek Network Access Regulation Management 28th September 2017 Which Infrastructure Managers and Allocation bodies were analysed? 2018 Preliminary remark: This benchmark is based on published Network Statements and additional information provided by infrastructure Estonia managers until September 25, Russia 2017. Latvia As this benchmark has not been Ireland verified by all infrastructure Lithuania managers yet, it is still a draft. Belarus Ukraine Moldavia Romania BIH Serbia Monte- Bulgaria negro Kosovo analysed Macedonia Albania not reviewed Greece Turkey charges 2018 not published yet Modification of charging structure in 2018 (minimum access package)? 2018 Modification *) new charging structure has been implemented 2017 no modification no modification in structure, but Estonia in price level Russia charges 2018 not published yet Latvia Ireland not reviewed Lithuania Belarus Ukraine Moldavia Romania BIH Serbia Monte- Bulgaria negro Kosovo Macedonia Albania Turkey *) ÖBB-Infrastruktur AG: Greece due to an appeal new charging structure not yet in force Implementation RECAST/CIR up to 2018? direct costs/mark ups 2018 Implementation RECAST/CIR in Network Statement 2018 Switzerland has not implemented the CIR 2015/909 into national law Estonia through the land transport Russia agreement. However, the Latvia regulations of the CIR are applied Ireland in wide parts of the national Lithuania legislations of the track access charges. Belarus Remarks: Ukraine France: scheduled TAC 2018 have not been approved by the French Moldavia regulatory body. The TAC reform has been postponed to 2019. Romania Spain: new charging structure has BIH Serbia been implemented 2017 Monte- Bulgaria negro Kosovo Lithuania: RECAST has been Macedonia implemented, CIR methodology is Albania prepared, with a request of phasing-in Greece Turkey ÖBB-Infrastruktur AG: due to an appeal new charging structure not yet in force Market segments 2018 passenger PSO freight TOTAL non-PSO long distance regional due to an appeal new charging structure not yet in force 1 1 2 2 6 1 1 1 3 6 2 7 5 20 16 (by regional 5 5 26 authority) 1 4 5 1 4 5 12 (by regional scheduled TAC 2018 have not been approved by the French regulatory body. 2 + 17 (high speed) ? ? The TAC reform has been postponed to 2019. authority) 3 1 1 5 2 2 (+ segmented by 4+ carried cargo type) excl. empty runs and loco trains Market segments: commercial passenger traffic (without PSO) (referred to RECAST/CIR) commercial passenger traffic open access (international) open access (national premium): HSL open access (national premium): not HSL on conventinal lines (day/night) scheduled 2019 o on high speed lines (17 market segments per origin / destination) excl. empty runs and loco trains Market segments: long distance passenger traffic (referred to RECAST/CIR) long-distance passenger traffic in general Metro Day (amount of charge depends on speed, time criterion) Basic (no run between metropolitan stations/or high volume border points, time) Night service (run between 11pm and 6am) add-on Express (very high priority) Charte-/Nostalgia service Point-to-point services (time and speed criterion) Long distance services on variable gauge provided that at least 10% of ist total route runs on Iberian gauge lines Long distance services over long tansersal sections: routes longer than 700 km with no origin, destination or intermediate stop in Madrid or its branches other long distance services (excluding locos, empty trains) transit/non transit excl. empty runs and loco trains Market segments: regional passenger traffic (referred to RECAST/CIR) short distance traffic high (seats >200, metropoltian area, time criterion) short distance traffic low hub node sprint (≥ 75 km/h, metropolitan area, hub stations) hub node (< 75 km/h, metropolitan area, hub stations) add-on Holy (operation on sundays and holidays) ring node (metropolitan area, no hub station) no node federal state (load runs/empty runs) PSO, urban and suburban services (entirely on a commuter hub), intercity services (routes < 300 km) by regional authority (12 market segments) scheduled 2019 Market segments: freight traffic (referred to RECAST/CIR) freight traffic (general) single wagon load traffic freight traffic manipulated combined traffic freight traffic non-manipulated block trains corridor freight train night (predominatly an night) international freight service (predominately day) national freight service TOP (predominately day, distance <100 km and ≥800 km) national freight service BASE (predominately day, distance ≥100 km and <800 km) very heavy train (>3.000 tonnes) dangerous goods block-trains add-on planning characteristic (Z-Flex, R-Flex) Local freight train for dangerous goods (≤ 75km on a train path, max rake 370m, ≤3000t) add-on operational characteristic (express, fast) local freight trains (≤ 75km on a train path, max rake 370m, ≤3000 t) standard transit/non transit (segmented by cargo type) excl. empty runs and loco trains Price per train km 2018 (incl. catenary): freight - wagon load transport 1000 tons Remarks: excl. empty runs and loco trains average TAC: whole network and volume-weighted based on all lines/segments SBB incl. noise bonus -0,89 € > 9 € in average 11,08 9,77 Price per train km 2018 (incl. catenary): freight - block trains 1000 tons Remarks: excl. empty runs and loco trains average TAC: whole network and volume-weighted based on all lines/segments SBB: incl. noise bonus -0,89 € remark: >9 € in average 11,08 9,77 Price per train km 2018 (incl. catenary): freight - intermodal trains 1000 tons Remarks: excl. empty runs and loco trains average TAC: whole network and volume-weighted based on all lines/segments SBB: incl. noise bonus -0,89 € Price per train km 2018 (incl. catenary): passenger long distance trains 500 tons (high speed) Remarks: excl. empty runs and loco trains average TAC: whole network and volume-weighted based on all lines/segments Price per train km 2018 (incl. catenary): passenger long distance trains 500 tons (<160 km/h) Remarks: excl. empty runs and loco trains average TAC: whole network and volume-weighted based on all lines/segments Price per train km 2018 (incl. catenary): regional passenger trains 250 tons Remarks: excl. empty runs and loco trains average TAC: whole network and volume-weighted based on all lines/segments Price per train km 2018 (incl. catenary): urban passenger trains 250 tons Remarks: excl. empty runs and loco trains average TAC: whole network and volume-weighted based on all lines/segments Changes in Croatian Track access charging system HŽ Infrastruktura Network access Dino Džafo Minimum Access Package Charges formula (as it was) Minimum Access Package Charges formula (as it was) Minimum Access Package Charges formula (as it was) Train type is given by a train path equivalent (5 categories for passenger transport, 4 for freight transport and 1 for locomotive trains) additional charges for train mass (over 1500 tonnes) and the use of tilting technique Minimum Access Package Charges formula (as it was) Line is set by a technical line parameter, line operation equivalent and line parameter costs equivalent (in total 6 line categories) final value is set as a sum of individual line parameters multiplied by their train path length Minimum Access Package Charges formula (as it was) Basic price is determined on the basis of direct costs (for maintenance and traffic management on railway infrastructure) different prices for passenger and freight transport Minimum Access Package Charges formula (as it was) Traction el. is given by direct costs (for electrical supply equipment maintenance charge and realized train path kilometers with el. traction) Minimum Access Package Charges formula (as it was) Price amounts to K = 1 when calculated in the amount of direct costs, but correction Government may determine a lower correction coefficient coefficient (depending on the situation of the transport market) T – Train path equivalent (as it was) in passenger transport – is determined on the basis of the train mass by correlating the average train mass of an individual grouping with the average mass of all trains in passenger transport and on the basis of train category. Equivqalent is increased regarding of train category: 20% for EuroCity, InterCity, express and agency trains 15% for fast and semi-fast trains 10% for passenger and cross-border trains T – Train path equivalent (as it was) in freight transport – is determined on the basis of the train mass by correlating the average train mass of an individual grouping with the average mass of all trains in freight transport. T – Train path equivalent (as it was) Additional charge for train mass [dm] - is applied on all types of trains in freight transport whose mass is greater than 1500 tons and amounts to 0.30. Additional charge for the use of tilting technique [dn] – is applied on all trains in passenger transport which use tilting technique and amounts to 0.20. L – Line parameter (as it was) Lines grouped in 6 categories based on traffic and technological aspect. L – Line parameter (as it was) Line cost equivalent - unit cost of infrastructure for each line Line operation equivalent - 2 components (realized train kilometers and achieved gross tonne-kilometers) Technical line parameter - type of lines (share of double track lines in all lines) - slope streaks (share of lines with more then 10 promils) - speed of lines (100 km/h) - electrification - allowed load (less than 2ot per axis) Train type & Line parameter (changes & adjustments) - traveled distance is added to train mass - correlating average gross tonne kilometer of an individual grouping with the average gross tonne kilometer of all trains (separately in freight and passenger transport) - use of total train mass cvlkm – Basic price per train kilometer (as it was) Determined on the basis of direct costs for the maintenance of railway infrastructure and traffic management on railway infrastructure and realized train kilometers. Prices are expressed separately for passenger and for freight transport. cvlkm – Basic price per train kilometer (as it was) Direct Determinated: costs Initially - 10% of Train Control (Rail operation) and 100% of Use of Running Track Points and Junctions (Rail operability) Later on - 100% of Rail operation and 20% of Rail operability cvlkm – Basic price per train kilometer (changes & adjustments) Direct EU Regulation 2015/909 costs include only costs that are triggered directly by the operation of the train service use of eligible costs 3 year average K - Price correction coefficient (as it was) Price correction coefficient [K] – amounts to K=1 when the charges are calculated in the amount of direct costs. The infrastructure owner (Government), depending on the state of the transport market, may determine a lower correction coefficient. K - Price correction coefficient (changes & adjustments) compliant with national legislation, but could go against the general EU goals and principles of railway infrastructure charging new approach to the direct cost calculation use of share of eligible costs canceled in line with EU and national legal framework Minimum Access Package Charges formula (new) S – Coefficient for the single wagon load train consultant’s proposal Implemented for stimulation of RU`s for transportation single wagon loads is applied to all types of freight single wagon load trains and amounts 0,8 S – Coefficient for the single wagon load train Description increase of a rail freight transport competitiveness by means of transport of and little amount of goods (transported by a few wagons) advantages prevention of a migration of significant part of rail freight transport to roads and better track utilization straighten up the competitive position of railway transport compared to road transport. Additional proposals from consultants company & future interventions empty containers a train carrying only empty containers is considered as train with empty wagons (lower value of train path equivalent) support of new transports incentive for trains equipped with ETCS According to the Directive 2012/34/EU, infrastructure managers should modify the charging system through a temporary differentiation for trains equipped with ETCS (in order to accelerate the installation of the European Train Control System on board locomotives). Thank you for your attention! [email protected] Schweizerische Eidgenossenschaft Federal Department of the Environment, Confédération suisse Transport, Energy and Communications Confederazione Svizzera Confederaziun svizra Federal Office of Transport Noise Differentiated TAC in Switzerland 20.09.2017 Kjell Kolden Federal Office of Transport, Kjell Kolden 20.09.2017, CHRISTINE XI, Riga 1 Topics • Swiss legal requirements • Noise bonus since 2002 • Evolution in numbers • International cooperation • Conclusions Federal Office of Transport, Kjell Kolden 2 20.09.2017, CHRISTINE XI, Riga Noise bonus – legal requirements Federal noise abatement law (BGLE Art. 5) Ø Silent railway vehicles will be given preferential treatment with respect to the track access charges. Federal Office of Transport, Kjell Kolden 3 20.09.2017, CHRISTINE XI, Riga Noise bonus – evolution since 2002 2002: CHF 0.005/axle km 2004: CHF 0.01/axle km 2013: only freight trains - differentiated: 0.01 CHF/axle km K LL 0.02 CHF/axle km D 0.03 CHF/axle km 2020: Cast-iron brakes banned -> bonus quo vadis? Federal Office of Transport, Kjell Kolden 4 20.09.2017, CHRISTINE XI, Riga Noise bonus – evolution in numbers Millions CHF 35 30 25 20 15 10 5 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Federal Office of Transport, Kjell Kolden 5 20.09.2017, CHRISTINE XI, Riga Noise bonus – internat. cooperation Originally NL-DE-CH (Corr. 1); new: AT (ÖBB) • Single Entry Point (SEP) Ø facilitate applications Ø enhance retrofitting Federal Office of Transport, Kjell Kolden 6 20.09.2017, CHRISTINE XI, Riga Noise bonus – internat. cooperation Database SWDB (100’000 silent wagons) Federal Office of Transport, Kjell Kolden 7 20.09.2017, CHRISTINE XI, Riga Conclusions – do you approve? From our perspective (FOT)… • Financial incentives work! • Cross-border cooperation improves the situation • Less resources needed thanks to automatization… • …but data quality is crucial • Cooperation with wagon holders/owners = win-win Federal Office of Transport, Kjell Kolden 8 20.09.2017, CHRISTINE XI, Riga Ramsey Pricing / Elasticities Survey among CHRISTINE members by ÖBB-Infrastruktur AG, Network Access August 2017 Elasticities & Ramsey Elasticity: how responsive an economic variable is to a change of another? E.g. train path charge in a given market segment is increased à this may lead to higher tarifs for end customers à therefore to a decrease of demand Ramsey is a method, which uses a pricing inverse to the elasticity of the demand. What parameters are needed? § elasticities § cost structure: percentage TAC of total costs of Railway Undertaking Goal: to spread a given total revenue over market segments according to „what the market can bear“ Questions sent by email July 11, 2017 Questions § Do you apply Ramsey pricing in your charging system? § If you apply Ramsey pricing for determining TAC: Which price elasticities are your market segments for 2018 (and for 2019) based on? § Are you aware of any studies in Europe / your own country regarding concrete data about the price elasticities of market segments? Could you possibly forward links, studies or extracts of studies concerning elasticity values? Answer received Estonia Russia Latvia Ireland Lithuania Belarus Ukraine Moldavia Romania BIH Serbia Monte- Bulgaria negro Kosovo Macedonia Albania received Greece Turkey not received Principles for TAC 2018 Based on Ramsey and price elasticities Price elasticities with Ramsey in use planned Price elasticities without Ramsey in use planned Finland no elasticities Norway not reviewed Sweden Estonia Russia Latvia Ireland Denmark No elasticities planned or implemented United Lithuania Kingdom Belarus New elasticities model is planned | Ramsey will not be used Netherlands Germany Poland Belgium No elasticities planned or implemented Luxemburg Czech Ukraine Republic Slovakia New elasticities model is planned | Ramsey will be used France Switzerland Austria Moldavia Hungary Slovenia Romania No elasticities planned or implemented Croatia BIH Serbia Portugal New elasticities model is planned | Ramsey will not be used Spain Italy Monte- Bulgaria negro Kosovo Macedonia Elasticities are implemented without Ramsey Albania Greece Turkey Elasticities are implemented with Ramsey Elasticities are implemented with Ramsey (due to an appeal not yet in force) UIC leaflets in charge setting Christine meeting 20 September 2017 Julianne Wormsbecher, ProRail 1 Question Do you use UIC documents (e.g. 714 or 715) in your cost allocation or charge calculation? If so, could you shortly explain which information you use and how you use this? Answer: No Answers from: Trafikverket, PLK, Adif, SŽDC, Infrabel, LatRailNet, SNCF Réseau, Infraestruturas de Portugal, HŽ Infrastructura, Banedanmark 2 UIC leaflets 714 / 715 • Track classification • Relation between maintenance costs and traffic load UIC group Theoretical traffic load (Tf) Cost index (min / max) 1 130.000 < Tf 130 / 150 2 80.000 < Tf < 130.000 120 / 130 3 40.000 < Tf < 80.000 105 / 120 4 20.000 < Tf < 40.000 90 / 105 5 5.000 < Tf < 20.000 65 / 90 6 < Tf < 5.000 40 /65 3 Simplified / schematic illustrations Application by ProRail 1. Determining direct costs 2. Setting charge ratio Cost index Costs Direct costs 1,25 1,58 etc. 1 Fixed costs 0-120t 121-160t 161-320t Theoretical traffic load Weight category Trainpath 2018 ratio charge 0-120 ton 1 € 0,8537 121-160 ton 1,25 € 1,0682 161-320 ton 1,58 € 1,3531 321-600 ton 2,21 € 1,8906 601-1.600 ton 3,55 € 3,0277 1.601-3.000 ton 4,27 € 3,6455 > 3.000 ton 4,63 € 3,9545 4 Discussion Do you use train related charge categories for further differentiation of TAC, e.g. weight classes, or speed intervals, or …? Is this differentiation fully cost related? If so, how do you determine the charges per charge category? By using empirical models? By using experts opinions? …? 5 Appendix: Charging Parameters – IM’s TAC 2016 Source: PRIME-ENRRB Charging workshop, 3 February 2017 6 Track Access Charges DB Netz CHRISTINE Meeting, Riga, September 21th 2017 DB Netz AG | I.NMK2 (T) | Matthias Fett Concept of TAC 2018 discussed with market and applied – TAC appoved by german regulatory body with adjustments December November June October 6. February December 2012 2014 2015 2016 2017 2017 Directive Kick-Off Conclusion Public consultation Final decision by Implementation 2012/34/ EU Consultation with consultation & at regulatory body TAC 2018 market communication regulatory advanced concept to body market 1 Concept n Based on EU and german legislation development of a new infrastructure charging concept and discussion with german regulatory body 2 Communication n Check concept for market compatibility and testing the concept 3 Implementation n Implementation of the final concept after the approval of the german regulatory body on December 2017 2 DB Netz AG | I.NMK2 (T) | 21.09.2017 EU Directive 2012/34 defines common principles for infrastructure charges Basic logic according to EU Directive 2012/34 Basic elements Costs directly incurred as a result of operating the train service (marginal costs) Costs directly incurred n Each customer has to bear the costs which he directly causes as a result of operating the train service Mark-up to cover full costs according to the ability to pay of the market segment n Remaining costs are divided among all users to maximise market demand Mark-up to cover full costs n The level of the mark-up it is based on the ability to pay of the market according to the ability to pay of segment and shall not exclude the use of infrastructure by market segments the market segment n Necessary to secure sufficient funds to finance the infrastructure Further elements (incentive components of behaviour control) Further elements n Additional charges defined by the law reflecting e.g. the costs of environmental effects, scarcity of capacity, investments… 3 DB Netz AG | I.NMK2 (T) | 21.09.2017 Segmentation of freight traffic is based on the NEW characteristic of the traffic Does not depend on the number of Loco train locomotives Advance performance of a load drive Conventional train Very heavy train No local train, train without dangerous Train weight > 3.000 t goods, no heavy train Local freight train Train journey shorter than 75km Dangerous goods train AND train shorter than 370 m Train carrying only dangerous Local dangerous goods train goods Train journey shorter than 75km AND train shorter than 370 m AND train carrying only dangerous goods 4 DB Netz AG | I.NMK2 (T) | 21.09.2017 Freight traffic charges NEW TAC 2018 – Charges [Euro/Trainkilometer] Optional Optional Segment Segment Direct costs Direct costs Charges Charges Z-Flex11 Z-Flex R-Flex11 R-Flex Fast11 Fast Express11 Express Conventional train train 1,315 2,83 2,83 -0,10 -0,10 +0,50 +2,00 Conventional 1,315 (2,98) (2,98) -0,10 -0,10 +0,50 +2,00 Very heavy heavy train train 2,337 4,05 4,05 -0,10 -0,10 Very 2,337 (4,00) -0,10 -0,10 // // (4,00) Dangerous goods goods 1,315 3,46 3,46 -0,10 -0,10 +0,50 +2,00 Dangerous 1,315 (3,40) (3,40) -0,10 -0,10 +0,50 +2,00 Local freight freight 0,818 1,67 1,67 -0,10 -0,10 +0,50 +2,00 Local 0,818 (1,64) (1,64) -0,10 -0,10 +0,50 +2,00 Local dangerous Local dangerous goods goods 0,818 0,818 1,88 1,88 -0,10 -0,10 -0,10 -0,10 +0,50 +0,50 +2,00 +2,00 train train Locomotive run run 0,627 1,67 1,67 Locomotive 0,627 (1,64) // // // // (1,64) 1Surcharge or discount 5 DB Netz AG | I.NMK2 (T) | 21.09.2017 Segments in long-distance passenger traffic are based on Unmodified three segmentation criteria 6 am – 8 pm* 8 pm- 11 pm** 11 pm – 6 am Train connects Metro Day*** Basic Night metropolitan railway stations Train does not Basic connect metropolitan railway stations Empty Run Charter-/Nostalgia Point-to-Point Further segments * 9 am to 8 pm at week-ends ** 6 am to 9 pm at week-ends *** btw. 100 km/h and 160 km/h charges are based on average speed 6 DB Netz AG | I.NMK2 (T) | 21.09.2017 Long-distance passenger traffic charges NEW TAC 2018 – Charges [Euro/Trainkilometer] Optional Segment Direct Costs Charges Express** Metro Day 11,63 1,145 +2,00 >160* 11,31 Metro Day 5,07 1,145 +2,00 <100* 4,95 Basic 1,145 4,51 +2,00 4,41 Night 1,145 2,51 +2,00 2,46 Charter / 2,05 0,666 / Nostalgia 2,46 Point-to-Point 1,145 4,08 / 3,99 Empty run 0,627 2,05 +2,00 2,46 7 DB Netz AG | I.NMK2 (T) | 21.09.2017 Segments in local/suburban passenger transport had to be adapted to new national legislation – states as market segments Requirements § 37 ERegG Adaptation of the local passenger transport concept n States as market segments in local passenger n Dismissal of the former segmentation based on passenger transport throughput of train stations and travelling time within the market segment local passenger transport n Average charges for local passenger transport for every state have to euqal the average n New: One market segment per state charges of the corresponding traffics in the respective states in Timetable Period 2016/2017 n Determination of average charges per state according to legal requirements of § 37 ERegG n Outlook: Average charges per state in this market segment will rise by 1,8% p.a., starting in Timetable Period 2017/2018 old: new: 8 DB Netz AG | I.NMK2 (T) | 21.09.2017 In local passenger traffic each federal state forms ist NEW own market segment for load and empty run SPNV Baden-Württemberg Hessen Sachsen Baden-Württemberg Hessen Sachsen Lastfahrt Lastfahrt Lastfahrt Leerfahrt Leerfahrt Leerfahrt Mecklenburg- Mecklenburg- Bayern Sachsen-Anhalt Bayern Sachsen-Anhalt Vorpommern Vorpommern Lastfahrt Lastfahrt Leerfahrt Leerfahrt Lastfahrt Leerfahrt Berlin Niedersachsen Schleswig-Holstein Berlin Niedersachsen Schleswig-Holstein Lastfahrt Lastfahrt Lastfahrt Leerfahrt Leerfahrt Leerfahrt Nordrhein- Nordrhein- Brandenburg Thüringen Brandenburg Thüringen Westfalen Westfalen Lastfahrt Lastfahrt Leerfahrt Leerfahrt Lastfahrt Leerfahrt Bremen Rheinland-Pfalz Bremen Rheinland-Pfalz Leerfahrt Lastfahrt Lastfahrt Leerfahrt Leerfahrt Hamburg Saarland Hamburg Saarland Lastfahrt Lastfahrt Leerfahrt Leerfahrt 9 DB Netz AG | I.NMK2 (T) | 21.09.2017 Local/suburban passenger transport charges NEW TAC 2018 – Charges [Euro/Trainkilometer] Load Load Empty run Empty run State Direct costs run State Direct costs run 2018 2018 2018 2018 BW 5,112 NI 5,189 0,666 2,990 0,666 3,375 5,141 5,196 BY 4,983 NRW 4,970 0,666 3,151 0,666 3,340 5,014 5,015 BE 5,413 RP 5,155 0,666 3,290 0,666 3,141 5,419 5,162 BB 5,531 SL 5,279 0,666 3,456 0,666 3,194 5,552 5,272 HB 5,439 SN 5,219 0,666 3,520 0,666 3,199 5,446 5,213 HH 4,778 ST 5,187 0,666 2,884 0,666 3,115 4,776 5,217 HE 4,864 SH 5,285 0,666 2,954 0,666 3,225 4,875 5,288 MV 5,406 TH 5,226 0,666 3,265 0,666 3,180 5,414 5,241 All sates Direct costs Charges 2018 Lok-/ Leerfahrt 0,627 2,46 10 DB Netz AG | I.NMK2 (T) | 21.09.2017 Current issues 11 DB Netz AG | I.NMK2 (T) | 21.09.2017 The regulatory body specified the guidelines of the National Railway Act to implement the new price cap regulation Calculation of the price cap in four steps: 1) Base Year: identification of average costs and traffic volumes prior to the control period – The average is formed by up to 5 past and concluded business years – DB Netz then identifies the average costs and traffic volumes of these years and the BNetzA checks them 2) AGK: update of base year costs to the starting level of overall costs – Base year costs are udated to account for developements during the time lag between the base year and the beginning of the control period, e.g. increasing costs for workforce or quailty requirements – DB Netz indentifies the updated costs, which are then again checked by the regulatory body 3) OGK: update of the starting level of overall costs to yearly cost caps – The yearly cost cap accounts for general inflation via an inflation rate and sets an incentive for the track access manager via a productivity rate 4) Price Cap: division of the yearly cost cap by the base year traffic volume = yearly price cap inflation rate - productivity rate 2014 2015 2016 Base Year AGK OGK OGK … OGK 2019 2020 2023 12 DB Netz AG | I.NMK2 (T) | 21.09.2017 Thank you for your attention PRIME Platform of Rail Infrastructure Managers in Europe General Presentation April 2017 1 Main features  Aims to fulfil the role of the European Network of Infrastructure Managers as foreseen in Article 7f of Directive (EU) 2016/2370  The only platform allowing direct exchange between IMs and the EC, and co-chaired by both  Allowing discussion of legislative initiatives at a very early stage  Allowing all IMs to cooperate and establish common priorities  Comprehensive scope encompasses all strategic (regulatory, operational and financial) aspects relevant for IMs Added value  ‘Influencing’ function: industry able to affect draft legislation  ‘Early warning’ function: EC to industry and industry to EC  ‘Stress-test’ function: EC to test legislative proposals re their ‘implementability‘  ‘Learning’ function: EC and IM to improve mutual understanding of respective ‘business’  ‘Business’ function: Facilitating benchmarking on best practice to enhance IMs business capabilities 2 The Evolution of PRIME – timeline September 2013 October 2013 January 2014 March 2014 June 2016 Today EC proposes First IMs to sign First PRIME meeting, Subgroups on Key 26 participants, 30 participants, Declaration of the Declaration of working arrangements Performance Indicators 5 subgroups, 5 subgroups, 2 Intent to all IMs to Intent approved and Implementing Acts cooperation with cooperation platforms, set up PRIME created regulators preparing for the European ad hoc security group, Network of rail IMs PRIME PRIME PRIME PRIME 3 Members As of 1 January 2017, PRIME has the following signatories: EU IMs Associations European Commission 1. Adif, ES 13. LISEA, FR 1. CER 2. Banedanmark, DK 14. Lietuvos geležinkeliai, LT 2. EIM 3. BLS Netz AG, CH 15. Network Rail, UK 3. RNE 4. CFR, RO 16. ÖBB Infrastruktur AG, AT 4. VDV 5. DB Netz AG, DE 17. Øresundsbro Konsortiet, DK 6. Eurotunnel, FR/UK 18. PKP PLK, PL 7. FTA, FI 19. ProRail, NL 8. GYSEV, AT/HU 20. RFI, IT 9. Highspeed1, UK 21. SBB, CH 10. Iarnród Éireann – Irish Rail, IE 22. SNCF Réseau, FR 11. Infrabel, BE 23. Trafikverket, SE 12. IP S.A, PT 24. Trasse Schweiz AG, CH 13. Jernbaneverket, NO 25. VPE, HU 4 Plenary meetings (2015 – 2017) 5th February 3rd June 19th November 2015 PRIME, PRIME, PRIME, 5th Meeting 6th Meeting 7th Meeting Brussels, BE Warsaw, PL Brussels, BE 3rd June 17 November 2016 PRIME, PRIME, 8th Meeting 9th Meeting Westwood, UK Brussels, BE 12 June 16 November (tbc) 2017 PRIME, PRIME, 10th Meeting 11th Meeting Sopron, HU Brussels, BE 5 Priorities in 2017 Work in subgroups: Cooperation platforms: • Twinning programme • Pilot projects for innovative financing ENRRB (regulators) Safety Culture • Testing methods for • Dialogue with / Occurrence developing and Financing investors monitoring safety • Benchmark on RU Dialogue reporting culture financing the maintenance works • Building information Strategic discussions: model • Consultation on • Simulation and legislative work PRIME 10 – Environmental performance Digitalisation optimisation Implementing • Input to EC of railways • Big data acts PRIME 11 – Rail in multimodal context • E-catalogue of projects • Testing approach Ad hoc topics: • Collecting data Performance • First test report Development of rail infrastructure Benchmarking • Cooperation with ERMTS regulators and RUs Security 6 Governance (as of 1 January 2017) Signatories: EC, all IMs and associations Plenary Co-Chairmenship Mandate of industry co-chair unitl June 2017 & Matthew Baldwin EC DG MOVE, Alain Quinet Deputy Director General SNCF Réseau (FR) Deputy Director General Subgroups and IMs in lead Cooperation Platforms and IMs in lead KPI / Benchmarking Trafikverket (SE) Safety Culture Network Rail (UK) (next - ProRail (NL)) PRIME and ENRBB PKP-PLK (PL) Implementing Acts RFI (IT) PRIME and RU Dialogue TBC Financing EC DG MOVE / SNCF Réseau (FR) Digital Railways Network Rail (UK) 7 Outlook ► PRIME prepares for becoming a formal European Network of Infrastructure Managers as foreseen in the 4th Railway Pakcage and all main IMs are expected to join ► PRIME will make recommendations to DG MOVE supporting the development of EU rail legislation ► PRIME will work closely with the European Commission on IM related topics for the development of the European rail system ► PRIME members will held targeted strategic discussions, cooperate on priorities and exchange best practices for IMs becoming more efficient, innovative and responsive to customer needs 8 PRIME key events 2013-2016 1st signing ceremony 2nd signing ceremony PRIME plenary meeting Host: European Commission Host: EIM Host: ADIF Tallinn, October 2013 Brussels, November 2014 Madrid, October 2014 PRIME plenary meeting PRIME plenary meeting PRIME plenary meeting Host: Network Rail Host: PKP-PLK Host: European Commission Westwood Coventry, June 2016 Warsaw, June 2015 Brussels, November 2015 9 Additional information  Legal status of PRIME: registered expert group of the EC (http://ec.europa.eu/transparency/regexpert/index.cfm?do=groupDetail.groupDetail&groupID=2983)  Legal document of PRIME: Declaration of Intent (https://webgate.ec.europa.eu/multisite/primeinfrastructure/en/about-prime/description)  Contacts: Alain Quinet Matthew Baldwin Industry co-chair of PRIME EC co-chair of PRIME Contact via Paul Mazataud Contact via Annika Kroon e-mail: [email protected] [email protected]  PRIME Website : https://webgate.ec.europa.eu/multisite/primeinfrastructure/prime-news_en 10 Public Railway in Estonia 2017 Network overview – Heigo Saare Charging Methodology – Taavi Laja Contents l Railway Infrastructure and market in Estonia l Legal framework and implementing of new charging methodology l Charging principles l Proposed model l Discussion / questions OSJD RULES Dynamics of passenger and freight trains 2004-2016 4,50 25000 4,00 20000 3,50 3,00 15000 2,50 million 2,00 10000 1,50 1,00 5000 0,50 0,00 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Passenger train (train/km) Freight train (grosstonne/km) Legal framework and implementing of new charging methodology Changes in Railway Law – requirements of EU 2012/34 Establishing the charging scheme and framewrok by TJA charging principles (incl. model, prices, units, segments,mark-ups..) April 2016 September 2016 – June 2017 New metohodology Act by Ministry of Implementing new Economics and communications (incl. EU charging methodoloy 2015/909 Direct Cost calculation) December 2017 August 2016 Infrastructure charging system • Deducting the non-eligible from the full costs according to EU 2015/909 (appr. 20% of full costs) • Including main tracks only • Cost structure based on cost drivers (weight related costs and general infrastructure costs) • Train-km • Brutotonne-km • Mandatory level of segmentation + the freight services from and to 3rd countries Proposed model (Basic service) Direct Cost (Minimum 20-25 % All segments. Gross tonne - km / EUR Train - km / EUR 1 access According to actual + package) use Other (not 2 Passenger train related with the minimum access package) 75-80% Gross tonne - km / EUR 3 Train - km / EUR Freight train Mark-ups (based (segment nr 1) + on the specifics of the segment) 4* Freight train (segment n) Lithuanian railways Lithuanian railway network Latvia Klaipėda 1520 mm gauge railway lines 1761 km Russia 1435 mm gauge railway line Vilnius (Kaliningrad Kaunas 115 km region) Electrified sections Belarus 149 km Poland The main freight terminals The main stakeholders of LT railway transport sector Railway market regulator • The Communications Regulatory Authority (from 11/2016) (till 11/2016 the Competition Council) Charging & capacity allocation body • The State Railway Inspectorate (09/2017 SRI incorporated into the State Road Transport Inspectorate) Railway infrastructure manager • JSC „Lithuanian Railways“ Railway infrastructure directorate Railway undertakings • JSC „Lithuanian Railways“ Freight transportation directorate • JSC „Lithuanian Railways“ Passenger transportation directorate • Companies operating in marshaling yards and sidings (more than 20 companies) Dominating freight transportation 2016 Freight – 48 mill. t Passengers – 4.4 mill. Train kilometers Gross tone-kilometers 4,6% 42,3% 57 95 ,7% ,4% Freight trains Passenger trains Freight trains Passenger trains Transit from/to 3rd countries Proportions of rail freight turnover (2016, tone kilometers) 38,7% 45 ,8% 15,5% Transit through Klaipeda sea port Transit to/from Kaliningrad region Other freight (domestic/import/export) Oil and fertilizers – dominating freight Proportions of freight transported by rail 2%(2016, tones) 6% 4% 6% 30% 10% 30% 12% Oil Fertilizers Food, grain Mineral products Metals Coal Wood Other Modal share Freight transportation in Lithuanian territory – 66% by rail Source: EUROSTAT – Statistics Explained (2015) http://ec.europa.eu/eurostat/statistics-explained/ Public financing is close to zero Financial architecture of Estimated subsidies 2015 (million EUR) the Lithuanian Railways Infrastructure & PSO & pensions Total other aid Financing of • Almost all costs (losses) of AT -Austria 786 2006 2792 BE-Belgium 1122 1866 2988 passenger passenger transportation are BG-Bulgaria 100 84 184 transportation covered by carrier (state subsidy CZ - Czech Rep 516 0 516 <1% of costs) DE-Germany DK-Denmark 5131 4585 9716 625 3 628 • Acquisition of all new passenger EE-Estonia 15 27 42 ES-Spain 619 73 692 rolling stock is financed by carrier FI-Finland 106 0 106 only FR- France 8696 3556 12252 EL-Greece 50 333 383 Financing of • 100% of infrastructure operational HR-Croatia 69 563 632 HU-Hungary railway and renewal costs are covered by IE-Ireland 544 738 1283 98 210 308 infrastructure infrastructure charges IT-Italy 503 2421 2924 LT-Lithuania 3 1 4 • Only development of LU-Luxembourg 359 0 359 infrastructure is financed partially LV-Latvia 32 0 32 NL-Netherlands by public funds (mostly EU funds) PL-Poland -175 753 1961 591 1786 1345 PT-Portugal Other subsidies • Lithuanian railway companies do RO-Romania 18 34 52 329 211 541 for railway not receive any substantial grants SE-Sweden 411 2 413 companies for other purposes SI-Slovenia 46 0 46 SK-Slovakia 218 411 629 Dividends to the • From 2008 (except 2016) JSC UK 963 0 957 Total State budget “Lithuanian Railways" payed 21938 19677 41611 dividends to the State budget Source: DG Competition http://ec.europa.eu/competition/state_aid/scoreboard/ Charging scheme in Lithuania Railway transport code Principles on General charging charging rules procedures Charging body – Railway state inspectorate* Charge for a minimum access package must be set - sets minimum access charges on direct cost level and mark-ups’ values - calculates and sets amounts to be paid by RU Mark-ups allowed on: Infrastructure manager – JSC - passenger and cargo Lithuanian railways (Railway transit infrastructure directorate) - transportation segments - uses infrastructure charges to where market can bear carry out the functions of IM * From 09/2017 RSI is incorporated into the State Road Transport Inspectorate Charges for the minimum access package • Train traffic charge gross-tone km Direct cost • Use of the contact grid <30% level charges electric train km Until 12/2017 – capacity reservation charge; from new 2017-2018 timetable period eliminated • Passenger transit charge gross-tone tkm • Cargo transit charge tone km Mark-ups • Cargo carriage charge >70% tone-km • dangerous goods • containers, semi-trailers etc. • low-value goods • other goods Regulation 2015/909 implementation The parts related to use of traction current and access to infrastructure Network full cost is calculated connecting service facilities are subtracted. = Eligible costs Network full cost Renewal costs added + ― Unrelated costs are (depreciation of some assets Renewal Six step Unrelated subtracted (costs of multiplied by CATRIN approach costs cost providing commercial elasticity 0,1-0,95 ) services) NO renewals by EU funds. ― Unrelated part ― of maintenance Non eligible costs costs Costs that partly related to train movement Non-eligible costs are calculated (using CATRIN subtracted 0,2-0,45) Preliminary result of the new methodology – reduction of the direct costs level from ~30% to ~20% of all infrastructure costs. Thank You for attention Directorate for Railways Republic of Serbia SERBIAN RAILWAY SECTOR AND TAC SCHEME CHRISTINE meeting Jana Ćirković Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Serbian railway sector § Strategic transportation location - the easiest route of land travel from continental Europe to Asia Minor and the Near East. § The railway network of the Republic of Serbia is connected with the railway networks of eight countries: Croatia, Hungary, Romania, Bulgaria, FYR of Macedonia, Montenegro, Albania and Bosnia and Herzegovina. CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Serbian railway sector CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Serbian railway sector § The total length of railway lines – 3.809 km § Railways that are part of the Pan-European corridor, railways of the international importance which connect Serbia with neighboring countries, and local railways § About 7.5% of the whole length of the network (275 km) are double-track rail lines § 33% of the network - 1.245 km is electrified CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Serbian railway sector § Normal gauge of 1435 mm § Crossing state borders - no changes in width of gauge § Maximum designed speed is 120km/h § Museum and touristic railway "Shargan Eight", 21.7 km long, and the track width is 760 mm § In respect of the ownership and management of railway infrastructure there is only one railway network, the state network governed by “Infrastruktura Zeleznice Srbije” CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Corridor X § The most important part of the railway network - Corridor X (Salzburg - Ljubljana - Zagreb -) Sid- Belgrade - Nis - Presevo (- Skopje - Veles -Solun) with branches over Subotica (Corridor Xb) on the Hungarian border and Dimitrovgrad on the Bulgarian border (Corridor Xc) § Total length through Serbia - 875 km § Only 20% of the total railway network across Serbia § 50% of total rail transport is operated alongside this route CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Gradual opening of the market 3 stages: § The first phase will contribute to the national competition on Serbian railways § The second phase will contribute to the regional competition in the SEETO area § The third phase will contribute to the opening towards the EU when the international operators can be expected on the national lines on the basis of reciprocity CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Gradual opening of the market July 2, 2015 - Government’s decision on the status change of "Zeleznice Srbije", separation with the establishment of new joint-stock companies: § "Zeleznice Srbije plc“ - a technical consulting company with assigned debts § "Infrastruktura Zeleznice Srbije" - manages the railway infrastructure of the Republic of Serbia § "Srbija Voz"- transport of passengers § “Srbija Kargo"- transport of goods in accordance with EU regulations as well as with relevant Law of the Republic of Serbia. CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Gradual opening of the market § February 2016. - "Infrastruktura Zeleznice Srbije" published its first Network Statement - an impulse needed for the final opening of Serbian railway market. § June 2016. - The first contract on the use of railway infrastructure signed with the railway undertaking “Kombinovani prevoz” § 14 undertakings on the railway market, with a valid license for railway transport. § Only one company registered for the carriage of passengers, others are registered for freight transport. § Only five companies have a safety certificate for railway transport issued in accordance with the new EU regulations, and they include Part A and Part B of the safety certificates. CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Directorate for Railways § Established in 2005 by the Law on Railways (‘Official Gazette of RS’, No 18/05, repealed by No 45/2013), as a special organization of the Republic of Serbia for the field of railway transport § Legal entity § MC is appointed by the Government upon the proposal of PM CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Directorate for Railways Law on Railways adopted in May 2013 ("Official Journal of the RS", No 45/2013, 91/2015) reinforced the role of the DfR assuming the functions of a: § Regulatory body § Licensing authority and § National safety authority CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Regulatory function Article 93 DfR decides upon complaints of the applicants for the train path allocation, particularly having in mind possible unfair conduct or discrimination by the Infrastructure Manager or Railway Undertakings in relation to the following: § Network Statement § criteria determined in the Network Statement § train path allocation procedure and its outcome § manner of determination of the charges for the use of train path § levels or structure of the charges for the use of train path CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia TAC scheme § Government’s Regulation - methodology for evaluation of the elements for determining track access charges § In line with Regulation 2015/909/EU regarding direct costing principle § Further harmonization with new Methodology CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia TAC scheme § The subject of the methodology is to evaluate the elements for determining the charge for the minimum access package and the package for track access to service facilities and the provision of services in service facilities § Based on the principle that carriers only bear the justified costs of IM and costs arising from the efficient provision of services that users require § Based on an economic principle known as marginal cost plus (MT +) - marginal costs plus added mark up CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia TAC scheme Marginal costs estimated based on variable costs that include: § short-term marginal costs - wear and tear of tracks, management of train traffic and signaling, fuel consumption and overheads (costs of Timetable planning and the administrative costs of processing requests for track access) § reconstruction costs and financial costs of loan for renewal of the infrastructure CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia TAC scheme The elements on the basis of which the fee is determined are: § category of railway lines (main, regional or local) § use of junctions § category of train (passenger or freight) § type of traction (electric or diesel) CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia TAC scheme § Charge’s calculation units are : 1) Train kilometers 2) Gross tone – kilometers § TAC scheme is primarily based on the cost allocation model CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Types of services 1) Minimum access package (Category I) § Handling of requests for railway infrastructure capacity § Use of infrastructure on the main track § Train control including signalling, regulations, dispatching, communication systems and provision of information on train movements § Providing all other information necessary for operating the service for which capacity has been granted CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Types of services 1) Minimum access package (Category I) § TAC based directly on the use of infrastructure § Consequence of the cost of trains running along the lines. CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Types of services 1) Minimum access package (Category I) NKI = (ΣVKMijk · CVKMijk) + F · (ΣBRTKMij · CBRTKMij) § i – category of railway line § j – category of train § k - type of traction § VKMijk - the number of train kilometers on the network § CVKMijk - charge per one train kilometer § F - factor depending on the category of the train § BRTKMij - number of gross tone-kilometers on the network § CBRTKMij – charge per gross tone-kilometer CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Types of services 2) Track access to service facilities (Category IIa) and to the services supplied in these facilities (Category IIb): § passenger stations, their buildings and other facilities § freight terminals § marshalling yards and train formation facilities, including shunting facilities § storage sidings § maintenance facilities § refuelling facilities CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Types of services 2) Track access to service facilities (Category IIa) and to the services supplied in these facilities (Category IIb): § Services of using the infrastructure capacities in the node as well as the wear of the tracks when using them § On the basis of the ownership § Conclusion of separate contract CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia § l - node § m - Category of trains Types of services § § n - Type of traction Valmn - the number of trains in the node 2) Track access to service facilities (Category IIa) and to § CValmn - charge per train of used infrastructure capacity in the services supplied in these facilities (Category IIb): the node § BRTKMlm - the number of gross NKII = NKIIa + NKIIb tone-kilometers in the node Track access § CBRTKMlm - charge per gross- tone kilometer in the node § NKIIa = (ΣValmn · CValmn) + (ΣBRTKMlm · CBRTKMlm) § Vblm - number of trains to which the service is provided (which Providing of services are "serviced") in the node § NKIIb = ΣVblm · CVblm § CVblm – charge per train "serviced" in the node CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Types of services 3) Additional services (Category III): § traction current § control of the transport of dangerous goods § assistance in the transport of trains with special consignments § other additional services CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Types of services 4) Ancillary services (Category IV): § Access to telecommunication network § Provision of supplementary information § Technical inspection of rolling stock CHRISTINE meeting Riga, 20-21. September 2017. Directorate for Railways Republic of Serbia Thank you for your attention! Jana Cirkovic Directorate for Railways www.raildir.gov.rs e-mail: [email protected] CHRISTINE meeting Riga, 20-21. September 2017. CHRISTINE XI minutes 24 Kugu st. , Riga, Latvia September 20 – 21, 2017 Meeting participants : Stefan Wiedrin ( ÖBB-Infrastruktur AG ) Karl Heinz Codemo ( ÖBB-Infrastruktur AG ) Jessica Tumerelle ( Infrabel ) Sebastien Lejeune ( Infrabel) Dino Džafo ( HŻ Infrastruktura ) Jan Nevola ( SŽDC ) Ladislav Velechovský ( SŽDC ) Bjørn Nielsen Banedanmark ( Hanne ) Réseau Julien Brunel ( SNCF ) Réseau Ferdinand Marterer ( SNCF ) Matthias Fett ( DB-Netz ) Wolfram Merzyn ( DB-Netz ) Giulio Rocco Sitongia ( RFI ) Justina Hudenko ( LatRailNet ) Maris Andiņš ( LatRailNet ) Eriks Pjatkins ( LatRailNet ) Oskars Stūrmanis ( Latvijas Dzelzceļš ) Tatjana Kontijevska ( Latvijas Dzelzceļš ) Adlert Gritter ( Pro Rail ) Julianne Wormsbecher ( Pro Rail ) Pieter van Klaveren ( Pro Rail ) Andrzej Bzdyra ( PLK ) Jaroslaw Wróbel ( PLK ) Ana Salavessa Coutinho ( IP ) Reyes Pinilla ( Adif ) María Álvarez ( Adif ) Pär-Erik Westin ( Trafikverket ) Kjell Kolden ( BAV ) Sigitas Kubilis ( LG ) Martynas Maksimovas ( LG ) Kaur Kajak ( TJA ) Taavi Laja ( TJA ) Heigo Saare ( TJA ) Jana Ćirković ( Diroctorate for Railways ) C hairman of the meeting : J.Hudenko R ecording secretary : E.Pjatkins Day 1: September 20 9:3 0 am - 6:30 pm Introduction part - Presentation of participants and organizational instructions [presented by LatRailNet] - Latvian Railway presentation [presented by Latvijas Dzelzcels] Working session: TAC Differentiation tools - Benchmark TAC 2018 [presented by ÖBB] - Changes in TAC system [presented by HŽ Infrastruktura] - Noise differentiated TAC [presented by BAV] Working session: Market segmentation and mark-ups - Ramsey-Pricing and price elasticities [presented by ÖBB] - Market segmentation and mark-ups in freight [moderated by BAV] : segmentation and mark-up levying approaches differ from country to country. Working session: Factors affecting track maintenance costs - UIC documents usage in cost allocation [presented by ProRail] - Comparative analysis of legal frame and other f actors affecting TAC benchmark [presented by LatRailNet] Day 2: September 21 9:30 am – 2:00 pm : Working session: Other topics and conclusions of CHRISTINE - German TAC system and experience with the regulatory body [presented by DB-Netz] . Discussions: do decisions of regulatory body are binding? - Network area [presented by LatRailNet] CHRISTINE community declines the idea of creating and maintaining web page. - Conclusions of the CHRISTINE session and next venue : the next CHRISTINE meeting will be held at Portugal, Lisbon. All members of CHRISTI N E agree . Discussions: Information exchange among CHRISTINE, PRIME and Commission [moderated by ADIF] : CHRISTINE and PRIME groups have different goals and have to remain as separate working platforms CHRISTINE &amp; PRIME JOINT SESSION: - Presentation of Estonian railway and Charging scheme [presented by TJA] - Presentation of Lithuanian railway and Charging scheme [presented by LG] - Presentation of Serbian railway and Charging scheme [presented by DR] Presentations annexed Saatja: Ēriks Pjatkins <[email protected]> Saaja: [email protected], Wiederin Stefan (INFRA.Netzzugang), [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], Rónai Péter, Urvald Krisztián, CIUFFINI FRANCESCA, SITONGIA GIULIO ROCCO, Aldert Gritter, [email protected], [email protected], [email protected], Wróbel Jarosław, Ana C.M.F. Salavessa da Costa Oliveira Coutinho, [email protected], [email protected], Álvaro Mascaraque, [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], Kaur Kajak, Taavi Laja, Heigo Saare, [email protected], Justina Hudenko Teema: Minutes and prezentations of 11th CHRISTINE conference. Dear colleagues, On behalf of the LatRailNet I would like to thank you once again for taking part and making presentations at the 11th CHRISTINE meeting! With the consent of CHRISTINE members who had a presentation at the CHRISTINE conference, I am sending the meeting minutes with attached presentations. Speaking of which, would you be so kind as to check the data from benchmarks in ÖBB-infrastructur presentations, if you find any wrong data, please inform Wiedrin Stefan. Presentations are uploaded as one whole pdf file with bookmarks. Best regards, Ēriks Pjatkins Assistant manager AS "LatRailNet" E-Mail: [email protected] <mailto:[email protected]> www.ldz.lv <http://www.ldz.lv/> The information in this e-mail is confidential. The e-mail is intended solely for the indicated addresse. Mailbody unauthorized disclosure, distribution or modification is prohibited and may be regarded as an illegal action. If you are not the recepient of this e-mail, please inform the sender and delete the e-mail from the system.
Allikas: Tarbijakaitse ja Tehnilise Järelevalve Amet dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel